ML19339C525

From kanterella
Jump to navigation Jump to search
Informs That Licensee Has Resumed Testing of RCS & Reactor Pressure Vessel Baseline Insps,Calibr of Instrumentation & Loop Tests of Instrumentation Circuits, & Preoperational Tests Commenced Prior to 801110
ML19339C525
Person / Time
Site: Sequoyah Tennessee Valley Authority icon.png
Issue date: 11/12/1980
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 8011180545
Download: ML19339C525 (1)


Text

1 1

TENNESSEE VALLEY AUTHCRITf CH A TTA NCOG A. TEN N FSSEE 37401 400 Chestnut Street Tower II November 12, 1980 Mr. Jat P. O'Reilly, Director Office or napection and Enforcement U.S. Nuclea Regulatory Commission Region II -

ite 3100 101 Marietta a reet Atlanta, Georgi 30303

Dear Mr. O'Reilly:

SEQUOYAH NUCLEAR PLANT UNIT 2 - DOCKET NO. 50-328 - RESUMPTION OF TESTING ACTIVITIES This is to confir that based upon the verbal clarification provided by L C. Dance of your staff and in accordance with the provisions of your Confir ar.icn of acticn letter dated Scvc=ber 10, 1980, ne have resumed testing as follcws.

1.

Those precperational tests that had started before er were in progress on November 10, 1980 2.

The reactor coolant syste= and reactor pressure vessel baseline inspecticns 3

calibration cf instrumentation and leep tests of instru=entation circuits

'de acknowledge our responsibility for ensuring the adequacy of the conduct of these tests in accordance with written, approved procedures. Quality Assurance employees will actively :nonitor the conduct of these tests on a shift basis.

The course of action outlined above was discussed with Mr. Dance on November 12, 1980.

Very truly yours, TENNESSEE VALLEY AUTHORITY DTD D

~

@~l &

e Y

w k Ju L. M. Mills, Manager Nuclear Regulation and Safety

$oli Mr. Victor Stello, Director /

4 cc:

Office of Inspection and Enforcement U.S. Nuclear Regulatory Consission

) O Washington, DC 20555 eo o iss

__