ML19339C388

From kanterella
Jump to navigation Jump to search
Summary of 801020 Meeting W/Doe Re Technical Aspects of Plans to Implement High Level Waste Solidification Project & DOE Responsibilities
ML19339C388
Person / Time
Site: 02700043, West Valley Demonstration Project
Issue date: 11/12/1980
From: Jennifer Davis
NRC OFFICE OF NUCLEAR MATERIAL SAFETY & SAFEGUARDS (NMSS)
To: Ahearne J, Gilinsky V, Hendrie J
NRC COMMISSION (OCM)
Shared Package
ML19339C389 List:
References
NUDOCS 8011180273
Download: ML19339C388 (2)


Text

..

E ( p ase r.

[c UNITED STATES g

NUCLEAR REGULATORY COMMISSION g

e 73 WASHINGTON, D. C. 20555

,5"

...+

-~

9 MEMORANDUM FOR:

Chairman Ahearne r

Commissioner Gilinsky N

Commissioner Hendrie ig

?:

Comissioner Bradford Q

Q

=,q u a

ci FROM:

John G. Davis, Director y

00

~

M Office of Nuclear Material Safety and Safeguards

}

y u

THRU:

William J. Dircks Executive Director for Operations

SUBJECT:

WEST VALLEY DEMONSTRATION PROJECT ACT The NRC staff met with Department of Energy (D0E) personnel on October 20, 1980 to discuss the technical aspects of DOE's initial plans to implement the high-level waste solidification project as mandated by the Act.

The discussion was divided into four categories:

1) le schedule of the DOE's activities, 3)gislative status of the Act, 2) cost and current and planned DOE's activities,
4) areas requiring DOE /NRC resolution.

A copy of the DOE's slide presentation shown at the meeting is enclosed.

The Act was signed into law on October 1,1980 authorizing the DOE to carry out a high-level liquid nuclear waste management demonstration project at West Valley.

The DOE's responsibilities under the demonstration project include solidification of the liquid high-level radioactive waste; development of containers for disposal of the solidified waste; transportation of the solidified waste to a federal repository as soon as is feasible; disposal of low-level and transuranic radio-active waste generated by the solidification program; and decontamination and decommissioning of all f acilities associated with the storap and solidification of the high-level liquid waste.

The cost / schedule baseline of the DOE's activities will be developed and maintained by the Argonne National Laboratory.

Among the DOE's planned activities include the establishment of a West Valley site project office; issuing of RFPs to obtain a prime contractor to carry out the project; and entering into agreements with the State of New York (NYS).

DOE /NYS agreements will include: 1) availability of facilities and high-level wastes from NYS to DOE without transfer of title; 2)90/10percentD0E/NYScost-sharingarrangement;3) DOE-providingtechnical assistance to NYS to amend license; 4) joint submittal by DOE and NYS of an appli-cation for a license amendment.

Contact:

C. J. Haughney, NMSS 42-74205 RO13180 b

The Commissioners,

The areas which DOE identified as requiring resolution with NRC are:

1) NR' review and consultation during the project, 2) NYS/NFS license amendaent, 3) NRC finalization of waste form criteria, 4) NRC demonstration and decommissioning requirements.

Of these items, the first two will require dedicated NRC staff attention over the next several months.

The first item will be the formulation of an interagency agreement between DOE and NRC which will specify the mechanisms for NRC's review and consultation during the project.

The Act requires that this agreement be signed by the Commission and the Secretary of Energy by October 1, 1981. Secondly, the NRC must process an application in support of modifying the existing facility license to permit the conduct of this project.

We recommended to DOE that they arrange with the present co-licensees to meet with us in the near fu,ture to begin discussions on the license modification.

It was agreed that future scheduled meetings with 00E related to the project would be publicly announced.

/

()>y /,s /3.> -,--,,

r John G. Davis, Director Office of Nuclear Material Safety and Safeguards

Enclosures:

1.

DOE Slide Presentation 2.

List of Meeting Attendees