h5 IE G(jg
'o, UNITED ST ATES
!".#7 NUCLEAR REGULATORY COMMISSION REGION 111 o,
[
799 ROOSEVELT ROAD
,/
GLEN ELLYN. lLLINOIS 60137 OCT 2 8 500 State of Illinois Department of Public Health ATTN:
Mr. Gary N. Wright, Chief Division of Nuclear Safety 535 West Jefferson Street Springfield, IL 62761 Gentlemen:
The enclosed IE Supplement No. 3 to Bulletin 79-013 titled " Environmental Qualification of Class IE Equipment" was sent to the following licensees on October 27, 1980:
Action American Electric Power Company D. C. Cook (50-315, 50-316)
Ccmmonwealth Edison Company Dresden 3 (50-249)
Quad-Cities 1, 2 (50-254, 50-265)
Consumers Power Company Palisades (50-255)
Iowa Electric Light & Power Company Duane Arnold (50-331)
Northern States Power Company Prairie Island 1, 2 (50-282, 50-306)
Monticello (50-263)
Toledo Edison Company Davis-Besse 1 (50-346)
Wisconsin Electric Power Company Point Beach 1, 2 (50-266, 50-301)
Wisconsin Public Service Corporation Kewaunee (50-305)
Info rma tion Cincinnati Gas & Electric Company Zimmer (50-358) 8 012 3 '/ u 326 p
State af Illinois Cleveland Electric Ill. Company Perry 1, 2 (50-440, 50-441)
Commonwealth Edison Company Zion 1, 2 (50-295, 50-304)
Dresden 1, 2 (50-10, 50-237)
Braidwood 1, 2 (50-456, 50-457)
Syron 1, 2 (50-454, 50-455)
LaSalle 1, 2 (50-373, 50-374)
Consumers Power Company Big Rock Point (50-155)
Midland 1, 2 (50-329, 50-330)
Dairyland Power Company LACBWR (50-409)
Detroit Edison Company Fermi 2 (50-341)
Illinois Power Company Clinton 1, 2 (50-461, 50-462) i Northern Indiana Public Service Company Bailly (50-367)
Public Service of Indiana Marble Hill 1, 2 (50-546, 50-547)
Union Electric Company Callaway 1, 2 (50-483, 50-486) i Helen Pappas, Chief Administrative Branch
Enclosure:
IE Supplement No.
3 to Bulletin 79-01B cc w/ encl:
Mr. D. W. Kane, Sargent & Lundy Central Files Reproduction Unit NRC 20b l
AE0D Resident Inspector, RIII Local PDR NSIC TIC RII4 P6YXtd 10/27/80
SSINS No.:
6820 Accession No.:
9008220248 IEB Sup #3 to 79-01B UNITED STATES NUCLEAR REGULATORY COMMISSION I
0FFICE OF INSPECTION AND ENFORCEMENT
@D WASHINGTON, D.C.
20555
/
October 24, 1980 IE Bulletin No.'79-01B Supplement No. 3:
ENVIRONMENTAL QUALIFICATION OF CLASS IE EQUIPMENT Description of Circumstances:
Two issues were raised by Supplement No. 2 which require clarification.
These are:
(1) the dates required for submittal of qualification information for TMI related equipment, and (2) whether the equipment required to achieve a Cold Shutdown condition must be environmentally qualified if the licensing basis for the plant was a Hot Safe Shutdown condition.
(1) Supplement No. 2 (Q.1, Q.5) addressed the minimum cold shutdown require-ments.
The staff position on this issue is that the licensee must identify and environmentally qualify the equipment reeded to complete one method (path) of achieving and maintaining a cold shutdown condition.
The equipment of other paths must be reviewed to assure that its failure will not aggravate or contribute to the accidant (ref. Q.5 Supp. No. 2).
Due to an inconsistency between Supplement No. 1 and Supplement No. 2, the staff position on this issue was unclear.
Therefore, the following will apply:
a.
The qualification information for equipment needed to achieve and maintain a Hot Safe Shutdown condition must be submitted not later than November 1, 1980.
b.
The qualification information for equipment required to achieve and maintain a Cold Shutdown condition (ref. Q.1 and Q.5 of Supplement No. 2) must be submitted not later than February 1, 1981.
(2) IEB 79-01B required a 90 day response which was due in mid-April 1980.
Supplement 1 (Feb. 1980) informed licensees that equipment which was
" planned" to be installed as a result of lessons learned need not be addressed in that response.
Some of this equipment has since been installed.
Supplement No. 2 (Q.5, Q.21) identified that the staff posi-tion was that equipment which is installed should be treated in a manner similar to all other safety-related electrical equipment and be addressed in the November 1, 1980 submittal.
This position represents no change in staff position regarding the scope of the review.
However, since the sta'f position on this issue was unclear the following will apply:
a.
Qualification information for installed TMI Action Plan equipment must be submitted by February 1, 1981.
b.
Qualification information for future TMI Action Plan equipment (ref.
NUREG-0737, when issued), which requires NRC pre-implementation review, must be submitted with the pre-implementation review data.
IEB 79-01B Sup #3 October 24, 1980 Page 2 of 2 c.
Qualification information for TMI Action Plan equipment currently under NRC review should be submitted as soon as possible.
d.
Qualification information for TMI Action Plan equipment not yet installed which does not require pre-implementation review should be submitted to NRC for review by the implementation date.
The above items 1 and 2 represent no change in staff position regarding the scope of the 79-01B Supplement 2 review.
IE Bulletin No.79-01B was issued under a blanket GA0 clearance (B180225 (R0072), clearance expired July 31, 1980) specifically for identified generic problems.
Supplement No. 3 to Bulletin 79-01B is for information, hence no GA0 clearance is required.
i f
a
IEB 79-01 Sup #3 October 24, 1980 RECENTLY ISSUED IE BULLETINS Bulletin No.
Subject Date Issued Issued To Supplement 2 Environmental Qualification 9/30/80 All power reactor to 79-01B
.of Class 1E Equipment facilities with an OL 80-22 Automation Industries, 9/11/80 All radiography Model 200-520-008 Sealed-licensees source Connectors 79-26 Boron Loss from BWR 8/29/80 All BWR power Revision 1 Control Blades facilities with an OL 80-20 Failures of Westinghouse 7/31/80 To each nuclear Type W-2 Spring Return power facility in to Neutral Control Switches your region having an OL or a CP 80-19 Failures of Mercury-7/31/80 All nuclear power Wetted Matrix Relays in facilities having Reactor Protective Systems either an OL or a CP of Operating Nuclear Power Plants Designed by Combus-tion Engineering 80-18 Maintenance of Adequate 7/24/80 All PWR power reactor Minimum Flow Thru Centrifugal facilities holding OLs Charging Pumps Following and to those PWRs Secondary Side High Energy nearing licensing Line Rupture Supplement 2 Failures Revealed by 7/22/80 All BWR power reactor to 80-17 Testing Subsequent to fscilities holding OLs Failure of Control Rods to Insert During a Scram at a BWR Supplement 1 Failure of Control Rods 7/18/80 All BWR power reactor to 80-17 to Insert During a Scram facilities holding OLs at a BWR 80-17 Failure of Control Rods 7/3/80 All BWR power reactor to Insert During a Scram facilities holding OLs at a BWR 80-16 Potential Misapplication of 6/27/80 All Power Reactor Rosemount Inc., Models 1151 Facilities with an and 1152 Pressure Transmitters OL or a CP with Either "A" or "D" Output Codes
-