TIIE CINCINNATI G AS & ELECTitIC CO.\\ll".\\ N Y l
Docket No. 50-358 December 9, 1980 Mr.
I. A.
Peltier Project Manager U.S.
Nuclear Regulatory Commission Phillips Building 7920 Norfolk Avenue Bethesda, Maryland 20014 RE:
WM.
H.
ZIMMER NUCLEAR POWER STATION -
UNIT 1 - RESPONSE TO IE BULLETIN 79-14 Gentlemen:
Attached for the use of NRR Staff is one copy of the CG&E response to IE Bulletin 79-14.
This material was previously submitted to the NRC's Region III Office of Ine 9ction and Enforcement on August 8, 1979.
Very truly yours, THE CINCINNATI GAS & ELECTRIC COMPANY By JAMES D.
FLYNN, Manager Licensing and Environmental Affairs JDF: dew Enclosure l
cc:
H.
C. Brinkmann D.
J.
Frederick G. M.
Pemberton W.
W. Schwiers 037 W.
D. Waymire 3
i.-
/4DD
_5ji
~
T. Pr/la
/
/
l 8 022170 !7(3 ck
k M LN 'wm A/ ITM
)N ~.
f~
.Ql 25;N "
~
W T11 E CINCIN NATI G Au & ELECTRIC COMPANY (pgpai2an YLDk p't ?
C. A. BoROM AN N
{
v<t eetticte -too'att easme i
~
U.S. Regulatory Commission e
, y, l
office Of Inspection and Enforcement
. -7 f
[
,g{ {y Region III 7999 Roosevelt Road pp P
Glen Ellyn, Illinois 60137
(
l k
ATTN:
Mr. James G. Keppler Regional Director RE:
'II. H. ZI'01ER NUCLEAR POWER STATION - UNIT 1 i n t.e -
IE_BL1LETIN_79-1'-f DOCKET 50-358
.[
IR si~
'#. O. 57300, JOB E-5590 In response to IE Bulletin 79-14, dated July 2, 1979, we submit the l
following:
Fo r WM. H. ZDDtER NUCLEAR POWER STATION - UNIT 1, all Seismic Category I systems are being verified that the seismic analysis applies to the actu tl piping configuration as a part of the Zimmer Construction Program. Field inspections are performed on each system to verify pipe support design and location, embed-ments, attachments, and valve location and orientation. The architect-engineer, l
Sargent & Lundy, also verifies actual valve and valve operator weights by the use of certified vendor data.
The field inspection data, in the form of marked-up drawings, are for-I warded to Sargent & Lundy to assess the validity of the original system analysis.
This work is performed on a sub-system basis and is illustrated by " Attachment A", Status of Piping Analysis, which shows the sequence for piping calculations, review, and reanalysis, if required. Sargent & Lundy submits sub-system packages to the field office for their review and comment to cover the as-built conditions for piping and pipe supports. " Attachment B",
letter SLC-12875, is a typical trans-l mittal of a subsystem package.
i The field review and inspection of seismic pipe supports is governed by Construction Inspection Procedure MC-5, " Final Inspection of Pipo Supports".-
Attachment C. CGLE QA is responsible for audit and implementation of Procedure I
MC-5.
Installed supports which deviate from design drawings are reworked or Design modified to com 1"
4~
b a
Document Change
<t Internal DU?LICATE DOCUMENT g analysis are governed by Piping Anal-ysis, Hanger and Entire document previously at D.
For illustrative pur entered into system under:
rnal trans-mittals which de uction Pro-79
((hh[4-cedure for a tyr ANO No. of pages:
df