Text
_ .__
,
.
._ ._
_.
.
_
_
_.
-
!
"
L_
.
C:)
'
. -
.
('~'
UNITED STATES NUCLEAR REGULATORY 20MMISSION
OFFICE OF INSPECTION AND ENFORCEMENT
,
'
REGION III
Report of Emergency Planning Inspection
i
IE Inspection Report No. 050-010/76-22-
i
IE Inspection Report No. 050-237/76-24
IE Inspection Report No. 050-249/76-24
.
)
Licensee: Commonwealth Edison Company
P. O. Box 767
4
j
Chicago, Illinois 60690
J
!
Dresden Nuclear Power Station, Units 1, 2 and 3 Licenses No. DPR-2
Morris, Illinois
No. DPR-19
i
and No. DPR-25
l
Category:
C
.
Typd of Licensee:
-
BWR (GE) 2527 MWt - Units 2 and 3
i
l
Type of Inspection:
Special, Unannounced
i
l
}
Dates of Inspection:
November 4 and 5,1976
"/ll .
02.65'~M~
~
'M4h4
,
Principal Inspector:
M. J Oestmann
(Date)
,
Accompanying Inspectors:
None
.
Other Accompanying Personnel:
None
Vf$
Reviewed B :
J. A. Pagidaro, Chief
/30/ /M
Environmental and Special
/(Dite)
s
l
Projects Section
i.
5
,
Y
t
e
.8008270f0f.
F'
I
.
'
.
. . -
, .
,
.
s.
.
'
.
.
p
SUMMARY OF FINDINGS
.
Inspection Summary
Unannounced, special " emergency planning followup inspection conducted
on November 4 and 5,1976, (Unit 1, 76-22)(Unit 2, 76-24) and (Unit 3,
76-24): Reviewed the completion of the emergency plan imp
procedures (EPIPs)inaccordancewithlicenseecommitmentpementing
and discussed
the status of the temporary medical area and first g
supplies which
wereitemsdescribedinpreviousinspectionreportsygj
-- as requiring
further action.
Enforcement Items
,
None.
Licensee Action on Previously Identified Enforcement Items
No previously identified enforcement items within the scope of this
inspection.
Other Significant Items
.
A.
Systems and Components
-
t
The licensee has discontinued the use of a temporary medical
area and removed therefrom all medical and first aid equipment;
however, the licensee is using a #36 first aid kit and table in
the decontamination area for first aid needs.
(Paragraph 4,
Report Details)
.
B.
Facility Items (Plans and Procedures)
The licensee has completed a set of emergency plan implementing
procedures (EPIPs) for the Dresden Nuclear Power Station as
listed in Section 10 of the Generating Stations Emergency Plan
(GSEP), dated January 2,1975.
(Paragraph 3, Report Details)
C.
Managerial Items
.
No significant items identified.
1/
Letter dated April 2, 1976,-from R. L. Bolger, CECO, to J. M. Allan,
NRC Region III Office.
2/
IE Inspection Reports No. 050-010/76-03; No. 050-237/76-02 and
No. 050-249/76-02.
3/
IE Inspection Reports No. 050-010/76-16; No. 050-237/76-19 and
i
No. 050-249/76-19.
-2-
-
,
.
e
_ . . - _
.
..
. _ . -
. _ . . -
_
.
_
. _ .
--..
_ _ .
.
_
_ _
_
..
_
..
. . , - _ . -
. L.
.
. ,
,
.
.
1
f'
D.
Deviation
,
.
Contrary to the commitment made by the licensee on pag
E ll of
18, 1975,gj he
l
Appendix l' to a letter to NRC dated February
t
i
licensee did not, have available eight items out of the 31 items
t
in the #36 first aid kit located in the decontamination area.
i
(Paragraph 4, Report Details)
E.
Status of Previously Reported Unresolved Items
'
i
i
No previously reported unresolved items within the scope of this
inspection.
Management Interview
d
A management interview was conducted on November 5, 1976, with Messrs.
!
,
J. Abel, D. Adam, D. Simpson, and W. Willeford at the conclusion of
this inspection. The following items were discussed with the
i
licensee representatives:
,
,
)
A.
The NRC inspector discussed the scope and extent of this
!
inspection.
(Paragraph 2, Report Details)
B.
The NRC inspector discussed the review and completion of the
emergency plan implementing procedures for the Dresden
~
Nuclear Power Station.
(Paragraph 3, Report Details)
'
,
(
C.
The NRC inspector discussed the need to update at least semi-
annually the names and phone numbers of the GSEP organization
)
and support group personnel specified.in EPIP 4.1 through 4.3,
Revision 1,
January 1976.
(Paragraph 3, Report Details)
~
D.
The NRC inspector reviewed the status of the temporary medical-
area, ficluding the deviation regarding the missing items from
-
the #30 first aid kit.
(Paragraph 4, Report Details)
1
A
4
l
i
,
1
4/
Letter dated' February 18, 1975, from J. S. Abel, CECO, to
'
D. L. Ziemann, USNRC.
1
-3-
4
,
.
1
d
!
L
r-
.
-
-
.
--
- - - . .
-- -.-
.
- --
,
.
.
L.
.
. . .
-
.
.
,
s
(
REPORT DETAILS
.
_
l.
. Persons Contacted
J. Abel, Assistant to the Plant Superintendent
'
D.. Adam, Radiation Chemistry Supervisor
D. Simpson, Radiation Protection Engineer
W. Willeford, Quality Assurance Engineer
B. Spelde, Procedure Coordinator
2.
General
The inspection consisted of a follogyp of several open items
identified in a previous inspection- conducted on January 27-30,
and February 2 and 13, 1976, and another inspection conducted
24, 1976. f Other correspondence related to these pre-
on June
,
vious inspections include the following:
a.
Letter dated April 2,1976, from R. L. Bolger, CECO, to
J. M. Allan, NRC Region III Office.
b.
Letter dated April 22, 1976, from J. M. Allan, NRC
~
Region III Office, to B. Lee, Jr., CECO.
_
'
c.
Letter dated June 7, 1976, from R. L. Bolger, CECO, to
J. M. Allan, NRC Region III Office.
d.
Letter dated July 14, 1976, from B. B. Stephenson, CECO,
'
to M. J. Oestmann, NRC Region III Office.
i
'
e.
Letter dated August 10, 1976, from J. M. Allan, NRC
I
Region III Office, to B. Lee, Jr., CECO.
Documentatio.. of emergency plan implementing procedures was
reviewed by.the inspector. The status of a temporary medical
j
area and first aid supplies and facilities was discussed with
licenseerepresentativestoreso}ygjopen items identi:: led in
the previous inspectior. reports.- --
(
.
5/
IE Inspection Reporta ha. 050-010/76-03; No. 050-237/76-02 and
No. 050-249/76-02.
6/ ' IE Inspection Reports No. 050-010/76-16; No. 050-237/76-19 and
~
No. 050-249/76-19.
7/
IE Inspection Reports No. 050-010/76-03; No. 050-237/76-02 and
No. 050-249/76-02.
8/
IE Inspection Reports No. 050-010/76-16; No. 050-237/76-19 and
,
No. 050-249/76-19.
.
-4-
.
?
.
. .
.
- ..
.
.
. _ .
.-.
_.
.
. . . . ..
..
.- -
--
. ..
_ _ -
.
-
___.
. _ .
. . _ _ _ ,
._s
._ .
_ _ _ _ _ _ _ . . . .
7
_
_ _ _ . _ . . _ _ . . -
.-
H.
..: - _
.
L
-
,
!
a
.-
,
-%
3.
Implementing Procedures
j
As pointed out in a previous inspection report,-/some implementing
~
9
procedures (EPIPs) had been written and approved, some were
under review and some were being prepared. The licensee has
completed and approved the Dresden Nuclear Power Station EPIPs
as listed in Section 10 of GSEP in accordance with his commitment
,
l
that the EPIPs would be completed by October 1, 1976.
1
The inspector noted that the names and phone numbers of the GSEP
organization and support group personnel listed in EPIP 4.1-4.3,
Revision 1, January 1976, needed to be updated.
This item will
be_ examined during a subsequent inspection.
<
l
4.
Medical Area and First Aid Facilities and Supplies
10/11/
9
As discussed in the previous inspection reports,
the licensee
I
,
'had been using a temporary onsite medical area until a permanent
area is available by January 1, 1977, in accordance with a commit-
t
ment made by the licensee. The inspector discussed the inad
of the temporary medical area during the previous inspectionggyacy
-
and the desirability that the licensee's medical doctor visit
,
the medical area. One of the licensee's medical doctors visited
~ the temporary medical area in July 1976, and recommended
-
elimination of the room for first aid purposes and the removal
of all medical and first aid equipment.
The doctor also
recommended placing a #36 first aid kit and table in the de-
,
contamination area. The inspector examined this kit and-found
eight out of 31 items missing. The licensee has therefore
incurred a deviation fren
commitment made on pa
E ll of
]
Appendix E to his lette. aated February 18, 19.75,ggf hich includes
-- w
a list of first aid supplies in #36 first aid kit.
This item
,
will be examined during a subsequent inspection.
!
The inspector also noted that the licensee had modified the
,
'
corresponding plant procedure for the decontamination and medical
area in accordance with technical specification requirements to
account for the change in the medical faci 41 ties and supplies.
.
.
9/
IE Inspection Reports No. 050-010/76-03; No. 050-237/76-02 and
No. 050-249/76-02.
,
10/ IE Inspection Reports No. 050-010/76-03; No. 050-237/76-02 and
i
No. 050-249/76-02.
11/ IE Inspection Reports No. 050-010/76-16; No. 050-237/76-19 and
No. 050-249/76-19.
l
12/ Ibid.
j
-
13/ Letter dated February 18, 1975, from J. S. Abel, CECO, to
D. L. Ziemann, USNRC.