YANKEE ATOI!IC NUCLEAR P0 lier STATION MONTilLY STATISTICAL REPORT 78-5 FOR Tile MONTil 0F MAY,197S I

I 80.110eo NO

OPERATING DATA REPORT DOCKET NO.

70-29 DATE 7S0609 COh!PLETED BY P

'f. Sioeren TELEPHONE (6'-)"66 0011 x.218 OPEILATING STATUS N

'*5

1. Unit Name:

Yankee Rowe

2. Reporting Period:

'hv 10'9

3. Licensed Thermal Power (MWt):

600

4. Nameplate Rating (Gross MWe):

185

5. Design Electrical Rating (Net 31We):

173 180

6. Maximum Dependable Capacity (Gross MWe):

175

7. Staximum Dependable Capacity (Net alwe):
8. If Changes Occur in Capacity Ratings titems Number 3 Through 7) Since Last Report.Gise Reasons:
9. Power Level To which Restricted,If Any (Net MWe):

None

10. Reasons For Restrictions.lf Any:

m

(' -

This Month Yr..t o.Dat e Cumulative

11. Ilours in Reporting Period 743 3.623
12. Number Of Hours Reactor Was Critical 74a 3,464.59 127,45S.37
13. Reactor Resene Shutdown Hours 0

0 0

14. Hours Generator Onl.ine 744 3,44S 123,232.13 0

0 0

15. Unit Resene Shutdow n flours
16. Gross Thermal Ener;y Generated (MWH) 436,154.4 2,044,278.5 65,459,917.41
17. Gross Electrical Energy Generated (MWil) 133,796.8 _,

630,226.3 20,120,573.0 125,734.8 592,464.0 18,832,905.9

18. Net Electrical Energy Generated (MWH)
19. Unit Senice Factor 100.0 95.7 80.5
20. Unit Availability Factor 100.0 100.0 not available 96.6 93.4 72.6
21. Unit Capacity Factor (Using MDC Net) 90 D 93.4 72.6
22. Unit Capacity Factor (Using DER Net) 0.0 4.2 1.6
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Oser Next 6 Months (Type. Date and Duration of Each):

Refueling shutdown scheduled for October 20,197S fc,r six weeks.

25. If Shut Down At End Of Report Period. Estimated Date of Startup:
26. Units in Test Status (Prior to Commercial Operation):

Forecast Achic.-d INITI A L CRITICA LITY INITI AL ELECTRICITY COMMERCIAL OPERATION Wim D

D W }[

d*m a

' (.

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-29 UNIT Yankee Rowe DATE 780609 j

CO\\fPLETED BY R.M. Siorren TELEPHONE (6171366-9011 x.218 MONTli

?!av 1978-DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)

(MWe-Net i 1

17' d 17 172.4 2

177.8 18 173.1 3

173.1 19 174.1 172.9 174*3 4

'O M.4 3

21 88.2-173.4 6

7, 7

139.8 23 173 9 8

173.3 174.0 24 9

173.0 25 173.S 10 173.0 26 173.9 11 172.7 174.2 47 12 172.3

s 174.0 13 172.2 29 167.2 171.7 14 30 172.2 171.0 172.S 15 3;

172.0 16 INSTRUCTIONS On this format, list the verage daily unit power leselin MWe Net for each day in the repor:m; month. Compute to the nearest whole megawatt.

(u '77 )

4;]g $]gngn D

I' y

A u $&gA 3

i

(

UC T 2

(JNIT SI!!n DOWNS AND POWER REDUCTIONS UN.

e now-DATE 7R 0/i0'1 COMPl.ET Ep itY R.fl. Siocren REPORT MONTil May 1978 TELEPIIONE (6171366-9011 x.218 O

c

.5 g 3

$ E2 i Licensee Eg, g o, cause O correctise No.

Date c-

7. E

.i j$

Esent aT 9.]

Acinm to S

[s 5

j iy3 g Report sr 8i0

]O Prevent Recurrence 6

78-6 5/5/78 -

5/7/78 S

33.2 B

N/A N/A N/A N/A Throttle and control valve exercise and condenser tube cleaning.

78-7 5/29/78 S

5.8 B

N/A N/A N/A N/A Throttle and control valve exercise -

TL3

.F7 2-e)

L3 22)

G3 W

U I

2 3

4 F: fon cil Iteason:

Mettuxt:

Exhibit G Instructions

.S: St heilulcil A. Equipment Failure (Explain) 141anual for Prepar.ition of Data ll41aintenance of Test

2. Manual Scram.

Entry Sheets for I.icensee C Refueling 3 Automalie Scram.

Event Report (El!R) File (NtlRI:G-D-Itegulatory Restriction 4-Ot her (Explain) 0161) 1.-Operator Training & l.icense Examination F Atlininistrative 5

G-Opera tional is ror (lix plain )

Eshibit I-Same Somce P8/77) 11 Other (!!splain)

DOCKET NO.

50-29 UNIT Yankee Rowe DATE 780609 COMPLETED BY R. M. Sjogren TELEPHONE (617)366-9011 x.218 REPGRT MONTH May 1978

SUMMARY

OF OPEMTING EXPERIENCES 5/5 At 2200 hours0.0255 days <br />0.611 hours <br />0.00364 weeks <br />8.371e-4 months <br /> a load reduction for throttle and control valve exercise and condentar tube cleaning.

5/6 At 0100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br />, with plant load at 130 MWe, throttle valve exercise was commenced. At 0200 hours0.00231 days <br />0.0556 hours <br />3.306878e-4 weeks <br />7.61e-5 months <br /> the throttle valve exercise was completed and a load reduction to 90 1B0e was begun for condenser tube c1 caning. At 0400 hours0.00463 days <br />0.111 hours <br />6.613757e-4 weeks <br />1.522e-4 months <br /> the plant load wa: 90 MWe.

5/7 At 0710 hours0.00822 days <br />0.197 hours <br />0.00117 weeks <br />2.70155e-4 months <br /> the condenser tube cleaning was completed and plant load was increased at a rate of approximately 18 FMe/hr. At 1215 hours0.0141 days <br />0.338 hours <br />0.00201 weeks <br />4.623075e-4 months <br /> the plant was operating at full load.

5/29 At 0300 hours0.00347 days <br />0.0833 hours <br />4.960317e-4 weeks <br />1.1415e-4 months <br /> a load reduction for throttle and control valve exercise was begun. At 0515 hours0.00596 days <br />0.143 hours <br />8.515212e-4 weeks <br />1.959575e-4 months <br />, with plant load at 140 1-%e, throttic valve exercise commenced. At 0615 hours0.00712 days <br />0.171 hours <br />0.00102 weeks <br />2.340075e-4 months <br /> the throttle valve exercise was completed and plant load was increased. At 0850 hours0.00984 days <br />0.236 hours <br />0.00141 weeks <br />3.23425e-4 months <br /> the plant was at full allowable power.

There was no safety-related maintenance to report.

i

-l

- _. ~

I dh M

[

~'

fiEGULATORY INFORMATIOrj DISTRIDUTION SYSTEM (RIDS)_

DISTRIT;UTIOtJ FOR INCOMINO MATERIAL Q50-029

~

m...

ITC :

ORG: MOODY D E DOCDATE: 06/09/78 Nf?C YANKEE ATOMIC ELEC DATE RCVD: 06/15/78 D' +' :T Y PE: LETTER NOTARIZED: NO COPIES RECEIVED SUTLXCT :

LTR 1 ENCL 1 FORWAPDING EUDJECT FACILITY"5 MONTHLY OPERATING NEP'l FOR THE moi 1TH OF MAY, 1978.

PL ANT NAME: YANKEE ROWE REVIEWER INITI AL:

XJM DISTRIEUTOR Il1I TI AL:pl.,

+**n*****:+******

DISTRIEUTION OF THI9 MATERIAL IS A9 FOLLOWS

        • 444********++*

T1014T! FLY OPERATING REPORT FOR GRAY EOOK PREPARATION.

(DISTRIBUTION CODE AOO3)

FOR ACTION:

BR CHIEF ORBtt2 BCr*W/2 ENCL fREG' F ILE*I-W/hL INTERNAL:

NRC PDR**W/ ENCL MIPt tun tiUTION**W/2 ENCL

+m EXTERNAL:

LPDR'S GREENFIELD, MA**W/ ENCL TIC **W/ ENCL NSIC*&W/ ENCL F;NL(NATLAB)**W/ ENCL ACRS CAT B4+W/O ENCL Ti ! S~1 R I OUT I ON :

LTR 10 ENCL 10 CONTROL NBR:

T "~"~C 1 l

~17F i P4 5F'

,,,yy.,,

4. r :,

4.-4-4 H,-n'*-ti'cc

-r***

THE END 4+~e+s

+

+ ' + -

+ < + + t- :- u

-t +

D

3