Mem,politan Edison Company F
Post Office Box 480 e
Middletown, Pennsylvania 17057 717 9444041 Writer's Direct Dial Number February 6, 1981 LlL 033 Office of Nuclear Reactor Regulation Attn:
D. G. Eisenhut, Director Division of Licensing U. S. Nuclear Regulatory Co= mission Washington, D.C.
20555
Dear Sir:
Three }ille Island Nuclear Station, Unit 1 (D1I-1)
Operating License No. DPR-50 Docket No. 50-289 Response to NUREG 0737, Rev. 1 Attached are two revised pages to TLL-680, dated January 23, 1981 to D. G. Eisenhut from R. C. Arnold regarding NUREG 0737. These revised pages correct typographical errors that were contained within the above letter.
Sincerely,
_1 I
r.v /:
/,
.i,-r R. C. Arnold Chief Operating Executive RCA: Wit:laa Attachments cc:
R. W. Reid D. Dilanni H. Silver
[
.. (y 2
C FES I 2 Lc8N C.
Sf ** g;yren j'3
/
040-8102170OS
'saft
"'etr 200!.t3D EC. Son COmCary is a f.'er"ter Of !Pe Gerera! PUOMC Uti!.e5 $ystem
METROPOLITAN EDISON COMPANY JERSFY CENTRAL POWER & LIGHT COMPAW AND PENNSYLVANIA ELECTRIC COMPANY THREE MILE ISLAND NUCLEAR STATION, LNIT 1 Operating License No. DPR-50 Docket No. 50-289 This letter supplements Licensee's previous response (TLL-680, January 23, 1980) to the Nuclear Regulatory Commission request concerning NUREG 0737
" Post TMI-Requirements" dated October 31, 1980 for Three Mile Island Nuclear
,tation, Unit 1.
All statements contained in this report have been reviewed and all such statements made~and matters set forth therein are true and correct to the best of my knowledge, information and belief.
METROPOLITAN EDISON COMPANY 7
f.
By i
T
/N Chief Operating Executive Sworn and subscribed to me this e
day of 1'--a, 1981.
'E ^'
~d By Notary Public te, t m m:y w "3,
[--
Rev.
1, 1.11.-013
- - Het Ed THI-! Response to NUREC-0737 TI.l.-680 Enclosure I requirements items 1/23/81*
Page1 of17 NRC NUREC-0737 NRC SPECIFIC LICENSEE LICENSEE COMMENTS ITEM NUMBER ITEM AND SCilEDULE TECilNICAL
}
in Sil0RT TITLE SCHEDULE PROPOSAL COMMITHENT REFERENCES
\\
l.A.l.1 Sliift Technical
- 1. On Duty 1/1/80
- 1. Complete R.R. 5.2.2 SER, Section 2.2.1.b(
advisor
- 2. Tech specs 12/15/80 2 4/1/81 discusses Licensee
- 3. Trained per 1/1/81
- 4. Descrlhe 1/1/81
- 4. 3/81 per company program long-term will be completed.
program I.A.I.2 Shift supervisor Delegate non-safety Complete R.R.
5.2.6 SER Supp. I Section thg responsibilities duties 1/1/80 discusses Licensee Compilance I.A.I.3 Shift manning
- 1. Limit 11/1/80
- 1. Complete TI.I. 392 10/20/80 SER Supp. 1 Section ivc overtime discusses 1.icensee
- 2. Min Shift 7/1/82
- 2. 7/1/82 TLI.- 655 12/19 /80 Compliance (See TLL-655 for crew (Target date-before status of Licensee Procedur c ri t. See comment s) in Conduct of Operations)
NRC exams of 100% of operators scheduled Apr/
Hay 81.
Compliance prior to 7/1/82 dipendent on personnel retention and outcome of NRC exams.
I.A.2.1 Immediate
- 2. SR0s be Ros 12/1/80 discusses 1.icensee and SRO training 1 yr Compliance and qualifications
- 3. Three mo 8/1/80 trng on shift I
- 4. Modify 8/1/80 training
- 5. Facility 5/1/80 certitication I.A.2.3 Administration of Instructors 8/1/80 Complete TI.I.-180 8/8/80 SER Supp. I Section IVe tralulun programs complete discusses I.icensee
Rev. 1, LIL-033 TI.L-680
' - Status an! Schedule for EFW modifications 1/23/81 Page 4_ of 4_
FOOTNOTES 4
(1) Item represents a schedule change from previous License 9/NRG correspondence.
(2) Safety grade start on loss of 4 RCP's and 2 MFW pumps is before restart.
1)ue to projected engineering & procurement lead time on safety grade OTSG 1evel insts, initiation on SG 1evel is Cycle 6.
(3) Licensee is unaware of implementation dates for these specific items at specific plants.
1/1/82 represents 0737 date for completion of II.E.1.1 (4) For modifications, the complei. ion date shown reflects the date the construction and construction testing is projected for completf or..
Startup and test, technical specifications and training will likely follow these dates. As noted, " optimistic" dates presume accelerated l
engineering, procurement, construction and construction testing beyond that currently planned. Realistic dates based uposi current engineering projections, procurement commitments and normal construction scheduling are later than these "opimistic" dates and are identified as " target" dates.
g For modifications in 1982 and later, Licensee is proceeding expeditiously, liowever, engineering, procurement, and the availability of plant condi-tions for installation must be firmly established before more reflued dates can be established.
Technical Specifications are scheduled for submittal 4/1/81.
In certain cases where the specifications cannot be complete, schedule updates will be provided for each perspective change outstanding.
TI.I.-680 1/23/0I - Status and Scheilule for EIU moillficat ions ~
page 2 of 4 Enclosure I regulrements items
^
NRC NUREC 0680 (SER)
NRC SPECIFIC LICENSEE LICENSEE COMMENTS ITEM HUMBER ITEM AND SCilEDULE TECHNICAL
& SiiORT TITLE SCHEDULE PROPOSAL COMMITHENT REFERENCES ORDER ITEM #1 (cont.)
SER 0737 Hefore > 5% power 1.b EIV: Ind. of ICS Restart Not 3/81 (Target date)
R.R. 2.1.1.7 &
Manual loailing station to Specified be installed before ORD,ER ITEli #8 restart (See also 2.1.7.a.)
2.1.7.a EFW auto initiation Restart 7/1/81 liefore > 5% power R.R.
2.1.1.7, Safety grade pump start St, P3,()4 &
on loss of 4RCPs or 2HFP S1, P2, Q13 and auto start alarm -
TI.I.-500 10/2/80 See 1.a.1 ASI.B testimony of a e y p,raile pump start on IN/ Steam differential Additional EFW items 60 days Long term See comments Capodanno, et. al.
01' E M d re<guired by NRC staff of mods. on and <luestion 6.
,g, (celu lla i en t to 0737 matl.
schedule Safety grade OTSG auto Item II.E.1.1. long receipt agreed t 1
1
-M i dm term modifications) with Lic.
,, g,
,, g, cavitating venturls, CWST level indicators / alarms, and OTSG level to be provliled by Cycle 6 refueling.
A control grade OTGS level lustrument independent of the ICS will lie provided befora cri t ical it y.
2.1.7b EFW flow ludication 1/1/81 7/1/81 l See 1.a.5 R.R. 2.1.1.7 Environmental <1ualification information to be provided l
when receivett from tlie vendor.
f i
9 9
TI,L-680 - Status and Schedule for EFW modifications 1/ 23/ti!
Enclosure I re<1uirements items p
y )gg4 NRC NUREC 0680 (SER)
NRC SPECIFIC LICENSEE LICENSE 2 COMMENTS ITEM NUMBER ITEM AND SCllEDUI.E TECHNICAL g
fi Sil0RT TITi.E SCilEDULE PROPOSAL COMMITHENT REFERENCES ADDITIONAL ITEMS (St:R)
SER 0737 1.
CWST level alarms Restart Not
' ~
liefore > 5% power R.R. S1, p2, Alarms will not be from Spec 1 fled (See Comments)
Q10a independent power supplies before restart.
Inst, will alarm on loss of power and local tank readings will l>e taken.
2.
EFW 48 hr. endurance test Restart Not Specified lie fo re > 5% power R.R. S 1, p2, Q 7 Startup procedure to be submitted and conducted SER O Cl-8 3.
FFW U.ucr source transfer Resta:
Not Specified Complete Completed SER 0 Cl-9 4.
MSL Rupt. detection system Restart Not Specified Original design R.R. SI, p2, Q9 Completed. SER 0 Cl-9 5.
EFW water source protection Restart lNot Specified Original design R.R. Si, pl, Q10 SER @ Cl-9 6.
Restart No t. Specified 6a. TBD R.R. SI, p2, Ql4 SER P Cl-9 a.
2 hour2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> air Supp.
1, p.2,
- b. Reset EFW turbine 6h. TilD Q31 6
,1 safeties j
7.
tipgrade EF-V30A/ll for Restart! Not Specified 6/10/H2( )
R.R.,
SI, p2 Qi4 Will not be completed steam break environment i
before restart due to e<pilpment del ivery.
vendor has not provided commitment date. SER 0 Cl-10 H.
EFW Cross tle lireak Rest art ' Not Specifled lie f o re > 5% power R.R. SI, p2, Ql2 NDE of the 10 highest I
(Targeted for ASI.it testimony of stressed welds to be June, '81)
Capodanno, et.al.
lut r f o rmed.
and eptest ion 6.
SER @ Cl-10.
Engineering evalnation anticipated in 3 / 11 1 for basis of weld selectlon.