ML19340B458
| ML19340B458 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 10/15/1980 |
| From: | Clayton F ALABAMA POWER CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| IEB-79-02, IEB-79-2, NUDOCS 8011110025 | |
| Download: ML19340B458 (1) | |
Text
Alabima Pow;r Comp:ny
[b 600 North 18th street i
Post Othc3 Sox 2641 Birminghtm, Alabama 35291 f,
~
Telephone 205 250-1000 F. L. cLAYTo N, JR.
m Senior Vice President f
g.
. 7 Alabama power
~
the southern electre system October 15, 1980 Docket No 00-364 Mr. J. P. O'Reilly U. S. Nuclear Regulatory Commission Region II, Suite 3100 101 Marietta Street N.W.
Atlanta, Georgia 30303
Dear Mr. O'Reilly:
SUPPLEMENTAL RESPONSE TO I.E. BULLETIN 79-02, REVISION 2 FARLEY NUCLEAR PLANT - UNIT 2 The design and repair of all shell type concrete expansion anchcrs in the IEB 79-02 program for Farley Nuclear Plant Unit 2 utilizes a safety factor of five in accordance with the bulletin requirements.
Yours very truly,
. Clayton Jr.
CLB:de cc: Mr. R. A. Thomas Mr. G. F. Trowbridge Mr. L. L. Kintner Mr. W. H. Bradford Office of I & E Division of Construction Inspection 1
Washington, D. C.
Mr. D. Price I & E, Regior
~ 8011110 62 5 OFFicrAL COLY
- __