ML19340B268

From kanterella
Jump to navigation Jump to search
Forwards LER 80-067/01T-0
Date released: 12/20/2019 Download: ML19340B268


LER 80-067/01T-0:on 801002,analytical Reanalysis of B RHR Sys Indicated That as-built Configurations of Sys Would Not Remain Functional During Sse.Caused by Design Error.Seismic Anchor Modified to Meet Criteria
ML19340B275
Person / Time
Site: Pilgrim
Issue date: 10/10/1980
From: Graham E
BOSTON EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19340B275 (1)
Forwards LER 80-067/01T-0
ML19340B267
Person / Time
Site: Pilgrim
Issue date: 10/10/1980
From: Machon R
BOSTON EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19340B267 (1)