ML19340D045
| ML19340D045 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 12/03/1980 |
| From: | Clayton F ALABAMA POWER CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| IEB-80-23, NUDOCS 8012180611 | |
| Download: ML19340D045 (1) | |
Text
At:bama Power Company 3 ((h
- 600 North 18th st eet m"
Post Offica Bc i 2641
)
Birmingham, AZbama 35291
]
's o
Telephone 205 250-1000 v
C bb'Alab5ma Power F. L CLAYTON, JR.
T Senior Vice President a thesouttirthelectrbSyhem a
December 3, 1980 rU Docket No/50-348 )
Nd. 50-364/
vv Mr. James P. O'Reilly U. S. Nuclear Regulatory Commission Region II, SJite 3100 101 Marietta Street N. W.
Atlanta, Georgia 30303
Dear Mr. O'Reilly:
I.E.Bulletin 80-23, entitled " Failures of Solencio Valves Manu-factured By Valcor Engineering Corporation," requested that each licensee determine whether Valcor solenoid valves were used to perform safety-related functions in their f6cilities.
In accordance with this request, Alabama Power Company conducted a review of safety-related systems at Farley Nuclear Plant Units 1 and 2.
It has been determined that no solenoid valves manufactured by Valcor have been utilized in any raf ty-e related function in either Unit 1 or 2 at Farley Nuclear Plant.
As requested in your letter transmitting tha subject bulletin, an estimated 16 manhours were expended in conducting this review.
If you have any further questions, please advise.
Yours very truly, 1
t Y C<.-wA r
F. b CTayton, Jr.
I RWS:rt cc: Mr. R. A. Thomas Mr. G. F. Trowbridge Mr. L. L. Kintner Mr. W. H. Bradford Office of I & E Division of Reactor Operations Inspection Office of I & E Division of Construction Inspection Mr. M. D. Hunt I & E, Region II Mr. E. A. Reeves 8012 7 P 0 d7#
Q J