ML19340B439
| ML19340B439 | |
| Person / Time | |
|---|---|
| Site: | Hatch |
| Issue date: | 10/31/1980 |
| From: | Widner W GEORGIA POWER CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| References | |
| IEB-79-01B, IEB-79-1B, NUDOCS 8011100472 | |
| Download: ML19340B439 (1) | |
Text
i
%C:.2 bT' s,
T/CL m.m a.~: a tr.
, G L3?1
(
p g '. 2 l Georgia Power W A. Widner iI
, p
% w :-
October 31, 1980 o
y,,,,,,,,,,,,, y,,c,n U. S. huclear Regulatory Commission
~
Office of Inspection and Enforcement REFERENCE-j Region II - Suite 3100 JIL:-JP0 a
101 Marietta Street, NW (50-366 ;
4 Atlanta, Georgia 30303 I&E Bulletin 79-01B j'j k.
m c-ATTENTION: Mr. James P. O'Reilly Ryf 22
.m GENTLEMEN:
J w
.m In accordance with the requirements of I&E Bulletin 79-018, " Environ-5 mental Qualification of Electrical Equipment", dated January 17, 1980, Georgia Power Company subraits the attached response for Items 1 through 6 for the Edwin I. Hatch Nuclear Plant - Unit 2.
This submittal represents an extensive review of the environmental qualification of electrical equipment within the scope of the bulletin, both inside and outside the containment. Our response demonstrated that k
the equipment is capable of satisfying safety requirements. The attached response compares Unit 2 electrical equipment to the D0R guidelines con-tained in enclosure 4 to I&E Bulletin 79-01B.
Items identified for which full equipment qualification cannot be demonstrated have been noted as
" outstanding items"'on the component worksheets in accordance with Item 4 of the bulletin and a justification for continued operation and corrective action planned is presented in the report.
If you have any questions, please contact this office.
Very truly yours, O
-k i
W. A. Widner DLT/mb
)
Enclosure
~
Sworn to and subscribed efore me this 3Lt Gy uT Ot.i.uber,1980.
'/
Notary Public. Georgia. State at Large
/L M_,
My Commesseon Empres Sept. 20,1983 i
Notary Public xc:
M. Manry R. F. Rogers, III B0111 N N UF1h3 A L pgpy a