__.I OPERATING DATA REPORT DOCKET NO.

50-344 DATE 11-3-80 COMPLETED BY C-C-

R,4r l

TELEPHONE 503-556-1713 Ext. 234 OPERATING STATUS Notes

1. Unit Name:

Troian Nuclear P1 w.

October 1980

2. Reporting Period:

3411

3. Licensed Thermal Power'(MWt):

1216

4. Narnepiste Rating (Gross MWe):

1130

5. Design Electrical Rating (Net MWe):

1122

6. Maximum Dependsbie Capacity (Gross MWe):

1080

7. Maximum Dependable Capacity (Net MWe).
8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
9. Power Level To Which Restricted. If Any (Net MWe):
10. Ressons For Restrictions.If Any:

' 11ds Month Yr.-to.Date Cumulative l

745 (time change) 7320.

36528

11. Hours in Reporting Period 741.9 4999.3 21297.3
12. Number Of Hours Resctor Was Critical 0

0 9171 g

13. Reactor Reserte Shutdown Hours 738.5 4901.7 20529.5
14. Hours Generstor On.Line 0

0 1508.7

15. Unit Reserve Shutdown Hours 25Y2341 1404on70 Aaprf499
16. Gross Thermal Energy Genersted (MWH) 822286 4841111 oog96gog
17. Gross Electrical Energy Generated (MWH) 785365 4597401 19630720
18. Net Electrical Energy Genersted (MWH) 99.1 67.0 56.9
19. Unit Service Factor 99.1 67.0 60.3
20. Unit Avsilsbility Factor 97.6 58.2 49.g
21. Unit Capacity Factor (Using MDC Net) 93.3 55.6 47.6
22. Unit Capacity Factor (Using DER Net) 0.9 12.1 27.o
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type. Date.snd Duration of Esch):

Refueline. Anril loRT. 49 A n..a NA

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achieved l

(

MA NA INITIAL CRITICALITY NA Mr INITIAL ELECTRICITY NA NA COMMERCIAL OPERATION (9/17) l

(

801112o %.

"-T-

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

90 MA UNIT Troian DATE 11-1-RO COMPLETED 11Y G. C. Bair TELEPii0NE 503-556-3713

. Ext. 234 MONTil October r9M DAY AVER AGE DAILY POWER LEVEL DAY AVER AGE DAILY POWER LEVEL (MWe Net)

(MWc Nc )

i InA7 17 in7n 2

1064 18 1068 3

604 l9 1065 4

1044 20 1065 5

ingq gg ings 6

1063 22 1069 7

'nA5' 23 1068 i

3 1066 24 106R 9

1070 25 1067 10 in9A 26 1111 ll 1070 27

-1068 12 1067 28 1067 3

1071 29 1068 14 1069 30 1070 15 1068 31 1067 16 1068 INSTRUCTIONS On this format.hst the average daily unit power levelin MWe Nc for each day in the repmemg month. Compute to the t.carest whole megawatt.

(9/77) i w

~

o UNITSHUTDOWNS AND POWER REDUCTIONS DOCKEY NO.

50-344 UNIT NAME Troian DATE 11-ban REPORT MONTil October 1980 COMPLETrp ggy c c n,,,

TELEPilONE 503-556-3713 Ext. 234 "t.

,$E Y

Licensee

[g Cause & Corrective h3 No.

Date k

Eg

,sE Event u?

Action to jE 2

j 65 g Report

Prevent Recurrence 6

ss of main generator field occurred 80-09 801003 F

6.5 C

3 NA NA NA when personnel inadvertently removed input lead while setting up plant. for power systems stablizer test..Generato -.

trip resulted in trubine and reactor trip; 80-23/03,L Cil Z

Main feedwater regulating valve B failed to close automatically. follow-Ing plant trip because a manual vent throttle valve did not allow enough air venting.. Manual valve was reset '

and is being studied for foreign mater-tal blockage or malpositioning.

80-20/01,T IF Z

The auxiliary feedwater pumps failed to start automatically from ia-lo steam generator level following plant trip.

Investigation showed that the leads M

to a slave relay had been connected to g

the wrong terminals. The miswiring had

,o..

g r.. _ i <., m

.y.....

3

,,-rm.i

, v. - #,-

when the steam generators were drained.

M

~

3 3

F: Forced Reason:

Method:

Permanent corrective action to possi-S: Scheduled A Equipment Failure (Explain) l-Manual bility. of personnel error causing conunon-R B. Maintenance oi Test 2-Manual Scram.

mode failed of redundant protection is g

C Refueling 3 Automatic Sc.am. being evaluated.

6 D-Regulainey Restri-tion 4-Other (Explain) g E-O.eratur Traini.g & License Enamination i

F-Administrative 5

G-Operational Ersur (Explain)

Exhibit I Same Source (9/77)

II.Other (Explain)

W

__m DOCKET NO:

50-344 DATE:

11-3-80 COMPLETED BY:

G. G. Bair

^

TELEPHONE:

503-556-3713 Ext. 234 4

i i

SUMHARY OF OPERATING EXPERIENCE OPERATION:

The plant began and ended the mon'th at full power operating condition; one shutdown occurred during the month.

The steam generator primary-to-secondary tube leakage increased slightly i

to 25 gallons per day.

1 I

MAJOR SAFETY RELATED MAINTENANCE:

I Work continued.on improvement modifications to the Plant Security and Fire Protection Systens.

Work continued <nt modifications to the Control / Auxiliary Building walls i

to improve seismic integrity.

s Work continued on TMI-related modification work.

}

Work' completed on the 2 and 5 yr. maintenance' and inspection of the diesel fire pump and driver.

LICENSE CHANCES:

I Amendment 49; Security Plan modifications-Amendment 51; Secondary Chemistry program reference removed from the 1

technical specifications Amendment 50; Fire Protection changes in technical specification l

Amendment 52; Portland General Electric management reorganization

?

MISCELLANEOUS:

Mt. St.-Helens became somewhat active on 10-15-80, with steam / ash eruptions and local seismic activity. No effects at the Trojan site were noted.

The Power System Stabilizer-test, which involved perturbation of generator voltages and automatic regulator adjustment, was completed successfully, i