ML19340A985

From kanterella
Jump to navigation Jump to search
Interim Insp Rept SO-II-7 on 680916-20.No Noncompliance Noted.Major Areas Inspected:Written Matl Control & Accounting Procedures,Internal & External Fuel Movement Documentation & Inventory Records.Final Rept by 681220
ML19340A985
Person / Time
Site: Dresden Constellation icon.png
Issue date: 10/11/1968
From: Kenna W
US ATOMIC ENERGY COMMISSION (AEC)
To:
Shared Package
ML19340A984 List:
References
SO-II-7-01, SO-II-7-1, NUDOCS 8009240797
Download: ML19340A985 (1)


Text

1 r-(

(

w.

V l

INTERIM REPORT - STATD(ENT OF FINDINGS COMMONWEALTH EDISON COMPANY, NORRIS, ILLINOIS DRESDEN UNIT NO. 1

. __4 INSPECTION NO. S0-II-7 I

k I.

The inspection of all items of safeguards control was completed September 20, t

1968, with satisfactory results. The inspection covered the period January 1, 1967, through June 30, 1968, and required approximately 10 man days of field work for completion.

II. There were no items of non-compliance noted during the inspection.

III. The attachcd Memo to the Files details the preliminary findings. As noted in the memorandum, all items were discussed with appropriate members of the

+" "

Dresden staff, in the absence of the station superintendent, and with the pgy member of the home office staff responsible for preparation of the semiannual MSR.

IV. It is estimated that ISOCHECK calculations will be completed by December 6,1968, and the final report iseued by December 20, 1968.

f')

ha./

Date:

October 11, 1968 W. R..enna 4

i Director f,

District II Safeguards Office

._,--~ ~ ~ -.

NI

~

I, g

~