ML19340E302

From kanterella
Jump to navigation Jump to search
EN-80-56:on or About 801219,notice of Violation & Notice of Proposed Imposition of Civil Penalty in Amount of $4,000 Will Be Issued to Licensees.Action Based on Alleged Item of Noncompliance Re Shipment of Waste Not Packaged Properly
ML19340E302
Person / Time
Site: Dresden  
Issue date: 12/17/1980
From: Metzger J, Thompson D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
To:
References
EN-80-056, EN-80-56, NUDOCS 8101130140
Download: ML19340E302 (1)


Text

-

December 17, 1980 OFFICE OF INSPECTION AND ENFORCEftENT EN-80-56 NOTIFICATION OF SIGT1IFICANT ENFORCEf;ENT ACTICH

,.m Licensee: Commonwealth Edison Company, Chicago, Illinois (Dresden Nuclear Power Station)

Cucket Nos.50-010; 50-237; 50-249

Subject:

PROPOSED IMPOSITION OF A CIVIL PENALTY - 54,000 e

This is to inform the Commission that a Notice of Violation and a Fbice of Proposed Imposition of a Civil Penalty in the amount of Four Thousand Dollars'will t[e' issued on or about December 1 9 1980, to Comr:onwealth Edison Company. This action is based on an alleged item of noncompliance relating to the shipment of waste material from the Cresden Station which when received at the Richland, Washingt90 burial site was not packaged in a strong, tight package and the lid on one bin was not bolted dov.;

and was easily removed. A news release has been prepared and will be issued about the time the licensee receives the Notices. The State of Illinois will be notified.

It should be noted that the licensee has not been specifically informed of the enforce-ment action. The schedule of issuance and notification is:

Action Signed 12/17/80 Mailing of Notices 12/19/80 Telephone Notification of Licensee 12/19/80

' Telephone Notification of State 12/19/80 NRC News Release to be made following notification of Licensee The licensee has 25 days from the date of the f;otices in which to respond.

Following.

NRC staff evaluation of the response, the civil penalty may be remitted, mitigated or imposed by Order.

Contact:

JMetzger, IE 28188 DThompson, IE 28487 Distribution:

TransmittedH.St.$*.3[

Chairman Anearne Comissioner Bradford C. C. Kammerer, CA Commissioner Gilinsky S. J. Chilk, SECY E. J. Hanrahan, PE Commissioner Hendrie ACRS (For distribution)

Transmitted: MNBB

3((

P. Bl d g. 'f '. d-IE:HQ W. J. Dircks, EDO H. R. Denton, NRR C. Michelson, AE00 R. H. Vollmer, *;RR Landow ft M (6 Min)

J. J. Fouchard, PA F. Schroeder, NRR J. J. Cummings, OIA N. ft. Haller, MPA D. F. Ross, NRR G. W. Kerr, OSP

0. Eisenhut, NRR Mail H. K. Shapar, ELD e_ 4:

S. H. Hanauer, NRR R. Smith, SD f.9UO Document Mgt. Br. (PCR -& LFP Regional Offices KL-T*.o Willste Bldg. f' 47 President's Oversight Comm.

jg sot a J. G. Davis, MNSS g,.g :g 1 R. 2. Minogue, RES PRELIMINARY IrlFORMATION - NOT FOR PL'SLIC DISCLOSURE UNTIL 12/19/80

/

810113 ONO

- - -