Requests Permission to Utilize Alternate Startup Channel Under License R-115
ML19340B157
Person / Time
Site: University of Illinois
Issue date: 10/17/1980
From: Beck G
ILLINOIS, UNIV. OF, URBANA, IL
To: John Miller
Office of Nuclear Reactor Regulation
References
NUDOCS 8010210537
Download: ML19340B157 (1)


Text

-]

7..

y

_.----..,a

^

~

.~

c.

n. 7 l

Nuclear Engineering Program.

' 214 Nuclear Engineering Laboratory Urbano. Illinois 61801 10-17-80 (217) 333-2295 Jim Miller Standardization;and Special Projects Branch U.' S. Nuclear Regulatory _ Commission Mail Stop Phillips 228 Washington, D. C.

20555

Dear Mr. Miller:

l University of Illinois Advanced TRIGA Reactor Facility License R-115 Docket No. 50-151

SUBJECT:

Request for permission to utilize an alternate start-up channel.

After further checks, we have found that the BF system is 3

compatible with the interlock circuit.

As a result, we will use normal operating procedures rather than those described in the first I

letter. The only change will be lowering the BF tube to the designated 3

position for a start-up and the later removal of the BF tube when 3

a power level of about 15 watts is reached.

We have not checked out this with the reactor in actual operation and-hence would prefer permission for either alternative.

Signe 2

G erald P. Beck, Reactor Supervisor 0

$g O 1

O 8810210 5"7 7

.T

-_- - - - - - - - - - _ - - - - = - -

-