ML19339B813
| ML19339B813 | |
| Person / Time | |
|---|---|
| Site: | 07100248 |
| Issue date: | 10/17/1980 |
| From: | MONSANTO RESEARCH CORP. |
| To: | |
| Shared Package | |
| ML19339B812 | List: |
| References | |
| 17670, NPD-STD-001, NPD-STD-001-R5, NPD-STD-1, NPD-STD-1-R5, NUDOCS 8011100150 | |
| Download: ML19339B813 (2) | |
Text
_ _ _ _ _ _ _
HPD-STD-001 Rev. 5-Page 6 of 33 g
1.3.1 ManagerofEngineeredProductsDecartment(Cont'd) of the Engineered Products Department.
1.3.2 Marketing Grouc Under the supervision of the Marketing Manager who reports to the Manager of Engineered Products. Marketing solicits business and receives and/or initiates all contractual documents relative to customer work being perfomed by EPD, including QA requirements R
1.3.3 Design Engineed ng Woua g
Designs and perfoms analyses under the cognizance and supervision of the Manager, Engineering Design and Development; reviews technical requirements of customer contracts; approves and generates detailed manufacturing requirements for items subject t'o NPD-STD-001 where appropriate; and is responsible for Nuclear Quality Control.
R 1.3.4 Operations Group g
~
Reports to the Manager of Engineered Products Department and is responsible for Nuclear Manufacturing, Health Physics, Nuclear Shipping / Receiving and Manufacturing Engineering.
1.3.5 Nuclear Manufacturing 5
Reports to the Manager of Operations and is responsible for all nuclear manufacturing and production activities.
gf 1.3.6 Nuclear Quality Control
. Reports to the Manager of Engineering Design a Development and is responsible for Quality 8011100 /fd
FIGURE 1 ENGINEERED PRODUCTS DEPARTMENT FUNCTIONAL ORGANIZATION CilART Dayton Laboratory
. Engineered Products I
i
~ _ _._ __ L._._ _.
I Accounting *,'
Operations Marketing Design I
I Engineering I
R5 Nuclear Quality Control ne m to O (D
I flea l th Nuclear Manufacturing
- g Physics Manufacturing ngineering u_
Nuclear Machine y
Shipping /
Shop lA Receiving
')
m C4
.)
t O
t
- c. i
- Reports Administrative 1y to Dayton Laboratory 5
--