ML19340C553

From kanterella
Jump to navigation Jump to search
Forwards Lists of IE Personnel Onsite During First Five Days & Nuclear Reactor Regulation Personnel Onsite During First Six Days of TMI Incident.Info Being Processed & Evaluated
ML19340C553
Person / Time
Site: Crane 
Issue date: 08/13/1979
From: Sicilia P
NRC - NRC THREE MILE ISLAND TASK FORCE
To: Bernero R
NRC - NRC THREE MILE ISLAND TASK FORCE
References
TASK-TF, TASK-TMR NUDOCS 8012110112
Download: ML19340C553 (5)


Text

._

6

[

UNITED STATES e

't, NUCLEAR REGULATORY COMMISSION h

j WASHING TON, D. C. 20555 o,

E August 13, 1979 MEMORANDUM FOR: Bob Bernero FROM:

%ter Sicilia, Jr.

SUBJECT:

LIST OF PEOPLE ON SITE Attached as Enclosure 1 is a list of IE people on site during the first five days of the TMI incident. This information was recently provided to me from Region I management.

In an earlier memo to you "Sumary Trip Report, dated 7/19/79" I attached a list of NRR people on site during the incident, as provided to me from John Collins, NRR management. Attached as Enclosure 2 is the first six days of this list.

I am in the process of evaluating and verifying this information.

(Do not

{

consider this information as accurate and complete; it is as initially received and should be considered as a working document only.) By the end of this week, I hope to have enough information to prepare a list of all NRC people involved during the first six days at TMI, Region I IRC and HQ IRC.

mhbj k Peter Sicilia,~Jr.

Enclosures:

1.

IE People on Site 2.

NRR People on Site 8012110/I'd

IE PEOPLE ON SITE First vehicle - 3/28 (leave time 8:45 a.m.; arrival 12:05)

Higgins(0ps)

Gallina (Investigator)

Neely - H P Nimitz - H P Plumlee - H P Nearly all RI H P equipment Second vehicle - 3/28 (leave time 9:00 a.m.; arrival 11:00 a.m.)

RaySmith(Investi WaltBaunack(0ps) gator)

Third vehicle - 3/28 (leave time 1:00 p.m.; arrival 3:00 p.m.)

W. Raymond (0ps)

Fourth vehicle - 3/28 (leave time 8:20 a.m. from Millstone; site arrival 7:15 p.m.)

P. Stohr (Envir. S.C.

J. Kottan(Specialist) 1st IE mgmt.

Fifth vehicle - 3/28 (leave time 6:00 p.m.; arrival 8:20 p.m.)

R. Keimig (0ps S.C.)

2nd IE mgmt.

Sixth vehicle - 3/29 (leave time 9:00 a.m.; arrival noon)

F. Costello (FFMS)

T. Jackson (FFMS)

J. Serabian (FFMS)

B. O'Neill Seventh vehicle - 3/29 (leave time 9:00 a.m.; arrival 1 p.m.)

D.Haverkamp(0ps)

D. Beckman (0 s)

J. Johnson (0 s)

Eighth vehicle - 3/29 (leave time 4:00 p.m.; arrival 6:20 p.m.)

E. McCabe Ninth vehicle - 3/30 (leave time 1:30 p.m.; arrival 3:30 p.m.)

G. Yuhas FFMS J. White FFMS

1.. i Tenth vehicle - 3/30 Helicopter 2:30 p.m. - 4:00 p.m.

B. Grier Regional Director)

. Smith FFMS Branch Chief) i

)

Eleventh vehicle - 3/31 (leave time 2:00 p.m.; arrival 4:00 p.m.)

A. Toth Twelfth vehicle - 4/1 (leave time 2:00 p.m.; arrival 4:00 p.m.)

R. Bores D. Donaldson i

J. Glenn i

l l

i i

i I

f i

i l

1-I l'

i i

_.,. " ~

NRR CN SITE

" ARCH 29. 1979 MAN *GEMENT D. Vollmer (OPS)

COMMUNICATIONS / ANALYSIS J. Klingler (OPS)

PLANT PROCEDURES / SYSTEMS J. Mazetis (OPS)

C. Berlinger (0PS)

M. Chiramal (OPS)

F. Ashe (OPS)

H. Schierling (OPS)

EFFLUENTS / WASTE /HP E. Adensam (OPS)

(

MMCH 30.1979 l

MANAGEMEriT l

V. Stello (OPS)

D. Rost (TR)

H. Denton (TR)

D. Mossbur (TR)

B. Grimes TR) l l

C0"MurICATIONS/ ANALYSIS l

A. Thadani (OPS)

M. Taylor (0PS)

(OPS)

J.Olshinsky(0?S)

5. Neviberry N. Lauben (OPS) t

!GRCH 30. 1979 (cont'd)

EFFLUET;TS hlASTE /HF

';. Krecer (OPS)

T. Murphy (0?c' J. Collins u S;

. Bell (OPS)

'!. Benaroya (OPS)

J. Donognue (OPS)

OP. LICENSING / PROCEDURES J. Holman (OPS)

B. Boger (OPS)

REACTOR SYSTEMS T. Novak APRIL 1, 1979 MM;AGEf'E iT R. Mattson (TR)

APRIL 2. 1979

,,x......,_

.c.n ao S. Lynd S. Barnes J. Johansen ws.