ML19340C084

From kanterella
Jump to navigation Jump to search
Forwards IE Circular 80-22, Confirmation of Employee Qualifications. No Written Response Required
ML19340C084
Person / Time
Issue date: 10/02/1980
From: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Mcfarland J
SARGENT & LUNDY, INC.
References
REF-QA-99900507 NUDOCS 8011130370
Download: ML19340C084 (1)


Text

bb{b-f'f aE i l, b\\

  • t%

UNITED STATES

/

'o NUCLEAR REGULATORY COMMISSION

'g

[*i REGloN IV no 611 RY AN PLAZA DRIVE, SulTE 1000 er 5,

f ARLINGTON, TEX AS 76012

?

9, -

4 October 2, 1980

~

Docket No.

99900507 Sargent & Lundy Attn:

Mr. J. E. McFarland, Head Quality Assurance Division 55 East Monroe Street Chicago, Illinois 60603 Gentlemen:

The enclosed IE Circular No. 80-22 is forwarded to you for information.

No written response is required.

Should you have any questions related to your understanding of the recommendations on this matter, please contact this office.

Sincerely,

[g 4

r1 V.

eyfrit Director

/

Enclosures:

1.

IE Circular No. 80-22 2.

List of Recently Issued IE Circulars D01n30 '57D

s, 1

SSINS:

6830 Accession No.:

8006190055 IEC 80-22 UNITED STATES s

NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT C4 ALM WASHINGTON, D.C.

20555

/

IE Circular No. 80-22 Date:

October 2, 1980 i

CONFIRMATION OF EMPLOYEE QUALIFICATIONS In recent months, the Nuclear Regulatory Commission has determined that in two j

unrelated actions a utility and an architect-engineering company employed technically unqualified individuals as designers / engineers by failing to confirm the validity of their technical and educational qualifications as 1

i presented in their employment applications.

In both of these instances, the employers mistakenly assumed that the personnel firms supplying these 1

individuals had investigated and confirmed previous career experiences.

In view of the fact that the unqualified persons in both of these cases were discovered as a result of allegations to this effect, rather than through internal company procedures, we believe that this matter warrants your

)

attention.

I We are hereby recommending that your employment procedures be reviewed to determine that your company has in effect employment policies which confirm the professional qualifications of employees.

In the event you conclude that your present procedures do not fully address this matter, we recommend that you take prompt remedial action in this regard.

No written response to this Circular is required.

It you desire additional informat on regarding this subject, contact the Director of the appropriate i

NRC Regional Office.

1 I

i n,

-,,,c n,--

)

i IE Circular No. 80-22 October 2, 1980 RECENTLY ISSUED IE CIRCULARS Circular Subject Date Issued To No.

Issued 80-13 Grid Strap Damage in 5/18/80 All holders of Reactor Westinghouse Fuel Operating Licens.c. (OLs)

Assemblies and Construction Permits (cps) 80-14 Radioactive Contamination 6/24/80 All holders of Power and of Plant Demineralized Research Reactor Licensees Water System and Resultant (Operating and Construction Internal Contamination of Permits), and Fuel Cycle Personnel licensees 80-15 Loss of Reactor Coolant 6/20/80 All power reactor facilities Pump Cooling and Natural with an Operating License (OL)

Circulation Cooldown or Construction Permit (CP) 80-16 j'

Operational Deficiencies 6/27/80 All power reactor facilities in Rosemount Model 510DU with an Operating License (OL)

Trip Units and Model 1152 or a Construction Permit (CP)

Pressure Transmitters 80-17 Fuel Pin Damage Due to 7/23/80 All holders of PWR Operating Water Jet from Baffle Licenses (OLs) and PWR Plate Corner Construction Permits (cps) 80-18 10 CFR 50.59 Safety 8/22/80 All power reactor facilities Evaluations for Changes to with an Operating License (OL)

Radioactive Waste or a Construction Permit (CP)

Treatment Systems 80-19 Noncompliance with 8/26/80 All medical licensees License Requirements for Medical Licensees 80-20 Changes in Safe-Slab 8/21/80 All Part 50 and Part 70 Dimensions fuel facility licensees 83-21 Regulation of refueling 9/10/80 All holders of a power reactor i

crews Operating License (0L) or a Construction Permit (CP)

Enclosure J

..