ML19340B113

From kanterella
Jump to navigation Jump to search
Responds to Items B1 & B2 in IE Bulletin 80-17,Suppl 1, Failure of 76 of 185 Control Rods to Fully Insert During Scram at Bwr. Plans to Install Ultrasonic Water Level Monitoring Sys Are Underway
Date released: 12/20/2019 Download: ML19340B113


Responds to Item a in IE Bulletin 80-17,Suppl 1, Failure of 76 of 185 Control Rods to Fully Insert During Scram at Bwr. Analysis & Review of as-built Scram Discharge Vol & Associated Vent & Drain Sys Is Completed
ML19340B114
Person / Time
Site: Cooper Entergy icon.png
Issue date: 08/12/1980
From: Pilant J
NEBRASKA PUBLIC POWER DISTRICT
To: SEYFRIT K V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
Download: ML19340B114 (3)
Responds to Items B1 & B2 in IE Bulletin 80-17,Suppl 1, Failure of 76 of 185 Control Rods to Fully Insert During Scram at Bwr. Plans to Install Ultrasonic Water Level Monitoring Sys Are Underway
ML19340B112
Person / Time
Site: Cooper Entergy icon.png
Issue date: 08/15/1980
From: Pilant J
NEBRASKA PUBLIC POWER DISTRICT
To: SEYFRIT K V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
Download: ML19340B112 (2)