YANKEE ATOMIC NUCLEAR POWER STATION MONDILY STATISTICAL REPORT 78 4 FOR THE MONTH OF APRIL, 1978 i
so12os.o Are
(.
D
~
OPERATING DATA REPORT DOCKET NO.
50-29 DATE 780508 R.M.
N gren COh!PLETED BY TELEP110NE (617)366-9011 x.218 OPERATINC STATUS Yankee Rowe Notes Clocks advanced one
- 1. Unit Name:
hour on 4-30-78 to 973
- 2. Reporting Pen,od:
establish daylight 600 savings ticle.
- 3. Licensed Thermal Power (SIWt):
185
- 4. Nameplate Rating (Gross 51We):
175
- 5. Design Electrical Rating (Net SIWE):
180
- 6. Siaximum Dependable Capacity (Gross 51We):
175
- 7. 51aximum Dependable Capacity (Net 51We):
- 8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report.Give Reasons:
None
- 9. Power Level To Which Restricted.If Any(Net 31We):
A
- 10. Reasons For Restrictions. If Any:
(....
This Sion h Yr to-Date Cumulative
'~
719' 2,879
- 11. Hours in Reporting Period
- 12. Number Of Hours Reactor Was Critical 719 2.720.79 126.713.97 0
0 0
- 13. Reactor Reserve Shutdown Ho.,5 719 2,704 122,488.13
- 14. Hours Generator On Line
- 15. Unit Resene Shutdown Hours 0
0 0
- 16. Gross Thermal Energy Generated (51WH) 429.845.8 1.608.124.1 65.023,763.01
- 17. Gross Electrical Energy Generated (51WH) 132,181.2,,,
496.429.5 19.986,776.2 124.314.2 466,729.2 18.707,231.1
- 18. Net Electrical Energy Generated (51WH) 100.0 93.9 80.0
- 19. Unit Senice Factor 100.0 100.0 not availabic
- 20. Unit Availability Factor 98.0 92.6 72.4
- 21. Unit Capacity Factor (Using SIDC Net) 4 98.0 92.6 72.4
- 22. Unit Capacity Factor (Using DER Net) 0.0 5.6 1.6
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Oser Next 6 alonths (Type.Date.and Duration of Each):
Refueling October 20, 1978
- For 6 weeks.
r
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation):
Forecast Achieved 2
INITIAL CRITICALITY f
INITIAL ELECTRICITY COststERCIAL OPER ATION (9/77)
(.
AVERAGE DAILY UNIT POWER LEVEI.
\\
DOCKET NO.
50-29 UNIT Yankee Rowe DATE 780508 COMPLETED BY R.M. Sjogren TELEPHONE (617)366-9011 x.218 MONTH Aoril 1978 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)
(MWe Net) g 174 173.3 y7 2
166 6 I8 173'.3 3
173.7 39 172.8 4
171.0 20 172.9 5
173.9 173.3 21 173.8 173.2' 6
22 173*4 173.2 7
n 8
173.1 173 1 24 173.3 173.2 9
25 10 173.3 26 173.1 11 173.5 27 173.0 l73*4 172.9 12 28 173.3 172.9 13 29 14 173.2 30 167.6 l
15 173.3 3g 173.3 16 INSTRUCTIONS On this format. list the average daily unit power levelin te* eA : for mach day in the reporting month. Compute to the nearest whole rnegawatt.
(9 77) i
,. \\
(,
s DOCKET NO.
50-29 UNIT SilUTDOWNS AND POWER REDUCTIONS UNIT NAME Yankee Rowe DATE 7Anqng COMPLETED BY R M-Sj ortren REPORT MONT1I April 1978 TELEPilONE (617)366 cin11 x.218 "i
.! E
.Yk Licensee
,E
- Cause & Corrective No.
Date g
gg
,g g 5 Event
. g,7 n.}
Action to Prevent Recurrence H
,$ E 5
~dc Report #
to O
~.f u
O 4
4/2/78 S
6.2 B
N/A N/A N/A N/A Throttle / Control Valve Exercise gg
'5 4/30/78 S
6.4 B
N/A N/A r/..
N/A Repacked No. 1 Boiler Feed Pump (P-1-1)
(59 EiE9
@53 EiGTJ e==
5$
c==
bb GD t
F l
2 3
4 F: Forced Reason:
Method:
Exhibit G-Instructions 5: Scheduled A. Equipment Failure (Explain) 1 Manual for Preparation of Data H4faintenance oilest 2-Manual Scram.
Entry Sheets for Licensee C-Refueling
- 3. Automatic Scram.
Event ReporI(LER) File (NUREG-D Regulatory Restriction 4-Other (Explain) 0161)
E-Operator Training A License Examination F Administrative 5
G Operational Error (Explain)
Exhibit I - Same Source 01/77)
II Other (lixplain)
DOCKET NO.
50-29 UNIT Yankee Rowe DATE 780508 4
COMPLETED BY R. M. Sjogren TELEPHONE (617)366-9011 x.218 REPORT N0hTH April 1978 SU4fARY OF OPERATING EXPERIENCES 4/2 At 0100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> a load reduction was commenced to conduct a throttle valve exercise. At 0400 hours0.00463 days <br />0.111 hours <br />6.613757e-4 weeks <br />1.522e-4 months <br /> plant load was 140 MWe and the valve exercise was begun. At 0500 hours0.00579 days <br />0.139 hours <br />8.267196e-4 weeks <br />1.9025e-4 months <br /> the valve exercise was completed and power escalation began. At 0710 hours0.00822 days <br />0.197 hours <br />0.00117 weeks <br />2.70155e-4 months <br /> the plant returned to full power operation.
4/30 At 0905 hours0.0105 days <br />0.251 hours <br />0.0015 weeks <br />3.443525e-4 months <br /> a load reduction was commenced to repack No. 1 Boiler Feed Pump (P-1-1). At 1020 hours0.0118 days <br />0.283 hours <br />0.00169 weeks <br />3.8811e-4 months <br /> plant load was c=160 MWe and repacking of the pump began. At 1420 hours0.0164 days <br />0.394 hours <br />0.00235 weeks <br />5.4031e-4 months <br /> the pump was repacked and power escalation began. At 1530 hours0.0177 days <br />0.425 hours <br />0.00253 weeks <br />5.82165e-4 months <br /> the plant returned to full power operation.
n
S C /f 78 l
I
.. o.:,.
e
~
- 7,,'.
I, 1
- ' [
~, '
- - r c. :.
2_
r,
- c. =
-...+
l
- r. n..,..
- 2.
- a,.-.
r -
.2.-....s-
- r. r c r m 1-p--
- m. - - -
,i,
..a...
1.
- - ~..
..\\.
..._ t
.. - r,, _,....._.,_.
.. i., ;r,.
s.
1-iT F i. " ' r'
- i. T i i i. J.;
~- ~'
~
e
- -I,....
t. D 77.. '.:
t.
c.m 1
. - u n.
i TTr + a:
a.
l ;.1 c 1,e r--
m.., m D**}D "]D l' o
Ju 2.1 c o Ju o