ML19340E065
| ML19340E065 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 12/15/1980 |
| From: | Check P Office of Nuclear Reactor Regulation |
| To: | Novak T Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8101060298 | |
| Download: ML19340E065 (2) | |
Text
Shf',
... gt; g
?
DEC 151350 q
.i O
p MEMORANDUM FOR: Thomas Novak, Assistant Director for Operating Reactors.
Division of Licensing FROM:
Paul S. Check, Assistant Director for Plant Systems, Division of Sy. stems Integration
SUBJECT:
QUESTIONS ONNEDO-24085-1, " LOSS-OF-COOLANT ACCIDENT /'MLYSIS REPORT FOR MILLSTONE UNI _T.1 NUCLEAR POWER STATION" (TAC 4282 Tne Reactor Systems Branch is reviewing KD0-24085-1 as part of the reload f7 review for Millstone-l. Responses.to.the enclosed quettions are needed for us to complete our review. Although the. reload package was submitted in September, Reactor Systems was.not. asked to participate in the review until the last week of November. Therefore tilis 1.s an expedited review and the questions have been informally transmitted.to the licensee through the project manager to facilitate a rapid response..
.,,;.v. ea 57 p x; s.4.L.c4 Paul S. Check, Assistant Director for Plant Systems Division of Systems Integration Enclosure-As stated cc:
T. Speis G. Mazetis B. Sheron l
V. Panciera J. Shea W. Hodges
Contact:
W. Hodges x-29454 j
l
[
8103000j27F'L
[
m.
76,i4
/
.k
,i,
. SB:DSI
,,lg DSQ AO:PSdSI ornce h...RSB,: DS I,,,,R d WHod, P
is PSCheck SURNAME y'........ges /.bm.l.GMa2etis 4
! 12/1/80.....
l 12/,/80 12/10/80 12h/80 care ):.
i.
.q.
p:.
. l.
7
(
Z roe, 2 ;, v u,c
.o
' 12.s. ce ve a~yc~r on ~rinc orrice, iii,.2,9 36,
t**"2%,
p f
' s UNITED STATES f j.
,['
i NUCLEAR REGULATORY COMMISSION Cd/
f MSMNGTON. O C. 20555 r, b e f f g
4,
.e E : 1
'950 MEMORANCUM FOR: Thomas Novak, Assistant Director for Operating Reactors, Division of Licensing
?RCM:
Paul S. Check. Assistant Director for Plant Systems, Division of Systems Integration
SUBJECT:
CUESTIONS ON NECO-24085-1, " LOSS-OF-CCCLANT ACCIDENT ANALYSIS REPORT FOR MILLSTONE UNIT 1 NUCLEAR POWER STATION" (TAC 42822)
The Reactor Systems Brancn 13 reviewing NE00-24085-1 as part of the reload *7 review for Millstone-l.
Responses to the enclosed ouestions are neecec for us to complete our review. Altnaugn the reload package was submitted in Septemoer, Reactor Systems was not asked to participate in the review until tne last week of Novemoer. Therefore, this is an expedited rev13w and the
- uestions have been informally transmitted to tne licensee tnrough the project manager to facilitate a raoid response.
Paul S. Check, Assistant Director for Plant Systems Division of Systems Integration
Enclosure:
As stated cc:
T. Soeis G. Ma:etis B. Sheron
'/. Danciera J. Shea W. Hodges W. Jonnston C:ntact:
W. Hodges x-2945J V
v
=
i e
w 6
.a.
Questions on NECO-24085-1
- 1) Are 3 cr J SRV's assumed cperable for the LOCA analysis? If 4, provice curves showing the improvement in going from 3 to 4
- 2) Discuss input values which cause MAPLHGR slepe to change drastically beycnd 30,C00 WD/T burnup.
- 3) Fig. 2, p. 5 J shows no apparent cnange in slope between adiacatic heat-up period following uncovery of hign pcwer axial planes and period with spray cooling. Please explain.
- 4) Pig. 9
- p. 5-11/12 shows '"< inks" in PCT curve during adiacatic heat-up period.
Please explain.
L