CONNECTICUT YANKEE ATOMIC PO'ER COMPMN liADDAM NECK PLANT IIADDAM, CONNECTICUT MOSTitLY OPERATING REPORT NO. 80-10 FOR TIIE MONTH OF OCTOBER, 1980 l

80111goq67

... ~.

i s

l PLANT OPERATIONS The following is a chronological description of plant operations for the month of October, 1980.

10/1/80 At the beginning of this report-period the plant was at 90%.fu11 power with a load increase in progress from l

50% to full power following the shutdown-for the turbine l

balance program.

0235 Plant at full power.

0945 1A charging pump out of service for maintenance.

Return to service @ 1108 hrs.

10/3/80 0105 Received rod drive slave cycler alarm and rod stop.

No movement on Bank "B".

Tested "A" bank rods for movement. Pulser on slave cycler repaired 3

and returned to service @ 0240 hrs.

l 0745 Both main stack monitor pumps out of service.

Chemistry sampling main stack effluent by alternate method. Stack monitor return to service @ 1240 hrs.

i 10/6/80 0923 Determined #3 turbine control valve sticking. During j

operation. Ran test motor on #4 valve open.

Closed

  1. 3 control valv2 with test motor to a slightly open position using #4 valve for turbine control.

i 10/10/80 0818 Ran operability test on "A" LPSI pump.

Removed "B"

~

LPSI pump from service for maintenance work on coupling guard. Returned "B" LPSI pump to service i

@ 1032 hrs.

i j

10/13/80 0853 Passed 52 Billion KW gross cineration.

10/15/80 1715 Established fire watch in PAB upper level due to failure to test CO2 syst.cm on HEPA-HECA filter.

Completed PAB charcoal 'ilter CO2 system test

@ 1500 on 10/17/80 and discontinued fire watch.

10/20/80 0620 Lost level in ADT evaporator due to failed gasket on discharge of reboiler pump. Pumped 1800 gallons to waste liquid system with Radwaste building sump pump--replaced gasket and refilled evaporator

@ 1600 hrs.

i i

+

f f

-w

---* w e w s.

.e

--r 1m.-

10/23/80 0745 1A Auxiliary feed pump out of service for PM's.

Returned to service @ 1245 hrs.

10/24/80 1130 IB Auxiliary feed pump out of service for PM's.

Return to service @ 1530 hrs.

1635 Notified by NRC that earthquake had occurred in New Haven area. Not felt at CY.

10/26/80 0100 Commenced load decrease to perform turbino stop and control valve test.

Load at 350 MWe 1 0320 hrs. Completed test and returned to full power at 0822 hrs.

10/27/80 0815 1B Auxiliary feed pump out of service for maintenance.

Returned to service @ 1500 hrs.

10/28/80 0605 EG2A removed from service for redundant systems check.

Returned to service @ 1835 hrs.

10/29/80 0605 EG2B removed from service for redundant systems check. Returned to service @ 1535 hrs.

1 l

't j

EFFECT SPECIAL PRECAUTIONS SYSTDI ON CORRECTIVE ACTION TAKEN TO PR07IDE OR MALFUNCTION SAFE TAKEN TO PREVENT FOR REACTOR SAFETY.

C0YPO::ENT CAUSE l

RESULT OPERATION REPETITION DURING REPAIR Refueling Water Age Cracked weld at None Repaired Weld None - heater.not needed, Storage Tank head weather warm Syphon IIcater Heating Steam Leak MA 1855 Diesel Fire Pump

' Speed too low Output not up None Adjusted speed None - pump was still MA 1867 to rating operable at rbduced capacity EG2B Faulty air-Engine not None Installed spare air starter None - diesel never MA 1876 motor cranking properly motor inoperable except when when started on tagged out intentionally one side to perform work

  1. 2 Feed Reg. Valve Worn pilot relay Valve movement None New pilot installed and F.W. control system in became excessive valve scheduled for manual overhaul at next prolonged shutdown.

VCT Level Recorder Air leak inside None None Replaced air hose None recorder Power Range Channel Defective full

% power signal None Replaced full power Load run back jumper 31 power amplifier erratic amplifier installed during repair A Charging Pump Low oil dis-Standby oil None None - No reason found for None charge pressure pump started low pressure Pump was test from s. aft run and oil pressure was driven pump normal Rod Drive System Faulty Pulser Slave Cycler None Replaced Pulser Assembly None Slave Cycler -

Assembly Failure Alarm Pulser Assembly And Rod Stop Mat. Stack Monitor Apparent Wear Both Pumps None Rebuilt Both Pumps None Air Pumps MA1347 Of Vanes Tripping Motor Overloads

.-- - -. ~. -

l CONNECTICUT YANKEE REACT 0ff C01)i. ANT' ~ D AT A MONTH: OCTOBER 1980 REACTOR COOLANT ANALYSIS MINIMUM AVERAGE MAXIMUM 5 88E+00 :

6.14E+00 :

6.40E+00 :

PH G 25 DEGREES C CONDUCTIVITY (UMHOS/CM) 8.55E+00 :

1.50E+01 :

2.15E+01 :

CHLORIDES (PPM)

<4.00E-02 : <4.00E-02 : <4.00E-02 :

DISSOLVED OXYGEN (PPD)

<5.00E+00 : <5.00E+00 : <5.00E+00 :

9.15E+02 ;

9.84E+02 :

1.11E+03 :

DORON (PPM)

LITHIUM (PPM) 7.50E-01 :

1.44E+00 :

2.00Ef06 i

~

TOTAL GAMMA AC1. (UC/ML) 1.47E+00 3.18E+00 :

4.14E+00 :

10 DINE-131 ACT. (UC/ML) 1.56E-02 :

1.99E-02 :

2.48E-02 :

7.05E-01 :

7.95E-01 9.09E-01 :

I-131/I-133 RATIO CRUD (MG/ LITER) 1.40E-01 :

3.88E-01 6 00E-01 :

TRITIUM (UC/ML) 2.60E+00 :

3.58E+00 :

4.11E+00 :

HYDROGEN (CC/KG) 2.30E+01 :

2.52E+01 2.60E+01 :

AERATED LIOUID WASTE PROCESSED (GALLONS):

6.13E+04 0.00E-01 WASTE LIOUID PROCESSED THROUGH BORON RECOVERY (GALLONS):

2.25E-01 AVERAGE PRIMARY LEAK RATE (GALLONS PER MINUTE):

0.00E+00 PRIMARY TO SECONDARY LEAK RATE (GALLONS PER MINUTE):

~

. __ l i

c x

AVERACE DAILY UNIT POWER LEVEL DOCKET NO.

50-213 Conn. Yankee UNIT Haddam Neck DATE 11/10/80

, COMPLETED BY Reactor Engineering TELEPHONE (203) 267-2556 MONTH: October 1980 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 572 17 576 2

575 18 576 3

575 19 576 4

574 20 574 5

575 21 573 6

575 22 574 7

574 23 575 8

575 24 575 9

576 25 576 10 576 26 532 11 576 27 576 12 577 28 577 13 577 29 577 14 577 30 57S 15 577 31 579' 16 577 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Complete the nearest whole megawatt.

(9/77)

L

u 5

DOCKETNO. 50-213 UNITSI: Ult 0WNS AND1CWER REDUCT10Ns Conn. Yankee UNIT N AME Y

DATE 1I/10/80 COMPLETED hY Ronct or Fo@nering CJ Oct.J.1980 ltEPORT hl0NTil I LLI.I'llONE (?AD 767 M56 fM Yb -

O "i

a

. b'8

.i 3 an i iunsu s.,

r""* ' r"" e* e ps)

No.

Daic E

E?

(

)35 Event s?

S-Atinen in

' b cd j@

d g =2 lle;> net u jig gV P, event itecurrente s.

u f4 h

h No shutdowns o'r significant power reductions' greater than 20 percent during the October 1980 reporting period.

I

  • 2 1

4 l' I.nwJ lteamn:

Melln>J:

Ex!nhit G. Insientti wis 5 S.I.cJule.I A 1:.!nipment 17ailm e ll.splain) l Manual fus Prepseation ol Data ll Maintenance in Test 2.Mannal Sesam.

I.e !.3 St.eets f.n I hemse C.Itclocinig

.l. Automalle Scram.

I.e..: Itepini (1.1 lu I aie INil"1.C.

I) Itcpil.it.n> ltestoistion

.I Ullas (1:xplain)

Ultil i 1 Ope atus l's.inung A Iisenw l naminallott I tiennmisair.i-i i

G Ityceational I seus 11 splat il I sinbit I hame S..ne.e.

tafff) li t tilo o il s l.nn t 4

a G

e g

p

~

p n

U J03 000 9 11111

// IEG f.0D IX

++***GC OFERATING STATUS REPORT COMPLETED BY REACTOR ENGINEERINC*****

i m

1.

UNIT N?ME... 00NN. YANVEE ATCMIC POWER CO.

DOCi(ET NO.

50-213 2.

FEPORTING FERIOri.

.0ctober 1980 LATE November 10, 1980

^

3.

LICENSED THERi%L POWER (MWT)...1025 COMPLETED BY Reactor Engineering 4

N."KPLnTE FATIN',(CT<0SS t%El... 600.3 TELEFHCNE (203) 267-2556 5.

LCIICN FLECT31 CAL RATING (NET MWF)... 5f:0

^

6.

MMIMUM DEFECALLE CAPACITY (CROSS MWE)... 577 7

MAflMUM DEFENDACLE CAPACITY (NET MWE)... 555 b 8.

II CHEES OCCUR IN CAPACITY RATINGS (ITEMS 3 THROUCH 7) SINGE LAST REPORT, CIVE REASONS.... Conn. Yankee demonstrated that it could maintain a

^

L maximum dependable capacity of 555 MNo. so the MDC 9.

PGWER LEVEL TO WHICH RESTRICTED.

IF ANY(NET MWE) p.No n was increased from 550 to 555 MWe NET. EFFECTIVE

10. REASON FOR RESTRICTION.

IF ANY.... N/A TIIIS REPORTING PERIOD.

THIS REPORTING PERIOD YR. TO DATE CUMULATIVE TO DATE

,..e m

11.

HOURS IN PEFORT!?C PERIOD 744.0 7319.0 112511.0 +

12.

NUMEER Of HOURS THE REACTOR WAS CRITICAL 744.0

~ ~ "

~ 5322.8

' ~~

~~~

96519.6

  • 13.

REACTOR FECERVE SI'UTDOWN NURS 0.0 27.0 1179.6 +

14 1:00RS CEhERATOR CN LINE 744.0 5166.9 92107.1 +

15.

UNIT RECERVE EUUTDOWN HOURS

- 0.0

~

0.0~

~ ~ ~ '

369.9 16.

CROSS ThirE L ENERCY CENERATED (MWH) 1355070.

8897036.

159038185.

17.

CROSS ELECTRICAL ENERGY CENERATED (MWH) 447699.

2914575.

52269041.

9 18.

NET ELECTRICAL ENERGY GENERATED (NH) 427876.

~

2767344

'49722107.

g 19 UNIT SEFVICE FACTOR 100.0 70.6 61.9

  • 7M 20.

UNIT AVAILA3ILITY FACTOR 100.0 70.6 82.2

  • pG7j 21.

UNIT CAPACITY FACTCR (USING MOC NET) 103.6 68.1 81.7 *

[U?

22.

UNIT CAPhCITY FACTOR (U5ING LER NET) 99.2 65.2 75.4

  • p g

23.

UNIT FORCED DUTACF RATE 0.0 0.6 6.9 +

24.

EUUTLOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE,0 ATE AND DURATION OF EACH)....None h

9 25.

IF SHUTLOWN AT END GF REPORTING PERIOD, ESTIMATED DATE OF STARTUP...N/A (w) b 26.

UNITS IN TEST STATUS (PRIOR TO CCMMERCI AL OPERATIGN)....NOT APPLICABLE

  • SINCE LATE OF COMMERCIAL GFERATIGN 1-1-68

~

~~ ~~

~

RI;FUELINC }l POI:M.\\TIO!! RT.OUT.ST 1.

Name of facility Connecticut Yankee Atomic Power Company 2.

Scheduled date for next refueling shutdown.

~

September / October 1981 3.

Scheduled date for restart following refueling Approximately six to eight vecks.

4.

(a) Will refueling or resumption of operation thercafter require a

~

technical specification change or other license amendment?

No technical specification changes are anticipated at this time.

(b)

If answer is yes, what, in general, will these be?

N/A (c) If answer is no, has the r.cload fuci design and core configuration been reviewed by your Plant Safety Rcview Committee to determine whether any unreviewed safety questions are associated with the core reload (Ref. 10 CFR Section 50.59)?

When the above stated documents are received from the fuel vendor they will be reviewed in accordance with 10CFR50.59 to determine if any unreviewed safety questions are associated with the Core reload.

. (d)

If no such review has taken place, when is it scheduled?

~

N/A 5.

Scheduled date(s) for submitting proposed licensing action and supporting information.

There are no scheduled dates because of (4) above.

Important licensing-considerations associated with refueling, c'.g., new or 6.

different fuel design or supplier, unreviewed design or performance analysis methods, significant changes in fuel design, new operating procedures.

Nonc The number of fuel. assemblics (a) in the core and (b) in the spent feel

  • 7.

storage pool.

(a) 157 (b) 389 licensed spent fuel pool storage capa. city and the size of any 8.

The present increase ~in licensed storage capacity that has been requested or is planned, in number of fuel ass:mblics.

1168 The projectcd date of the last refueling that can be discharged to the spent I

9.

fuel pocl assuming the present licensed capacity.

1994 to 1995