Notice of Issuance of Temporary six-month Extension of Preliminary Design Approval
ML19339C986
Person / Time
Site: 05000447, 05000470, 05000480
Issue date: 01/15/1981
From: John Miller
Office of Nuclear Reactor Regulation
To:
Shared Package
ML19339C985 List:
References
NUDOCS 8102130046
Download: ML19339C986 (2)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

4

()

7590-01 UNITED.'TATES NUCLEAR REGULATORY COMMISSION DOCKET NOS. 50 447, 50-470 AND 50-480 THE GENERAL ELECTRIC COMPANY THE COMBUSTION ENGINEERING COMPANY AND THE WESTINGHOUSE ELECTRIC CORPORATION NOTICE OF ISSUANCE OF TEMPORARY EXTENSIONS OF PRELIMINARY DESIGN APPROVALS The U. S. Nuclear Regulatory Commission (the Commission) has issued temporary six-month extensions for the preliminary design approval (PDA) of the General Electric GESSAR-238 Nuclear Island (PDA-1), Combustion Engineering CESSAR System 30 (PDA-2), and Westinghouse RESAR-41 (PDA-3) standard nuclea-steam supply systems. These extensions apply to the applicability period during which a utility may reference these standard designs in construction permit applications.

If a utility's application is received, referencing an extended PDA, it will be reviewed against current licensing requirements. Ccasequently, we expect that the preliminary design would be updated at that time to reflect the licensing requirements which have evolved since the PDA was issued.

The Commission has taken this action in order to conserve the resources that have been expended in the review of the preliminary design of these nuclear 0102130346 7

_~..

d a

i 2-J N

4 steam supply systems and to make effective use of the standardi:ation concept, I

while new guidelines for PDA extensinns aFe under consideration.

Copies of the PCA extensions, dated December 31, 1980, are available I

for public inspecticn at the Commission's Public Document Room,1717 H Street, N. W., Washington, D.C.

Copies of the PDA extensions may be obtained upcn request addressed to the U. S. Nuclear Regulatory Commission, Washington 0.C.

~

20555, Attention: Director Division of Licensing.

th Dated at Bethesda, Maryland this 15 day of January 1981.

FOR THE NUCLEAR REGULATORY COMMISSION f-j e

t.

'.ILt

,...- r,,,., VJames R. Mille)r, Chief 1

j Standardization and Special Projects Branch Division of Licensing 4