ML19340C550

From kanterella
Jump to navigation Jump to search
Forwards Refinement of NRC Response Chronology of 790710-18 Site Visit.Chronologies Include Plumlee Interview,Ie Resident Status Log,Summary of Herbein Transient Log, Emergency Control Ctr Log & Observation Ctr Watchlog
ML19340C550
Person / Time
Site: Crane 
Issue date: 07/19/1979
From: Sicilia P
NRC - NRC THREE MILE ISLAND TASK FORCE
To: Bernero R
NRC - NRC THREE MILE ISLAND TASK FORCE
References
TASK-TF, TASK-TMR NUDOCS 8012110078
Download: ML19340C550 (11)


Text

s e

i UNITED STATES 3

NUCLEAR REGULATORY COMMISSION h

,j WASHINGTON, D. C 20555 1

,8

+..e July 19, 1979 MEMORANDUM FOR:

Robert Bernero FROM:

Peter Sicilia, Jr.

SUBJECT:

REFINEMENT OF CHRON0 LOGY - TASK GROUP 5 As part of our site visit of July 10-18, 1979, I reviewed several documents.

During this review I documented events that reflected NRC actions, especially those actions that would demonstrate an interface between the NRC and utility; and between major offices within the NRC. This documentation can be used to refine the event chronology documented by Task Group 5.

Attached you will find individual chronologies as described:

Plumlee Interview IE Resident Status Log Procedures Z & EP (limitad review)

Typed Summary of Herbein Transient Log Observation Center Watchlog TMI I Energency Control Center Log I feel we should realize (that) since we are reconstructing NRC's response, we should primarily use data that comes from NRC documents. Where we refine the chronologies using non-NRC type information like four of the six documents attached, we should footnote the entries explaining the source of the information.

/.

~

er S'c1 ia, Jr Attachments: As stated 80221100 %

p

.o PLUMLEE IE INVESTIGATION INTERVIEWS #271-272 NRC Events 3/28/79 10:00 AM NRC establishes (sets up) command post in o

Unit 1.

Direct contact w/R0-1 is established.

11:30 AM R0-1 requests independent surveys around exterior of reactor facility.

12:00 noon NRC reports results of survey to Region I.

1:20 P.M.

R0-1 requests independent surveys off site.

2:30 PM NRC reports results of survey to Region I.

7:00 PM R0-1 requests another offsite survey --

specifically - define isopleth, c:30 PM NRC reports results of survey to Region I.

NRC learns of mobile van tires problem.

10:00 PM NRC accompanies utility H/P's to survey.

3/29/79 12:30 AM NRC chases plume.

7:30 AM

" Readings" are called into R0-1 from Unit 2.

3/30/79 5:00-6:00 AM NRC looks at effluent releases (liquid).

Notes incorrect " totalizer" readings.

9:00 + AM NRC checks licensee controls.on primary coolant sample.

NRC stops sample shipment until correct container is used.

/

+

NRC-IE RESIDENT STATUS LOG NRC Events 4/1/79 No hour IE Reviewed emergency procedures:

1.

pressurizer degas, proc.

2.

waste gas system trouble 3.

emergency procedure for sampling MVT-1 4.

venting makeup 1 gas space to vent header 5.

check of waste gas decay 308 6.

fill 0TSG to 95%

7.

H recombiner operation 2

4/2/79 10:15 AM Approval granted to place recombiner in use w/a 20 min. delay to permit " ARMS" to get airborne.

4 12:00 noon Radiation meaaurements 4/1 4/2 Containment - Personnel Access 25 mR 100 mR Atmos. sample (contact)-

350 mR 850 mR Top of dome 4 mR 1:46 PM Recombiner in srv.

4:30 PM IE - RQ request continuous contact be made between IE RQ's and the control room.

4:40 PM R0-1 directs IE-Ops to log 10 highest core T/c readings.

7:05 PM Region III personnel arrive at airport:

- Warnick

- Brown

- McGregor

- Jorgenson 10:25 PM Verdery reports the increasing of the recombiners temp. by 100 F.

9 4/3/)9 12:25 AM Notified of release from auxiliary building.

CHRONOLOGY REVIEW 0F PROCEDURES (NRR) ON SITE TRLR #7 NRC Events Date Short Title Procedure #

3/31:

Leak Checking Recombiner Z-7 4/l:

Bleed Tank Transfer Unit 2 to 1 Z-4 Pressuriier degas.

Z-6 W.G. system trouble shooting Z-8 Venting mo tank gas space to next header Z-10 Leak checking space H recombiner Z-11 2

Switched from normal to emergency feedwater Z-16 Check of WDG-V30B Z-17 Loss of all RC pumps - natural circulation EP-3 Loss of all RE pumps and no natural circulation - go EP-4 to HPI 4/2:

CF system /so valve - prevent close interlock Z-1 Replace HPR 219 & HPR 228 filters Z-19 Reactor Bldg H sample Z-20 2

Note to Reader: Of 116+ procedures, only. the 13 above were available for review.

'L.-- - _ _., - -. - -, - - - - - -, - - - - - - - - - _ - -

.--,-,------__------.-,.---------.m-,,----..

---,,-.-..-a--

.-.-.---s.------

i..

I REF Kwic Index #LT-0005

?

I.

TYPED

SUMMARY

OF " TRANSIENT LOG" HERBEIN NRC Events i

3/28 - 1630 3 l

J. G. Herbein meets with Mr. Vollmer of the NRC.

3/29 - 0200 i

i 1

s i

I i

1 4

i.

t i

il e

t i

4 6

I

.I yve y+1*p*

w--+~eg--yw+me---re

-m

++vv, m,

wm4 ove a 4, asa m

,g p q v -- - +

evw-w p--*

  • e y

e v-rw e gsw-sw-,-r-+

  • ee-

- - *,e q

s-g--H-m w

'*me-++-m---

- we, y

OBSERVATION CENTER LOG Kwie Index # OCL 0003 1

1 No telephone log found as referred to in the typed Suninary of the Herbein Transient Log.

i 2" folder containing calculations only and not in a time sequence.

f l

f k

1 l

1 i

+

i l

i f

t t

i i

t l

l yvF vtw--w-y--

h-e&tq-yge6 a-y7.ew-9pp gy--

=g-w-c'e p v PMc'-w m

M'-t v'

y

'e't--

wee

-g vy g w-.-9 y -ma=<*A=q-y-w+gr"

    • WP'TA y

g F

w r

ex-Tf

7 TMI 1 EMERGENCY CONTROL CENTER LOG Kwie Index #0CL 0001 3/29/79 a+J 0900

" Checking to see where NRC wants charcoal air samp'e location desired."

0905

" Charcoal filter for NRC marked / Location."

0917 "NRC Reps trying to locate Mr. Abrahams."

0924

" Air sample & charcoal filter have been sent from Control Room - will come here to NRC."

0932 Chopper. Details not provided by this author.

0950

" Requested NRC to count IWTS fil'.er sample.

IWT ready to overflow.

Being counted by NRC. Call TMI - IRC with results."

1032 "NRC results No iodine on 0915 TMI-2 Control Room air sample (charcoal) only Xe-133 Xe-135 present."

1350 North End Samples. Details not provided by this author.

1655

" Clearance for NRC Reps.

Beckman to Security Johnson to U-2 CR Haverkamp to U-2 CR."

1719 "R. Vollmer to call R. Stello in Wash. D.C. ops Cntr (NRC)."

1742

" Clearance for F. Ash T.H. Shierling (NRC) to go to Security Bldg."

1923 NRC Samples. Details not provided by this author.

2020 "NRC did not give statement on what to tell pregnant wonen. DER getting States Statement reissued."

2035 "C. Rowe directed to take NRC Mr. Volmer & Mr. Addensam - permission granted."

2108 "N. Gate - Obs Cntr. The two people from NRC (w/Th C. Rowe) decided not to go on site."

2120 "U-2 CR asked questions:

Is NRC van still counting samples?

i l

IE-GEC:

Stated wait 5."

l

.. 3/30/79 0800 "NRC requests readings for tha day."

0810 "2 NRC inspectors request clearances."

0909 "Need 55 gal drum to N. Gate special sample for NRC."

0910 Need clearances for NRC Sherling, Cheramal, Berlinger, Mazetes, Adensom &

Ashe.

Cleared."

1041

" Phone Co won't come within 3 miles of TMI.

Phones on NRC trailer are 0.0.S."

1201 "They are evacuating Middletown commun*

Team E GE-3 9 mr 6 a 3 mr 8 a

  • ineligible; either commune or Commission p 127 of log 1434 "D. Haverkamp & NRC person to be cleared to enter."

1458 "5 blank TLD's & HP man for NRC escort at North Gate - requested by Wm Parker."

1545

" Jerry Holman, Bill Kreger, Bruce Boger, and Tom Murphy (NRC) to be cleared to meet D. Dubiel in HP Unit I."

1603 "D. F. Ross (NRC) to be released through North Gate."

1605 "Plumlee Kreger S

Murphy Terabin NRC on Island Boger Holman

(

Ross 1617

" Dick Wilson location? NRC group of engineers located out of D.C.

l yesterday."

Jackson-(grantedNRC) to U-2 C.R."

" Clearance 2324 l

2335

" Clearance for - Granted (NRC) Raymond - U-2 C.R."

2340 "ECS to OPS Our copter taken out by NRC. NRC did not want our copter in same air space."

2349 "0PS to ESC Have copter pilot on hand-NOT forced down - Requested to land by NRC personnel, thru Olmstead Tower. Bill Potts wants to be advised.

Results-unauthgrizedbytower. Copter will continue 'to monitor."

.. 3/31/79 0046

" North Gate to Ops - need clearances -

Smith 3[

Height Hyatt NRC inspectors to U-I C.R.

Tonz Yuhaf 0120 "NRC request air sample diverted to them prior to counting (I&E van) -

give to Don Sreniawsk Tom Essig" 0259 "Potts requests that Limroth gets to Fisher (NRC). Fisher and Potts want to know D. Limroth's progress with last night's concerns."

0400

" Set up meeting with NRC and team A to attempt to get air sample (center of plume - charcoal)."

0452 "NRC recommended air samples by Team A on Rt 441."

0515 "NRC has team A air sample taken in plume. Returning air sample to team D on site."

0635 "NRC has reac'ings of tracking plumes - (Mr. Grant) - updated topograp! y map.

(sheet of readings attached)."

0731

" White, Baunach, Brady - NRC need clearance."

0755

" Clearance (PP&L) Dietrick, Wiben, Yeager - HP clearance for (NRC)

Carpenter, Beckman - cleared."

0756

" Clearance for NRC Lauben, Mazetis, Berlinger, Adensam - cleared."

1356

" Miller, Aclsion, Fisher (NRC) cleared - VI - C.R."

1401 "NRC mobile sample of turb bldg - 0230 - no iodine noble gas only."

iil5 Zabadouski from NRC needs clearance - cleared."

1524

... - also cleared are (NRC) Johnson, Haverkamp."

1539 "Kendig, Neilly, Zarabian of NRC.need cleared for UI/U2 C.R. - clearedn" 1958 "Novak, Alshiski, Ghadant of NRC entrance denied - send to Obs."

2040

" Requested NRC to update access list."

r f*.

.. 2106 Received report from R. Zechman that a newscast was made stating that the RB had " explosive concentrations of H2 in RB and that evacuation was required from TMI to Hershey." Informed Barley & Crietz.

R. Warren stated H

= 1.9 which is less than of 4%.

2 4/1/79 1730

. State Trooper Hoover calls and reports rumor of possible sabotage attempt

.& reports abandoned trailer on turnpike.

4/2/79 (Reviewed up to p. 341,0404.)

k l

L l-f' l

I -

..