Updates 801002 Request for Restart of Limited Complex safety-related Concrete Activities.Current Projected Placement Dates for Previously Identified Placements Encl
ML19340B817
Person / Time
Site: South Texas  
Issue date: 11/03/1980
From: Oprea G
HOUSTON LIGHTING & POWER CO.
To: Seyfrit K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
ST-HL-AE-572, NUDOCS 8011120348
Download: ML19340B817 (5)


Text

l S'he Light mmPany Houston Lighting & Pcwer PO. Box 1700 Houston. Texas 77001 (713)228 9211 November 3, 1980 ST-HL-AE-572 SFN: V-0110 c

=H Mr. Karl Seyfrit C

Director, Region IV Nuclear Regulatory Commission

~.3 611 Ryan Pla::a Drive, Suite 1000 y

~

g Arlington, Texas 76012 p

m un O

)

Dear Mr. Seyfrit:

South Texas Project Units 162 Docket Nos. S1N 50-498, STN 50-499 Limited Restart of Safety-Related Complex Concrete This letter is to update our request of October 2,1980, (ST-HL-AE-555),

relative to the restart of limited complex safety-related concrete activities on the South Texas Project. Attachment 1 sets forth current projected place-ment dates for those placements previously identified to you in the scope of the limited restart program.

We have completed action on the additional items recently established through the Resident Reactor Inspector and your staff regarding concrete correlation testing in lieu of taking samples at thrs pump line discharge, performance of user tests on cement, closeout of nonconft,rmance reports on the qualifications of Pittsburgh Testing Laboratory inspection personnel, and revision of the concrete specification and concrete procedure to incorporate the criteria agreed upon between the Division of Nuclesr Reactor Regulation and our project concerning concrete correlation testing.

Due to the completion of these items and otaers previously identified which relate to the restart of complex concrete, wa request by this letter that the Immediate Action Letter be modified allowing us to restart limited safety-related complex concrete activities in accordance with Attachment 1 to this letter and the previous concrete restart program submitted to you.

Very truly yours, A

J.

fw s

G. W. Oprea, Jr.

8), \\

Executive Vice President GWO/cmd Attachment

(

80niao 30 g 1

F-Houston Lighting & Power Company November 3,1980 ST-HL-AE-572 SFN: V-0110 Page 2 cc:

J. H. Gc'dtan D. G. Bar.'

l Howard Pyle R. L. Waldrop H. R. Dean i

D. R. Beeth J. D. Parsons G. B. Painter L. K. English A. J. Granger R. A. Frazar H. S. Phillips (NRC)

J. O. Read (Read-Poland,Inc.)

M. D. Schwarz (Baker &Botts)

R. Gordon Gocch (Baker & Botts)

J. R. Newman (Lowenstein, Newman, Reis, Axelrad & Toll)

Director, Office of Inspection & Enforcement Nuclear Regulatory Comission Washington, D. C. 20555

Houston 1ighting & hwer Company November 3,1980 ST-HL-AE-572 SFN: V-0110 Page 3 M. L. Borchelt Executive Vice President Central Power 6 Light Company P. O. Box 2121 Corpus Christi, Texas 78403 R. L. Range Central Power 6 Light Company P. O. Box 2121 Corpus Christi, Texas 78403 R. L. Hancock Director of Electrical Utilities City of Austin P. O. Box 1088 Austin, Texas 78767 T. H. Muehlenbeck City of Austin P. O. Box 1088 Austin, Texas 78767 J. B. Poston Assistant General Manager of Operations City Public Service Board P. O. Box 1771 San Antonio, Texas 78296 A. vonRosenberg City Public Servic- " card P. O. Box 1771 San Antonio, Texas 78296 9

F Houston Lighting & Power Company November 3, 1980 ST-HL-AE-572 SFN: V-0110 Charles Bechoefer, Esquire page 4 Chairman, Atomic Safety 6 Licensing Board II. S. Nuclear Regulatory Comission Washington, D. C. 20555 Dr. James C. Lamb, III 313 Woodhaven Road Chapel Hill, North Carolina 27514 Dr. Emmeth A. Luebke Atomic Safety 6 Licensing Comission U. S. Nuclear Regulatory Comission Washington, D. C.

20555 Steven A. Sinkin, Esquire 116 Villita Street San Antonio, Texas 78205 Citizens for Equitable Utilities c/o Ms. Peggy Buchorn Route 1, Box 432 Brazoria, Texas 77422 Richard W. Lowerre, Esquire Assistant Attorney General for the State of Texas P. O. Box 12548 Capitol Station Austin, Texas 78711 Bernard M. Bordenick Hearing Attorney Office of the Executive Legal Director U. S. Nuclear Regulatory Commission Washington, D. C. 20555 s

e ATTAUllMEk.J l SAFETY RELATED COMPLEX CONCRETE PLACEMENTS Pour Location Concrete Scheduled Number Quantity Pour Date 4

CI2-W24 Unit 2 containment Internal - North Valve 230 Cu. Yds.

11/06/80 Room Walls and Secondary Shield Walls 4

ji (EL. - 2' 0" to

+ 9' 3")

ji CI2-W22 Unit.2 Containment Internal - South 11 eat 170 Cu. Yds.

11/17/80 i'

Exchange Walls and Secondary Shield Walls (EL. - 2' 0" to + 9' 3")

CIl-S60A Unit 1 Containment Internal - North valve 76 Cu. Yds.

11/25/80 Room Walls and Slab (EL. 61' 3" to 68" 0")

CS2-W8 Unit 2 Containment Shell 580 Cu. Yds.

12/16/80 (EL. 53' 0" to 63' 0")

C12-W24B Unit 2 Containment Internal - North Valve 131 Cu. Yds.

12/09/80 Room Walls and Secondary Shield Walls (EL. 9' 3" to 16')

CI2-W22B Unit 2 Containment Internal - South fleat 115 Cu, Yds.

12/15/80 Exchange Walls and Secondary Shield Walls (EL. 9' 3" to 16')

{}

CSI-W18 Unit 1 Containment Dome 4 31 Cu. Yds.

12/19/80 j

(EL. 150' 0" to 155' 0")

.