ML19340B119

From kanterella
Jump to navigation Jump to search
Submits Info on NRC Task Action Plan Item II K.3.27 Re Common Ref for Reactor Vessel Level Instrumentation.Program Can Be Completed by 810115.Proposed Changes to Tech Specs Will Be Submitted by 801114
ML19340B119
Person / Time
Site: Vermont Yankee File:NorthStar Vermont Yankee icon.png
Issue date: 10/10/1980
From: Rich Smith
VERMONT YANKEE NUCLEAR POWER CORP.
To:
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0660, RTR-NUREG-660, TASK-2.K.3.27, TASK-TM WVY-80-145, NUDOCS 8010210318
Download: ML19340B119 (1)


Text

.

VERMONT YAN KEE NUCLEAR POWER CORPORATION

. SEVENTY SEVEN GROVE STREET B.3.2.1 RurtAxo, Vensosr osvoi REPLY TO:

October 10, 1980 ENGINEERING OFFICE TURNPlKE RO AD WESTBORO. M ASS ACHUSETTS 01581 7ELEPHONE 617-36 6-9 0 t t United States Nuclear Regulatory Commission Washington, DC 20555 Attention: Office of Nuclear Reactor Regulation

References:

(a) License No. DPR-28 (Docket No. 50-271)

(b) USNRC Letter to All Operating Reactor Licensees dated May 7, 1980

Subject:

Submittal of Information on N9C Task Action Plan Item II K.3 27; Common Reference Water Level

Dear Sir:

Reference (b) required all BWR licensees to provide a common refere.9ce for reactor vessel level instrumentation. We have evaluated this requirement and have concluded that such a change has some benefit. The changes required to implement this option include replacing the scales on the RPS/ECCS and Feed Control indicators and recorders so that the level referred to by each indication device is the top of the enriched fuel.

In addition to replacing the scales on the individual indicators,. extensive procedure revision, operator retraining and preparation and approval of a Technical Specification change is required. Although the hardware changes could be accomplished in a reasonably short time frame, it' is our position that the longer, more comprehensive program, including procedure revision, independent review and approval, hardware changes and ' operator retraining is required if the common reference level changes are to repretent an enchancement in plant safety. It is anticipated that this program can be completed by January 15, 1981. A proposed change to the technical specifications will be submitted by separate letter by November 14, 1980.

'We trust that the actions described above' meet the intent of the NRC's Task Action Plan Item II K.3 27; however, should you desire any additional information, please contact us.

Very truly yours, VERMONT YANKEE NUCLEAR POWER CORPORATION h

t" R. L. Smit Licensing Engineer RLS/ dis g