ML19340E389
| ML19340E389 | |
| Person / Time | |
|---|---|
| Site: | Summer |
| Issue date: | 11/06/1980 |
| From: | Satterfield E Office of Nuclear Reactor Regulation |
| To: | Reinmuth G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| References | |
| NUDOCS 8101140251 | |
| Download: ML19340E389 (1) | |
Text
_-
I,
/ '.
g ** "' Cory 0,
UNITED STATES
[44 i
NUCLEAR REGULATORY COMMISSION p2/
w I
WASHINGTON D. C. 20555 n\\r lki !
=
NOV 6 1980
...../
72EFORY DOCW E CD?Y MEMORANDUM FOR:
G. W. Reinmuth, Assistant Director, Division of Reactor Construction Inspection, IE FROM:
R. M. Satterfield, Chief, 4
Instrumentation and Control Systems Branch, DSI
SUBJECT:
SEPARATION REQUIREMENTS FOR CLASS lE REDUNDANT INSTRUMENTATION CABLES INTERNAL TO THE PROCESS INSTRUMENTS AND CONTROL CABINETS Your memorandum dated October 29, 1980 requests ICSB review of the adequacy of cable separation inside the Westinghouse 7300 series process control cabinet.
A specific application is related to the Virgil Summer Station design. Since we have scheduled a site visit to the Virgil Summer Station on November 12-14, 1980, we will pursue this subject during our site visit and provide our evalua-tion following the site visit. We will keep you advised of our findings and any generic concerns resulting therefrom.
00h:Q k'R.M.Satterfield, Chief Instrumentation and Control I
Systems Branch, DSI cc:
P. Check A. B. Bennett T. Dunning
- .1 H. Li CONTACT:
H. Li X29433 8101140 451 A
- - -