Submits Info Re Descriptions of Further Actions Planned Concerning First Aid Facilities & Emergency Plan Implementing Procedures
ML19340B330
Person / Time
Site: Dresden  
Issue date: 04/22/1976
From: Bolger R
COMMONWEALTH EDISON CO.
To: Allan J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19340B329 List:
References
760402, NUDOCS 8010210880
Download: ML19340B330 (3)


Text

' '

Commonwrith Edis:n one Fi,st Nabonal PlIza. C.Ncaco. Ilknois Address Reply to: Post Ofuce Box 767 Chicago. tihnois 60690 April 2, 1976 Mr. J. M. Allen, Chief Fuel Facility and Materials Safety Branch - Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137

Subject:

Dresden Station Units 1, 2, and 3 Response to IE Inspection Report Nos. 50-10/76-03, 50-237/76-02, and 50-249/76-02, NRC Docket Nos.

50-10, 50-237, and 50-249

Dear Mr. Allen:

The following are descriptions of further actions planned relative to paragraphs D and G of the Management Interview in the

-~

Summary of Findings section of the subject report.

Pcragraph D:

First Aid Facilities The first aid facilities will be moved from the trailer into the permanent structure January 1, 1977.

Paragraph G:

Emergency Plan Implementing Procedures Procedures which describe the duties of each Director of an Emergency Plan function have been prepared and issued.

Each individual assigned the duties of a Director or alternate is responsible for maintaining a copy of the Emergency Plan Implementing Procedure (EPIP) which describes their duties.

As requir'ed by GSEP Section 10, each individual with GSEP duties will be provided with supplementary procedures.

Of the eight subjects, identified in Section 10 to be included in supplementary emergency procedures, following is the status:

10.1 Action Levels and Dose Estimates a and b New procedure must be written.

c Included in the General Office Environmental Director Procedure and will be included in the supplementary emergency procedures by reference.

W 5 1976 8010210 O

g gMha g gWe w --

G

  • M

Commonwealth Edison Mr. J. M. Allen April 2, 1976 d

Will be included in the Dresden Station Offsite Environs

~

Director Emergency Plan Implementing Procedure (EPIP) and will be included in the supplementary emergency procedures by reference.

10.2 GSEP Phone List Ccumpleted.

10.3 GSEP Support Phone List Cosapleted.

10.4 Medical Procedures These procedures currently are contained in the Abnormal Operating Procedures, Administrative Procedures, or Radiation Protection Procedures and will be included in the supplementary,

.2.

emergency procedures by reference.

10.5 Fire Fighting Procedures These procedures are currently contained in Station proce-dures and will be included in the supplementary emergency procedures by reference.

10.6 List of Emergency Equipment This list is currently contained in Station procedures and will be included in the supplementary emergency procedures by reference.

10.7 Environs Procedure and List of Surveillance Stations The Station Offsite Environmental Director's procedure will l

be revised to include this information and it will be included l

in the supplementary emergency procedures by reference.

10.8 Recovery and Reentry Procedures Recovery of injured personnel is covered in existing Station procedures and will be included in the supplementary emergency

)

procedures by reference.

These procedure revisions and additions will be completed by October 1, 1976.

1

- 1

s..

i o

Commonwealth Edison 1

Mr. J. M. Allen April 2, 1976 1

Please contact this office for any' additional questions.

~

Very truly yours,

[

R. L. Bolger Assistant Vice President 1