Affidavit Submitting Three Charts Showing Present Status of safety-related Structures & Completion of Design.Certificate of Svc Encl
ML19339C701
Person / Time
Site: Seabrook  NextEra Energy icon.png
Issue date: 11/12/1980
From: Devincentis J
YANKEE ATOMIC ELECTRIC CO.
To:
Shared Package
ML19339C700 List:
References
NUDOCS 8011190118
Download: ML19339C701 (6)


Text

-

) ,

- lf' 'T::M y

. 0 ll 'f l / ,,, Il 51 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION

-f;;; 3 before the ATOMIC SAFETY AND LICENSING APPEAL BOARD

)

In the Matter of )

)

PUBLIC SERVICE COMPANY OF NEW ) Docket Nos. 50-443 HAMPSHIRE, _et _al. ) 50-444

)

(Seaorook Station, Units 1 and 2) )

)

AFFIDAVIT OF JOHN DeVINCENTIS JOHN DeVINCENTIS, being on oath, deposes and says as follows:

1. He is the project manager of the Seabrook project for Yankee Atomic Electric Company.
2. Attached hereto and marked "A" is a chart showing the

, present status of completion of safety-related structures at Seabrook as of October 1, 1980, and the presently projected percentage of completion for six-month intervals thereafter.

3 Attached-hereto and marked "B" is a chart showing the present status of completion of the design, purchasing and fabrication of safety-related equipment and materials in the Nuclear Steam Supply System as of October 1, 1980, and the presently projected percentage of completion for six-month intervals thereafter.

8 o 11 to o II3r

4.- Attached hereto and marked "C" is a chart showing the-

'present status of completion of the design, purchasing and fabrication of safety-related equipment and materials in the balance of plant as'of October 1, 1980, and the presently projected percentage of completion for six-month intervals thereafter.

' hn D6Vincentis

' hwN

~

COMMONWE LTH OF MASSACHUSETTS loi (o 5 k , ss . November 12, 1980 Then appeared before me the above-subscribed John DeVincentis and made oath that he had read the foregoing affidavit and that the statements set forth therein are true to the best of his knowledge.

Before me, m ,f

(?- ~

Ifctary Pu~ol y My Commission Exp' ires:

TilD:' ' '. G. P'^ . i ,' .c

'*
c.;~

Fi r - . E ri'< ? N > 2.1 % 1 a

e Y

l

SAFETY-RELATED STRUCTURES 1/

Percent Completion" Description Present 6 Months 12 Months 18 Months Containment Structure 54/4 65/6 75/18 85/30 Containment Enclosure 1/0 5/0 25/0 50/0 Primary Auxiliary Building 60/6 70/7 82/16 95/25 Fuel Storage Building 38/0 40/2 65/15 95/30 Waste Processing Building 42/na 50/na 70/na 90/na -;c Control and Diesel Generator Building 69/5 80/6 95/15 100/25 Electrical Cable Tunnels and Penetratten Areas (Control Building to Containment ) 16/0 50/0 80/0 100/0 Service Water Pump House 24/24 26/26 60/60 90/90 Emergency Boiler Feed Pump Enclosure 0/0 0/0 20/0 50/0 Spent Fuel Pool 38/0 40/0 65/0 80/0 Cooling Tower 83/na 90/na 100/na 100/na

1. Est. For Civil Structural Only Does not include mechanical or electrical equipment or supports CUnit 1/ Unit 2

-e- - ,- - - _ - . - - _ - - - - - . - _ _ - . - . . - - . . . _

' L.:

b SAFETY-RELATED EQUIPMENT & MATERIALS ,

Percent Completion s

. Nuolear Steam Supply System Present 6 Months 12 Months- 18 Months Design (All) 90/90 984/911 97/97 100/100 Purchasing 99/99 99/99 100/100 100/100 [m Fabrication 83/65 93/78 97/87 100/92

  • Unit 1/ Unit 2 e

D

+

- - , , , , y -

r-w-, - -


\

, ----,.--n-~-,~.-- -r- e ~,- - - - - 's--ve----- -<-w,-e.v. , , -~ ,-4 c-- --

, -n-s, , , man-, ,

SAFETY-RELATED EQUIPMENT &' MATERIALS Percent Completion" --

Balance of Plant Present 6 Months 12 Months 18 Montha Design (All) 89/89 92/92 93/93 94/94 Purchasing 99798.5 99/98.5 99.5'/99 100/100 Fabrication 79/42 88/50 94/63 97/78.5 b'

  • Unit 1/ Unit 2 4

. , . . _ _ . _ . . . . - _ . -__...o. ., . , , . . . _ . _ , - , , _ _ , - . , , . . - , _ , , _ _ . . _ _ . . ,_,__..y..__ - _ , 3 _. ._ . _ , . .

CERTIFICATE OF SERVICE I, Thomas G. Dignan, Jr., one of the attorneys for the applicants herein, hereby certify that on November 13, 1980, I made service of the within document by mailing copies thereof, postage prepaid, first class or airmail, to:

Alan S. Rosenthal, Chairman 'Ellyn R. Weiss, Esquire Atomic Safety and Licensing Harmon & Weiss Appeal Board Suite 506 U.S. Nuclear Regulatory Commission 1725 I Street, N.W.

Washington, D.C. 20555 Washington, D.C. 20006 Dr. John H. Buck Robert A. Backus, Esquire Atomic Safety and Licensing O'Neill Backus Spielman Appeal Board -

116 Lowell Street U.S. Nuclear Regulatory Commission Manchester, New Hampshire 03105 Washington, D.C. 20555 Office of the Attorney General Dr. W. Reed Johnson Commonwealth of Massachusetts Atomic Safety and Licensing One Ashburton Place Appeal Board Boston, Massachusetts U.S. Nuclear Regulatory Commission 02108 Washington, D.C. 20555 Edwin T. Reis, Esquire Assistant Chief Hearing Counsel Ms. Elizabeth H. Weinhold 3 Godfrey Avenue Office of the Executive Legal Director Hampton, New Hampshire 03842 U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Atomic Safety and Licensing Board Panel U.S. Nuclear Regulatory Commission Washington, D.C. 20555 Office of the Attorney General 208 State House Annex Concord, New Hampshire 03301 Thomas G. Dignan, Jr.

Thomas G. Dignan, Jr.

9