Responds to IE Bulletin 80-21, Valve Yokes Supplied by Malcolm Foundry Co,Inc. Specified Valves Are Not Installed at Facility
ML19340D953
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 12/05/1980
From: Crouse R
TOLEDO EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
1-176, IEB-80-21, NUDOCS 8101050626
Download: ML19340D953 (1)


Text

1 8

?

n

~

Docket No. 50-346

.C TOLE 00

% EDISON License No. NPF-3 A:Cw&D P C10 SE Serial No. 1-176

'a #-t u w,a

'41 Erl 2$1",2 2 I December 5, 1980 a

-m c,

Mr. James Keppler

~

~'

Regional Director, Region III Office of Inspection and Enforcement b

U. S. Nuclear Regulatory Ccarission f!

~j 799 Rocsevelt Road M

or

-7 Glen Ellyn, Illinois 60137 C

3 u

Dear Mr. Keppler:

Toledo Edison has reviewed the active valves in safety related systems at Davis-Besse Nuclear Power Station as requested by IE Bulletin No.

'S0-21, Log 1-437.

Toledo Edison Company has not installed any valves that have parts cast by Malcolm Foundry.

This is considered to be the complete response to the above Bulletin.

Yours very truly, ffk= = = -

RPC:TDM:PNC: sic cc: NRC DB-1 Resident Inspector Director, NRC Office of Inspection and Enforcement Washington, D. C.