ML19339B965

From kanterella
Jump to navigation Jump to search
Resubmits NRC Approved QA Topical Rept,APL-TOP-1A, Revision 5
ML19339B965
Person / Time
Site: Arkansas Nuclear  
Issue date: 11/06/1980
From: Trimble D
ARKANSAS POWER & LIGHT CO.
To: Haass W
Office of Nuclear Reactor Regulation
Shared Package
ML19339B966 List:
References
1-110-06, 1-110-6, 2-110-10, NUDOCS 8011100513
Download: ML19339B965 (1)


Text

'

.f l

~ '. >.,

~

s ARKANSAS POWER & LIGHT COMPANY POST OFFICE BOX 551 LITTLE DOCK. ARKANSAS 72203 [501)371 40001)_

fUC!l November 6, 1980 D EV 10 tif 9 10

..Jc

'AhygfRVICES

~'

1-110-06 2-110-10 Mr. Walter P. Haass, Chief Quality Assurance Branch Division of Engineering U. S. Nuchar Regulatory Conn.

Washington, D.C.

20555

SUBJECT:

Arkansas fluclear One - Units 1 & 2 Docket Nos. 50-313 and 50-368 License Itos. DPR-51 and flPF-G QA Topical Report Submittal (APL-TOP-1A-Revision 5)

(File: 1510.1,0233.1,2-1510.1)

Gentlemen:

Your letter of May 5,1980 requested AP&L to resubmit 36 copies of AP&L's Quality Assurance Topical Report APL-TOP-1A, Revision 5.

This report has been approved and the requested copies are attached.

This submittal applies to the Quality Assurance program implemented at Arkansas fluclear One, Units 1 and 2.

Very truly yours, MAvtN'l d David C. Trimble Manager, Licensing DCT:LDY:1p ihi Attachments 8011100 5lb f MEMF3f34 MOOLI GOLJTH UTu n N_S GVSTEM

p etc

~

UNITED STATES

,0g g,

NUCLEAR REGULATORY COMMISSION y

wAsmNGToN. D. C. 20555

/

MAY 0 51980 v

. David Trimble inager, Licensing

> kansas Power & Light Company

[h & Louisiana Streets Ittle Rock, AR 72203 ar Mr. Trimble:

BJECT: NRC ACCEPTANCE OF REVISED ARKANSAS POWER & LIGHT COMPANY'S QUALITY ASSURANCE TOPICAL REPORT ie Trimble/Haass letter of June 11, 1979 submitted Revision 5 to Arkansas Power &

ght Company's (AP&L) topical report, APL-TOP-1 A, " Quality Assurance Manual -

ierations,* for staff review and approval. Subsequent page changes were submitted a letters dated January 9 and 16, and March 31, 1930. Revision 5 revises the-

pical report to reflect organizational changes, comitments to the latest regula-
ry guides, and editorial changes, tsed on our review and evaluation of Revision 5, we find that all applicable require-ints of Appendix B to 10 CFR Part 50 are included in the QA program requirements.
erefore, your revised topical report is acceptable, and you may implement it ime-
a tely. To use the topical report in license applications

&L need only reference iis topical report in Section 17 of the Safety Analysis "-

-t.

We dc not intend to Deat our review of this topical report when it is refere in an application.

~ FAL's exception to Section C, 52 of Regulatory Guide 1.123 is considered an open em. A staff position on this subject (i.e., utilization of ANSI N45.2.13 in con-nction with Code requirements) will be transmitted at a later date.

Ould regulatory criteria or regulations change such that our conclusions about is tcpical report are invalidated, we will notify you.

You will be given the opper-nity to revise and resukait it should you so desire. Programmatic changes by AP&L this topical report are to be submitted tn NRC for review prior to implementation.

gani7ational changes are to be submitted no later than 30 davs after announcement.

ease replace our letter of September 8,1977 and its enclosure, which was the staff's aluation of the report through Revision 4, with a copy of this letter and the enclosed

ical report evaluation in your report, renumber the report APL-TOP-1A, Revision 5, h resubmit 36 copies.

Please note in your transmittal letter that the program des-ibed in Revision 5 will be implemented on Arkansas Nuclear One, Unit Nos. I and 2.

pnculd you have any questions regarding our review or if we can provide assistance, please feel free to contact Mr. James Conway on (301) 492-7741.

Sincerely, I

I Walter. Haass, Chief F

Quality Assurance Branch Division of Engineering M

0 0

port Evaluation

/

  • I

^

995006 Y

l o

UNITED STATES f

g NUCLEAR REGULATORY COMMISSION 3

a

$,,k' S.,

,I wasss Na TON, D. C. 20555

)

O W d g

O T.% /

MAY 0 51980

..s Mr. David Trimble Manager, Licensing Arkansas Power & Light Company 1

9th & Louisiana Streets Little Rock, AR 72203 l

Dear Mr. Trimble:

1

SUBJECT:

NRC ACCEPTANCE OF REVISED ARKANSAS POWER & LIGHT COMPANY'S QUALITY ASSURANCE TOPICAL REPORT The Trimble/Haass letter of June 11, 1979 submitted Revisic. 5 to Arkansas Power &

Light Company's (AP&L) topical report, APL-TOP-1 A, " Quality Assurance Manual -

Operations," for staff review and approval. Subsequent page changes were submitted i

via letters dated January 9 and 16, and March 31, 1980.

Revision 5 revises the topical report to reflect organizational changes, commitments to the latest regula-tory guides, and editorial changes.

Based on our review and evaluation of Revision 5, we find that all applicable require-ments of Appendix B to 10 CFR Part 50 are included in the QA program requirements.

Therefore, your revised topical report is acceptable, and you may implement it imme-diately. To use the 20pical report in license applications, AP&L need only reference C)

'" ' P' rea '" S*

" '7

' '"* S^' ^"'

"*? "'-

"* d " ' '"t*"d t

repeat our review of this topical report when it is referenced in an application.

l AP&L's exception to Section C, 52 of Regulatory Guide 1.123 is considered an open item. A staff position en this subject (i.e., utilization of ANSI N45.2.13 in con-junction with Code requirements) will be transmitted at a later date.

Should regulatory criteria or regulations change such that our conclusions about this topical report are invalidated, we will notify you.

You will be given the oppor-tunity to revise and resubmit it should you so desire. Programmatic changes by AP&L to this topical rep' rt are to be submitted to NRC for review prior to implementation.

Organizational changes are to be submitted no later than 30 days after announcement.

Please replace our letter of September 8,1977 and its enclosere, which was the staff's evaluation of the report through Revision 4, with a copy of this letter and the enclosed topical report evaluation in your report, renumber the report APL-TOP-1 A, Revision 5,

  • + 'a P1 in our transmittal letter that the program des-ansas Nuclear One, Unit Nos.1 and 2.

DUPLICATE DOCUMENT iew or if we can provide assistance, 1 (301) 492-7741.

Entire document previously l'

entered into system under:

Y ANO

[

dd4 Ayz,,,,,

No. of pages:

[3h

. Haass, Chief Assurance Branch of Engineering

Enclosure:

Topical Reoret Evaluation

.