ML19340C097
| ML19340C097 | |
| Person / Time | |
|---|---|
| Issue date: | 10/02/1980 |
| From: | Seyfrit K NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Wahler J ABB COMBUSTION ENGINEERING NUCLEAR FUEL (FORMERLY |
| References | |
| REF-QA-99900401 NUDOCS 8011130393 | |
| Download: ML19340C097 (1) | |
Text
QLt&W %
UNITED STATES I
/f 8 8 c,*'o, o
NUCLEAR REGULATORY COMMISSION REGloN IV O 'i*-
~
611 RY AN PL AZ A DRIVE. SUITE 1000 o
E j
ARLINGTON, TEXAS 76012
,?
%,....~. f October 2, 1980 t
Docket No.
99900401 Combustion Engineering, Inc.
Attn:
Mr. J. E. Wahler Quality Assurance Manager 1000 Prospect Hill Road Windsor, Connecticut 06095 Gentlemen:
The enclosed IE Circular No. 80-22 is forwarded to you for information.
No written response is required.
Should you have any questions related to your understanding of the recommendations on this matter, please contact this office.
Sincerely,
/
Narl V. Seyfrit Director
Enclosures:
1.
IS Circular No. 80-22 2.
List of Recently Issued IE Circulars 80.711sn Q 3
SSINS:
6830 Accession No.:
8006190055 IEC 80-22 UNITED STATES NUCLEAR REGULATORY COMMISSION j W[{#
s 0FFICE OF INSPECTION AND ENFORCEMENT
~
WASHINGTON, D.C.
20555
/
IE Circular No. 80-22 Date: October 2, 1980 CONFIRMATION OF EMPLOYEE QUALIFICATIONS In recent months, the Nuclear Regulatory Commission has determined that in two unrelated actions a utility and an architect-engineering company employed technically unqualified individuals as designers / engineers by failing to confirm the validity of their technical and educational qualificaticas as presented in their employment applications.
In both of these inszances, the employers mistakenly assumed that the personnel firms supplying these individuals had investigated and confirmed previous career experiences.
In view of the fact that the unqualified persons in both of these cases were discovered as a result of allegations to this effect, rather than through internal company procedures, we believe that this matter warrants your attention.
We are hereby recommending that your employment procedures be reviewed to determine that your company has in effect employment policies which confirm the professional qualifications of employees.
In the event you conclude that your present procedures do not fully address this matter, we recommend thac you take prompt remedial action in this regard.
No written response to this Circular is required.
If you desire additional information regarding this subject, contact the Director vf the appropriate NRC Regional Office.
~
o
- - =
IE Circular No. 80-22 October 2, 1980 RECENTLY ISSUED IE CIRCULARS Circular Subject Date Issued To No.
Issued 80-13 Grid Strap Damage in 5/18/80 All holders of Reactor Westinghouse Fuel Operating Licenses (OLs)
Assemblies and Construction Permits (cps) 80-14 Radioactive Contamination 6/24/80 All holders of Power and of Plant Demineralized Research Reactor Licensees Water System and Resultant (Operating and Construction Internal Contamination of Permits), and Fuel Cycle Personnel licenseas 80-15 Loss of Reactor Coolant 6/20/80 All power reactor facilities' Pump Cooling and Natural with an Operating License (OL)
Circulation Cooldewn or Construction Permit (CP) 80-16 Operational Deficiencies 6/27/80 All powee ret tor facilitics in Rosemount Model 510DU with an Opcrating License (OL)
Trip Units and Model 1152 or a Construction Permit (CP)
Pressure Transmitters l
80-17 Fuel Pin Damage Due to 7/23/80 All holders of PWR Operating Water Jet from Baffle Licenses (OLs) and PWR I
Plate Corner Construction Permits (cps) 80-18 10 CFR 50.59 Safety 8/22/80 All power reactor facilities
]
Evaluations for Changes to with an Operating License (0L)
Radioactive Waste or a Construction Permit (CP)
Treatment Systems 80-19 Noncompliance with 8/26/80 All medical licensees License Requirements for Medical Licensees 80-20 Changes in Safe-Slab 8/21/80 All Part 50 and Part 70 Dimensions fuel facility liceasees 80-21 Regulation of refueling 9/10/80 All holders of a power reactor crews Operating License (0L) or a Construction Permit (CP)
Enclosure
.