ML19340C064

From kanterella
Jump to navigation Jump to search
Forwards IE Circular 80-22, Confirmation of Employee Qualifications. No Written Response Required
ML19340C064
Person / Time
Issue date: 10/02/1980
From: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Hill R
C.F. BRAUN & CO.
References
REF-QA-99900520 NUDOCS 8011130333
Download: ML19340C064 (1)


Text

.

3bP'- RGE UNITED STATES

  1. p* "f oug'o NUCLEAR REGULATORY COMMISS!ON REGloN IV O"

V!

o 611 RY AN PLAZ A oRIVE, SulTE 1000 e5 ['

    • j ARLINGTON, TEX AS 76012 o,,

s o

October 2, 1980 Docket No.

99900520 C. F. Braun and Company Atta:

Mr. R. B. Hill Vice President Alhambra, California 91802 Gentlemen:

1 The enclosed IE Circular No. 80-22 is forwarded to you for information.

i No written response is required.

Should you have any questions related to your understanding of the recot::mendations on this matter, please contact this office.

Sincerely, dj c

Karl V. Seyfrit Director f'

Enclosures:

1.

IE Circular No. 80-22 2.

List of Recently Issued IE Circulars 4

l 4

/

8011180 333

l SSINS:

6830 Accession No.:

8006190055 IEC 80-22 UNITED STATES l

NUCLEAR REGULATORY COMMISSION l

'4 3

t OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D.C.

20555 IE Circular No. 80-22 Date: October 2, 1980 l

CONFIRMATION OF EMPLOYEE QUALIFICATIONS In recent months, the Nuclear Regulatory Commission has determined that in two unrelated actions a utility and an architect-engineering company employed technically unqualified individuals as designers / engineers by failing to confirm the validity of their technical and educational qualifications as presented in their employment applications.

In botn of these instances, the employers mistakenly assumed that tha personnel firms supplying these individuals had investigated and confirmed previous career experiences.

In view of the fact that the unqualified persons in both of these cases were discovered as a result of allegations to this effect, rather than through internal company procedures, we believe that this matter warrants your attention.

We are hereby recommending that your employment procedures be reviewed to j

determine that your company has in effect employment policies which confirm j

the professional qualifications of employees.

In the event you conclude that your present procedures do not fully address this matter, we recommend that l

d you take prompt remedial action in this regard.

No written response to this Circular is required.

If you desire additional information regarding this subject, contact the Director of the appropriate 2

NRC Regional Office, l

1 i

i i

4

..m--

IE Circular No. 80-22 October 2, 1980 RECENTLY ISSUED IE CIRCULARS Circular Subject Date Issued To

)

No.

Issued 4

t 80-13 Grid Strap Damage in 5/18/80 All holders of Reactor l

Westinghouse Fuel Operating Licenses (OLs)

Assemblies and Construction Permits (cps) i 80-14 Radioactive Contamination 6/24/80 All holders of Power and of Plant Demineralized Research Reactor Licensees Water System and Resultant (Operating and Construction i

Internal Contamination of Permits), and Fuel Cycle Personnel licensees 80-15 Loss of Reactor Coolant 6/20/80 All power reactor facilities' l

Pump Cooling and Natural with an Operating License (OL)

Circulation Cooldown or Construction Permit (CP) 80-16 Operational Deficiencies 6/27/80 All power reactor facilities in Rosemount Model 510DU with an Operating License (OL)

Trip Units and Model 1152 or a Construction Permit (CP)

Pressure Transmitters 80-17 Fuel Pin Damage Due to 7/23/80 All holders of PWR Operating Water Jet from Baffle Licenses (OLs) and PUR Plate Corner Construction Permits (cps) 80-18 10 CFR 50.59 Safety 8/22/80 All power reactor facilities EvaLiations for Changes to with an Operating License (OL)

Radicactive Waste or a Construction Permit (CP)

Treatment Systems 80-19 Noncompliance with 8/26/80 All medical licensees License Requirements for Medical Licensees l

80-20 Changes in Safe-Slab 8/21/80 All Part 50 and Part 70 Dimensions fuel facility licensees 80-21 Regulation of refueling 9/10/80 All holders of a power reactor i

crews Operating License (0L) or a Constructioa Permit (CP)

Enclosure i

d

.. ~