ML19340B321
| ML19340B321 | |
| Person / Time | |
|---|---|
| Site: | Dresden |
| Issue date: | 04/05/1977 |
| From: | Oconnor P Office of Nuclear Reactor Regulation |
| To: | Desiree Davis Office of Nuclear Reactor Regulation |
| References | |
| NUDOCS 8010210862 | |
| Download: ML19340B321 (3) | |
Text
.
..... -. i ~1 -;,
~~'2
did. =
M UNITED STATES p
yV
' *g NUCLEAR REGULATORY COMMISSION
.g.]
g I M o
WASHINGTON. D. C. 20555
- f th/.,
April 5,1977
=
~
= = = -
- s,,*
Docket No. 50-10 i=s =2T ius":
MEMORANDUM FOR:
Don K. Davis, Acting Chief, Operating Reactors Branch #2, D0R
==
FROM:
Paul O'Connor, Project Manager, Operating Reactors Branch #2, DCR
SUBJECT:
FORTHCOMING MEETING WITH COMM0MWEALTH EDIS0N TO DISCUSS THE PROPOSED CHEMICAL CLEANING OF DRESDEN UNIT NO. 1 g
b=
Date & Time:
9:00 a.m. to 1:00 p.m.
April 29, 1977 g
Location:
Phillips Bldg.
Rm. P-110 To review the results of the materials
Purpose:
.=
compatability testing program carried out by Commonwealth Edison, Dow Chemical, and General Electric in support of the 77 proposed chemical decontamination of
~
the Dresden Unit No. 1 primary Cooling '
System.
~ q
Participants:
HRC
- Paul O'Connor, liarshall Grotenhuis, Richard Silver, Lake Barrett, War en Hazleton,
^
Frank Almeter, Herbert Conrad, Jay Lee, Tom Murphy
=;
Commonwealth Edison Mike Turbak, G. Wagner, Stan Graves,
=
Also representatives from Dow Chemical and General Electric.
j' 5
Opf h.
WQ
.
=:.:
~
Paul O'Connor, Project Manager Operating Reactors Branch #2 Division of Operating Reactors
Enclosure:
wt-f 8010210 @6 2
[
=
. :L": :::::'
. _;R p
=[h:.'
Q7
(_ _
g;-
'~
..::6.1.
.2 T.
e AGENDA iWM APRIL 29, 1977
... f..
- -=:
MEETIfiG WITH C0 tit 10)NEALTH EDISON I:35
=N:$$
TO DISCUSS DRESDEN l' NIT 110.1 DECONTAMINATION i
- -u 1.
IfliRODUCTION - George Wagner, CEC 0
=";
2.
Material Testing Program Results a.
Comonwealth Edison Testing.
b.
Dos Chemical Co. Test Results
==
==
c.
General Electric Test Results
'97 3.
Test Loop Decontamination at Dresden 1 4.
Pre-Service Inspection Program S.
In-Service Inspection Program
( -
- p...
O e
0 i:Ph
'l'.
=
.i Y
- e
3
- a
,==r=
7._.
.. M. :.
N5 tjf.
5:~=h =
- sia;::
=..
MEETING NOTICE DISTRIBUTION
.j
- l -
I: : i:
NRC PDR iEI:' -
Local PDR W:=if M.:
ORB #2 Reading.
~
NRR Reading B. C. Rusche
&g E. G. Case
..x.;x V. Ste'lo D. Eisenhut
- +:
K. R. Goller
+
A. Schwencer
==
G. Lear R. Reid
- w g.
T; J. Carter
=.. :
~~
W. Butler B. Grimes -
- g. ~,
R. Baer L. Shao
+
Project Manager - P 0 Connor Attorney, OELD -
Ol&E(3)
OSD (3) 1
- B. ' Faulkenberry, I&E
~ ~ ~ ~
R. Diggs Receptionist, Bethesda
=~"
i OPA, F. Ingram-Principal Staff Participants R. Fraley, ACRS (16)
~
Dudley Thompson, 359 E/W M. Grotenhuis W:
R. Silcer L. Barrett l
N. llazleton 2
F. Almeter H. Conrad I
J. Lee-T. Murphy j
=
es i?5 '
...-....q 1
':2.'.,
b b55 l
(:
=r u
nj
=::
.