ML19340E325
| ML19340E325 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point, Farley |
| Issue date: | 12/11/1980 |
| From: | Dircks W NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO) |
| To: | Ahearne J, Gilinsky V, Hendrie J NRC COMMISSION (OCM) |
| References | |
| NUDOCS 8101140036 | |
| Download: ML19340E325 (3) | |
Text
M*
(oM 0'
p- - %g a-f@0 UNITED STATES y%
g g
NUCLEAR REGULATORY COMMISSION r,,
f WASHINGTON, D. C. 20555
%...../
December 11, 1980 19 b
r3 o
UC 5
MEMORANDUM FOR: Chairman Ahearne
!3Qij 4
s Comissioner Gilinsky
~g L-Mij Comissioner Hendrie g5 Commissioner Bradford g
m g
w FROM:
William J. Dircks, Executive Director for Operations
SUBJECT:
DAILY STAFF NOTES, DECEMBER 10, 1980 IE_
l.
Farley Unit No. 2~ (Alabama Power) - Concrete Block Wall Deviations, (PNO-II-80-170).
2.
Turkey Point, Units 3 d 4 (FP&L) - Breach of Radioactive Waste Package Integrity,(PNO-II-80-171).
3.
Hatch 1 and 2 (Georgia Power) - Offiste Survey of Waste Oil Dealers, (PNO-II-80-172).
_Jo se oh M. Fa rl e v, Uni t No. 1 On December 8,1980, we were advised by Alabama Power Company of preliminary results of the Farlep Unit No. I turbine disc examination.
The turbines have completed two core cycles of operation since plant licensing in June 1977 Test results for low pressure discs revealed keyway and bore cracks in disc-number one and keyway cract:s in dise number 2.
Testing is still under way on the remaining discs.
i 810114 06tw
REGION I PLANT STATUS-12/10 J
==__
_ = _ _ _ _ -
PLANT NAME PLANT STATUS REASON OR COMMENT
________________________% POWER _DOWN__________________________________ R
__DATE__
BEAVER VALLEY 1 1
90 1
1 SOAKING CORC 1%/HRt WILL BE I
I AT 100% TOMORROW CALVERT CLIFFS 1 1
I X
l REFUELING 1 12/15 CALVERT CLIFFS 2 1
72 I
i COASTING COWN I
F8T2 PATRICK 100 I
I l
GENNA i 100 1
I i
HADDAM NECK I 100 1
I I
2NDZAN POINT 2 I
I X
l REFUELING AND REPAIR FAN I
6/81 COOLERS I
8NDIAN POINT 3 X
I X
! REPLACE 2 RCP SEALS I
MILLSTONE 1 1
1 X
l REFUELING 1/15 M2LLSTONE 2 1 100 1
NINE MILE POINT 1 I
92 i
! COAST DOWN I
OYSTER CREEK
! 100 t
t PEACH BOTTON 2
! 100 I
FEACH BOTTOM 3 1 100 P!LGRfM 1 1 100 I
I t
SALEM i i
I X
1 REFUELINO/ CHECKING SEISMIC
- 12/13 1
1 DESIGN I
SALEM i
X
! AWAITING LICENSE THREE MILE ISLAND 1 i
X
! NRC ORDER I
THREE MILE ISLAND 2 I
X
! NRO ORDER I
VERMONT YANKEE I
I X
- REFUELING
- 12/22 YANKEE ROWE I 100 l
I REGION II PLANT STATUS-12/10 PLAMT NAME PLANT STATUS REASON OR COMMENT RESTART
_______.________________% POWER __DOWN____________________________________DATE__
BROWNS FERRY 1 1
99 1
BROWNS FERRY 2 81 1
! PRECONDITIONINO AT 10 MW/HR/ ROD PATTERN ADJUSTMENT BROWNS FERRY 3 I
I X
X REFUELINO I
1/9 BRUN5 WICK 1 99 I
I i
BRUMSWICK 2 1
X
- FW HEATER OUTAGE /WILL 00 TO I
I i
POWER TODAY I
- RVsTAL RIVER 3 1
60 1 FW PUMP REPAIR I
FARLEY 1 I
I X
! REFUELING 1
HATCH 1 80
! LIMIT HATCH 2 I
I X
X REFUELING 2/1 NURTH ANNA 1 100 1
NORTH ANNA 2 I
X l TRANSFORMER AND BUSS REPAIRS 1 12/12 OCONEE 1 I
99 I
I I
OCONEE 2 1
99 OCONEE 3 X
- REFUELINO t
FOBlNSON 2 1
1 X
l MAINTENANCE t 12/12
?EDOOYAH 1 l
1 X
l COLD SHUTDOWN - MAINTENANCE I 12/13 e.T. LUCIE 1 1 100 1
1 1
SURRY i l
X S.
O. REPLACEMENT 8/81 SURRY 2
- 100 1
TURKEY POINT 3 75 l
1 MONITORING SEPARATOR LEAK I
1 1
REPAIR l
IURKEY POINT 4 I
i X
- REFUELINO 1/15
D' " "
W A
REGION III PLANT STATUS-12/10
,# 5 J.L,m_
_.m PLANTaNAME
~ ~
PLANT STATUS REASON OR COMMENT RESTART
.J _
________% POWER __DOWN__ __ _____________=
_______DATE__
BIG ROCK POINT l
t X
1 REFUELINO 1/7 COOK 1
! 100 I
COOK 2 1
X l MAIN GENERATOR REPAIR I 12/10 DAVIS-BESSE 1 1
55 1
1 RC PUMP SEAL AND FW SPIKING DRESDEN 1 I
X l CHEMICAL CLEANING l INDEF DRESDEN 2 1
47 i COASTDOWN I
DRESDEN 3 1
99 I
I i
DUANE ARNOLD l
99 I
I I
KEWAUNEE I 100 I
l LACROSSE I
1 X
! REFUELING 1/31 LASALLE I
X l AWAITING LICENSE I
MONTICELLO I 100 PALISADES l
X
! STARTING UP/ CRITICAL TODAY l 12/25 POINT BEACH 1 X
l REFUELING
! 12/25 POINT BEACH 2 I 100 1
PRAIRIE ISLAND 1 1 100 t
PRAIRIE ISLAND 2 1 100 1
1 OUAD CITIES 1 I
X l REFUELINO I 12/21 OUAD CITIES 2 i
80 I
! INCREASING IN I
i 1
POWER / PRECONDITION!NG 1
dZION 1 I
l X
1 TRIP FROM 25% POWER l
ZION 2 91 1 AT LIMIT WITH FEEDWATER I
HEATER QUT REGION IV PLANT STATUS-12/10 PLANT NAME PLANT STATUS REASON OR COMMENT RESTART
_______________________% POWER __DOWN_____________
___________________DATE__
"RKANSAS 1 1
65 I
l 3 PUMP OPERATION l ARKANSAS 2 X
! COLD SHUTDOWN /CVCS LEAK
- COOPER l
98 I
I l
FORT CALHOUN I
75 I
I ADMINISTRATIVE CONTROL (FUEL l
8 I
I CONSERVATION) 1 FORT ST. VRAIN I
68 1
! 70% LICENSE LIMIT REGION V PLANT STATUS-12/10.
l PLANT NAME PLANT STATUS REASON OR COMMENT RESTART
_ _________ _% POWER __DOWN _ __ _
=DATE__
DIABLO CANYON t
X l AWAITING LICENSE I
I RANCHO SECO i 100 1
SAN ONOFRE I
X l STEAM GENERATOR TUBE REPAIR 4/16 THOJAN
- 100 l
l
+ - PEASON OR COMMENT HAS CHANGED IN PAST 24 HOURS l
,# - REACTOR SCRAM WITHIN PAST 24 HOURS TJOTE - REACTOR STATUS DATA COLLECTED BETWEEN 6 A.
M.
AND 8 A.
M.
EACH DAY EXCEPT HOLIDAYS AND WEEKENDS 7
w