ML19340B159

From kanterella
Jump to navigation Jump to search
Advises That Annual Refueling Outage Is Rescheduled to 801114.Steam Generator Tube Sleeves Will Be Installed During Outage to Evaluate Sleeving as Repair Procedure for Steam Generator Tube Degradation
ML19340B159
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 10/14/1980
From: Burstein S
WISCONSIN ELECTRIC POWER CO.
To: Clark R, Harold Denton
Office of Nuclear Reactor Regulation
References
NUDOCS 8010210546
Download: ML19340B159 (1)


Text

_ _ _ __

O Wisconsin Electnc ma courasr 231 W. MICHIGAN. P.O. BOX 2046. MILWAUKEE, WI 53201 October 14, 1980 Mr. Harold R.

Denton, Director Office of Nuclear Reactor Regulation U.

S. NUCLEAR REGULATORY COMMISSION Washington, D. C.

20555 Attention:

Mr.

R.

L.

Clark, Chief Operating Reactors Branch 3 Gentlemen:

DOCKET NO. 50-266 FALL 1980 REFUELING SCHEDULE POINT BEACH NUCLEAR PLANT UNIT 1 By letter dated August 22, 1980, we advised you of our plan to take Point Beach Nuclear Plant Unit 1 out of service on November 7, 1980, for the Unit's annual refueling.

We have now rescheduled this outage to commence on or about November 14, 1980.

The steam generator tube inspection and testing plans for this outage remain as disc'tssed in our August 22, 1980 letter.

In addition, we plan to nstall several steam generator tube sleeves during this outage to evaluate sleeving as a possible repair procedure for the steal generacor tube degradation at Point Beach Unit 1.

We will provide a description of our sleeving demonstration program for your information within thirty days.

Very truly yours,

""Ih /

=r

($E [

Sol Burstein Executive Vice President Copy t3: NRC Resident Inspector Point Beach Nuclear Plant j

Mr. C.

F.

Riederer I

Public Service Commission of Wisconsin Mr. Peter Anderson Wisconsin's Environmental Decade

(

Ms. Joan Estes Lakeshore Citizens for Safe Energy 4,

0 8810210 gylg6