ML19340D493
| ML19340D493 | |
| Person / Time | |
|---|---|
| Site: | Marble Hill |
| Issue date: | 12/18/1980 |
| From: | Wong H NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| To: | Sniezek J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE) |
| References | |
| NUDOCS 8012300701 | |
| Download: ML19340D493 (3) | |
Text
... _.-
j =
- reg a
l
,(
,,e UNITED STATES
~o i
g
, s-q,' g NUCLEAR REGULATORY COMMISSION
- , ' ". '. E WASHINGTON, D. C. 20555 i
s..-
DEC 1 g 1980 Docket No. 50-545
-547 MEMORANDUM FOR:
J. H. Sniezek, Director, Division of Resident and Regional Reactor Inspection, IE FROM:
H. J. Wong, Civil Structural Engineer, Mechanical, Structural and Metallurgical Section, RRRI, IE
SUBJECT:
FORTHCOMING MEETING WITH PUBLIC SERVICE COMPANY OF INDIANA, INC.
i ON CADWELD DEFICIENCIES AT MARBLE HILL NUCLEAR GENERATING STATION, UNITS 1 AND 2 Date and Time:
Thursday, January 8,1981 9:00 a.m.
3 Location:
Phillips Building Room P-ll8
'~
Purpose:
To discuss the results of inspections and additional testing performed by Publi. Service Company of Indiana, Inc. relating to cadwelds at Marble Hill Units 1 and 2 (see enclosed Agenda).
l Pa rticipants :
Public Service Co. of Indiana, Inc.
D. Ingmire Saraent and Lundy
- 0. Zaben A. Morcos A. Weiss NRC D. Hayes R. Lipinski H. Wong D. Jeng J. Henderson G. Arndt S. Chan H. Ashar Y'
~
wp'.
Howard J.
ong, Civil Structural Engineer Mechanical, Structural and Metallurgical Section Reactor Engineering Branch Division of Resident and Regional Reactor Inspection, IE g012 300
is l
B C)
J. H. Sniezek 2
. g, 8 1980 L',
u
- 1
Enclosure:
Meeting Agenda cc: w/ enclosure Docket File NRC PDR Local PDR TIC dtSIC DEisenhut RPurple TNova k Riedesco BYoungblood JWilson Glainas RVollmer Jr, night FSchauer VNoonan Dross ACRS (16)
OELD OSD Receptionist - Phillips TEPA JKeppler, RIII GFiorelli, RIII CWilliams, RIII NRC Participants
AGENDA FOR MEETING ON "CADWELDS AT MARBLE HILL" Agenda A.
Background of Cadweld Data 1.
Construction Verification Program at Marble Hill a.
Visual Inspection Results b.
Radiography Results c.
Tensile Test Results 2.
Production and Sister Splice Test Results 3.
Similarities and Differences Between Accessible and Inaccessible Cadwelds (Locations of Inaccessible)
B.
PSI Evaluation of Adequacy of Embedded and Accessible Cadwelds C.
NRC Con: erns 1.
Stress / Strain Measurements 2.
Adequacy of Embedded Cadwelds 3.
Others as identified l
1 l
l
!