Notification of 801112-14 Meeting W/Util in Jenkinsville,Sc to Discuss Safe Shutdown Sys,Field Audit Results of Redundant Class IE Equipment & Other SER Open Items
ML19339B536
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 10/30/1980
From: Kane W
Office of Nuclear Reactor Regulation
To: Schwencer A
Office of Nuclear Reactor Regulation
References
NUDOCS 8011070161
Download: ML19339B536 (5)


Text

.~1

/4, c. :,,%,

UNITED STATES y

g NUCLEAR REGULATORY COMMISSION g%

C WASHINGTON, D. C. 20555 OCT 3 01980 Docket No. 50-395 MEMORANDUM FOR

A. Schwencer, Chief Licensing Branch No. 2, D0L FROM:

W. Kane, Project Manager Licensing Branch No. 2, D0L

SUBJECT:

FORTHCOMING MEETING WITH SOUTH CAROLINA ELECTRIC AND GAS COMPANY DATE & TIME:

November 12-14, 1980 LOCATION:

Virgil C. Summer Nuclear Station, Unit 1 Jenkinsville, South Carolina PURPOSE:

Plant visit by representatives of the Instrumentation and Control System, Power Systems, and Reactor Systems Branches.

(See attached agenda)

PARTICIPANTS:

NRC STAFF H. Li, 0. Chopra, A. Gill, and M. Rubin SCE&G R. Clary, et. al.

,N '

,'f/

William F. Kane, Project Manager Licensing Branch No. 2 Division of Licensing

Attachment:

Agenda cc: See next page 84LL#7bLfoi /f

.- j.

' OCT 3'O 1330 cc: State Clearinghouse Office of the State Auditor

. P. O. Box 11333

.1205 Pendleton Street Columbia, South Carolina 29211

. Dr. - Lamar Priester, dr.

Deputy Commission for Environmental Health & Safety.

South Carolina Department of Health

& Environmental Control

-2600 Bull Street Columbia, South Carolina 29201 Chariman -

Fairfield County Council P. O. Box 293 Winnsboro, South Carolina 29180 U. S. Environmental _ Protection Agency ATTN: EIS Coordinator Region IV Office-345 Courtland Street, N. E.'

Atlanta, Georgia 30308 e

S O

w v

1 GENERAL AGENDA l

SL'MMER STATION SITE VISIT 1.

Control Room and Instrumentation Cabinet Area l

a.

General Layout l

b.

Nuclear and Reactor Protection instrument cabinet arrangement, layout sheidling, separation and identification.

l c.

Rod position indication l

d.

Protection System initiation and bypassing arrangements (RG 1.47 l=

recommendations).

Cabling in Control Room (separation, type, provisions).

- e.

f.

ESF Initiation and bypassing arrangements (RG 1.47 recommendations).

g.

RPS cabinets, Auxiliary Relay Cabinet - location of isolation devices.

2.

Cable Runs and Cable Spreading Area i

a.

General Layout l

b.

Implementation of Separation Criteria 3.

Vital Instrumentation and Control Power Supply Installation i

a.

General Layout l

b.

Physical and electrical separation (divisional).

l c.

Potential for damt.ge from fire, missiles, high energy line break etc.

L d.

Monitoring instrumentation e.

Batteries i

i

[

4.

Reactor Building, Auxiliary and Turbine Building i

a.

Protection system ' instrument arrangement - ins,tallation and environmental b.

Potential for instrument damage due to fire, missiles and pipe whip etc.

Separation and independence of piping and wiring to redundant or diverse c.

ins truments. -

d.

Provisions for testing protection instruments e.

Independence of safety buse:

i 15.

Reactor Trip System -

a.

Rod drive power supplies b.

Cabling and equipment identification Physical and Electrical-independence c.

d.

Provisions for testing

7 4

- e 6.

ESF Systems and Pump Rooms a.

General arrangements b.

Physical and electrical independence (interlocks).

c, Potential for damage due to fire, missiles, etc.

d.

Provisions for testing (initiation, actuation and final devices).

1

e. ~ Cabling for equipment identification. -

7.

Instrument Piping a.

Physical separation b.

Potential for damage from missiles, flooding, pipe _ whip, etc.

c.

Test features

8.

Shutdown-from Outside Control Room a.

Location of Shutdown Panel i) Habitability-

11) Potential for damage from fire, missiles, flooding, pipe rhip, etc.

b.

Identification of Controls.

9. -Cable Trace Verify the cable trace in the plant from sensor to final actuation devices on redundant RPS/ESF channels for a number of parameters - steam generator level, pressurizer pressures.
10. Other Areas Containment Sump Area Battery Room Switchgear Room Diesel-Generator Rooms 11.

Specific Open Items For Discussion 1.

Safe Shutdown Systems 2.

Field Audit Results of Redundant Class 4; Equipments 3.

Other SER Open Items

o MEETING NOTICE DISTRIBUTION m

Docket File L. Rubenstein U

N NRC PDR T. Speis

!3 3

o,r Local PDR W. Johnston E!,4 TIC B. Grimes O@c;

-d.i l

1 NSIC H. Collins i

ERA F. Pagano D

c-M

~'

,B #2 File S. Ramos

[

M H. Denton J. Stolz M

E. Case S. Hanauer g

E D. Eisenhut P. Collins R. Purple D. Vassallo

'"-4 T. Novak D. Ziemann S. Varga R. Mattson T. Ippolito R. Schroeder R. A. Clark K. Kniel R. Reid D. Skovholt R. Tedesco G. Knighton J. Youngblood M. Ernst A. Schwencer R. Baer F. Miraglia E. Ade'isam J. R. Miller A. Thadani G. Lainas ACRS (16)

D. Crutchfield Attorney, OELD W. Russell OIE (3)

J. Olshinski OSD (7)

R. Vollmer Project Manager WKane R. Bosnak Licensing Assistant MService F. Schauer Receiptionist R. E. Jackson J. LeDoux, I&E G. Lear V. Moore V. Noonan I&E Headquarters S. Pawlicki I&E Region I V. Benaroya I&E Region II Z. Rosztoczy I&E Region III W. Haass I&E Region IV D. Muller I&E Region V R. Ballard W. Regan NRC

Participants:

Dl H.

, O. Chopra, A. Gill, and M. Rubin os P. Check R. Satterfield

0. Parr F. Rosa Others: SCE&G W. Butler W. Kreger R. Clary, et. al.

R. W. Houston T. Murphy W. Gammill BCC: Applicant & Serv,ce List J. Kramer E. Hughes t