ML19340A280

From kanterella
Jump to navigation Jump to search
Comment (30) E-mail Regarding WEC - CFFF Draft EA
ML19340A280
Person / Time
Site: Westinghouse
Issue date: 11/26/2019
From: Public Commenter
Public Commenter
To:
Office of Nuclear Material Safety and Safeguards
NRC/NMSS
References
84FR57777
Download: ML19340A280 (4)


Text

From:

Taylor, G. Ken <taylorgk@dhec.sc.gov>

Sent:

Tuesday, November 26, 2019 2:24 PM To:

WEC-CFFF-EA Resource Cc:

Quintero, Jessie; Porter, Henry; Siron, Don; Reece, Myra; Marcus, Mike; Thompson, Rhonda; Shealy, Renee; Berresford, James; Frost, Keith

Subject:

[External_Sender] Comments on Docket ID NRC-2015-0039, Westinghouse Columbia Fuel Fabrication Facility, by the SC Department of Health & Environmental Control Attachments:

SC DHEC Comments on draft NRC EA for CFFF.pdf U.S. Nuclear Regulatory Commissiion, Please accept these comments per the instructions on the Regulations.gov web page for the draft EA, Columbia Fuel Fabrication Facility, due date 11/27/19.

Thank you.

G. Kendall Taylor Director Division of Site Assessment, Remediation & Revitalization (SARR)

S.C. Dept. of Health & Environmental Control Office: (803) 898-0835 Mobile: (803) 862-9521 Connect: www.scdhec.gov Facebook Twitter

Federal Register Notice:

84FR57777 Comment Number:

30 Mail Envelope Properties (BN7PR09MB28349196A108D5663A55DBF58F450)

Subject:

[External_Sender] Comments on Docket ID NRC-2015-0039, Westinghouse Columbia Fuel Fabrication Facility, by the SC Department of Health & Environmental Control Sent Date:

11/26/2019 2:23:34 PM Received Date:

11/26/2019 2:23:39 PM From:

Taylor, G. Ken Created By:

taylorgk@dhec.sc.gov Recipients:

Post Office:

BN7PR09MB2834.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 594 11/26/2019 2:23:39 PM SC DHEC Comments on draft NRC EA for CFFF.pdf 2109137 Options Priority:

Standard Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date:

Recipients Received: