ML19339B898
| ML19339B898 | |
| Person / Time | |
|---|---|
| Site: | Marble Hill |
| Issue date: | 11/03/1980 |
| From: | Shields S PSI ENERGY, INC. A/K/A PUBLIC SERVICE CO. OF INDIANA |
| To: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| References | |
| NUDOCS 8011100398 | |
| Download: ML19339B898 (2) | |
Text
_
.r,i
/
/
'o B"
PUBLIC a
SERVICE x.
x..
t INDIANA
$2 E
Bil
-G's n
~~
S. W. Shields semor vice Presdent -
Nuclear Division November 3. 1980 Mr. James G. Keppler, Director Docket Nos.: STN 50-546 U. S. Nuclear Regulatory Coc=tission,
STN 50-547 Region III Construction Permit Nos.:
799 Roosevelt Road CPPR'- 170 Glen Ellyn, Illinois 60137 CPPR - 171 Marble Hill Nuclear Generating Station - t' nits 1 and 2
Dear Mr. Keppler:
As requested by Mr. E. R. Scbweibinz of your office, Public Service Company of Indiana, Inc. (PSI) herewith submits a schedule of when final reports required by 10 CFR 50.55(e) will be submitted. The attached schedule addresses those items reported prior to January 1, 1980,
~
for which final report dates have not been previously identified.
Interim reports filed for items reported after January 1, 1980, j
include the date by which a final report will be filed and need not be readdressed here.
If you have any questions on this schedule, please i
]
feel free to contact me.
Sincerely, S. W. Shields TDG/cg cc: Director of Inspection and Enforcement U. S. Nuclear Regulatory Commission Washington, D. C. 20555 E. R. Schweibinz, P. E.
J. J. liarrison gk s
P.O. Box 190. New Wastegton. Indiana 47162 812. 293. 4441 8011100.39%
=
ATTACHMENT Open Item Final Report File Date Post-tensio'ing February 1, 1981 trumplate-l Possi' June 1, 1981 LO I conts
.dr.
Concrete surrounding December 1, 1980 i
fuel transfer canal sump.
1 i
Stud attachments to December 1, 1980 Category I embedments.
Safety Related Component December 1, 1980
- Supports, j
e
,_