Forwards Previously Submitted 790808 Response to IE Bulletin 79-14.Seismic Analysis Applies to Actual Piping Configuration as Part of Facility Const Program
ML19340C810
Person / Time
Site: Zimmer
Issue date: 12/09/1980
From: Flynn J
CINCINNATI GAS & ELECTRIC CO.
To: Peltier I
Office of Nuclear Reactor Regulation
References
IEB-79-14, NUDOCS 8012170502
Download: ML19340C810 (1)


Text

l I

TIIE CINCINNATI G AS & ELECTitIC CO.\\ll".\\ N Y l

Docket No. 50-358 December 9, 1980 Mr.

I. A.

Peltier Project Manager U.S.

Nuclear Regulatory Commission Phillips Building 7920 Norfolk Avenue Bethesda, Maryland 20014 RE:

WM.

H.

ZIMMER NUCLEAR POWER STATION -

UNIT 1 - RESPONSE TO IE BULLETIN 79-14 Gentlemen:

Attached for the use of NRR Staff is one copy of the CG&E response to IE Bulletin 79-14.

This material was previously submitted to the NRC's Region III Office of Ine 9ction and Enforcement on August 8, 1979.

Very truly yours, THE CINCINNATI GAS & ELECTRIC COMPANY By JAMES D.

FLYNN, Manager Licensing and Environmental Affairs JDF: dew Enclosure l

cc:

H.

C. Brinkmann D.

J.

Frederick G. M.

Pemberton W.

W. Schwiers 037 W.

D. Waymire 3

i.-

/4DD

_5ji

~

T. Pr/la

/

/

l 8 022170 !7(3 ck

k M LN 'wm A/ ITM

)N ~.

f~

.Ql 25;N "

~

W T11 E CINCIN NATI G Au & ELECTRIC COMPANY (pgpai2an YLDk p't ?

C. A. BoROM AN N

{

v<t eetticte -too'att easme i

~

U.S. Regulatory Commission e

, y, l

office Of Inspection and Enforcement

. -7 f

[

,g{ {y Region III 7999 Roosevelt Road pp P

Glen Ellyn, Illinois 60137

(

l k

ATTN:

Mr. James G. Keppler Regional Director RE:

'II. H. ZI'01ER NUCLEAR POWER STATION - UNIT 1 i n t.e -

IE_BL1LETIN_79-1'-f DOCKET 50-358

.[

IR si~

'#. O. 57300, JOB E-5590 In response to IE Bulletin 79-14, dated July 2, 1979, we submit the l

following:

Fo r WM. H. ZDDtER NUCLEAR POWER STATION - UNIT 1, all Seismic Category I systems are being verified that the seismic analysis applies to the actu tl piping configuration as a part of the Zimmer Construction Program. Field inspections are performed on each system to verify pipe support design and location, embed-ments, attachments, and valve location and orientation. The architect-engineer, l

Sargent & Lundy, also verifies actual valve and valve operator weights by the use of certified vendor data.

The field inspection data, in the form of marked-up drawings, are for-I warded to Sargent & Lundy to assess the validity of the original system analysis.

This work is performed on a sub-system basis and is illustrated by " Attachment A", Status of Piping Analysis, which shows the sequence for piping calculations, review, and reanalysis, if required. Sargent & Lundy submits sub-system packages to the field office for their review and comment to cover the as-built conditions for piping and pipe supports. " Attachment B",

letter SLC-12875, is a typical trans-l mittal of a subsystem package.

i The field review and inspection of seismic pipe supports is governed by Construction Inspection Procedure MC-5, " Final Inspection of Pipo Supports".-

Attachment C. CGLE QA is responsible for audit and implementation of Procedure I

MC-5.

Installed supports which deviate from design drawings are reworked or Design modified to com 1"

4~

b a

Document Change

<t Internal DU?LICATE DOCUMENT g analysis are governed by Piping Anal-ysis, Hanger and Entire document previously at D.

For illustrative pur entered into system under:

rnal trans-mittals which de uction Pro-79

((hh[4-cedure for a tyr ANO No. of pages:

df