YANKEE ATOMIC NUCLEAR POWER STATION MONTiiLY STATISTICAL REPORT 75-1 FOR THE MONTH OF JANUARY, 1975 e
ee 9
0 n oso 99c
UNIT lujE.
YANKEE ROKE 750206 DATE COM?LETED BY E. C. Tarnu:zer TELEPHONE (617)366-9011 X2585 OPERATING STATUS 1.
REPORTING PERIOD:
750101 THROUGH 750131 744 GROSS HOURS IN REPORTING EERIOD:
175 600 g,.le -13T 2.
CURRENTLY AUTHORIZED POWER, LEVEL IO!t 98%
3 POWER LEVEL TO WHICH RESTRICTED (IF AITY):
14 REASONS FOR P231?ICTIONS (IF ANY):
Linear heat rate limited to 11.5 kw/ft to meet interim criteria on ECCS.
CUMULATIVE THIS MONTH YR-TO-DATE TO DATE
- 5. HOURS REACTOR WAS CRITICAL......
744 744 102,752 6.
REACIOR RESERVE SHUTDOWN HOURS....
0 0
0 7
'IOURS GENERATOR ON-LINE.......
744 744 98,982 8.
Uh1T RESERVE SHUTDOWN HOURS.....
0 0
0 9
GROLS THERMAL POWER GENERATED (10lH).
432,281 432,281 52,060,948
- 10. GROSS ELECTRICAL POWER GENERATED (10lH) 138,042 138,042 15,932,489
- 11. NET ELECTRICAL POWER GENERATED (10?H).
129,915 129,915 14,906,656 100.00 100.00 81.16
- 12. REAC70R AVAILABILITY FACIOR....:
13 UNIT AVAILABILITY FACTOR.......
-100.00 100.00 79.42 1 14 UNIT CAPACITY FACTOR.........
99.78 99.78 68 '. ' 5 3
0.00 0.00 1.10
- 15. UITIT FORCED OUTAGE RATE.......
- 16. SHU,TDOWNS SCHEDULED TO BEGIN IN NEXT 6 IGNTHS (STATE TIFE, D'.1E AND DURATION OF EACH):
Required control. rod drop time measurements.
Scheduled 750222, less than 24.hr. duration.
q 17 IF SHUTDCWN AT E?;D OF REPORT PERIOD, ESTI!'ATED DATE OF STARTUP:
6
s J:O'ARY:
Reactor cperated at 98's, turbine YANKEE RONE near maximum leccause of availability of UNIT NAME cold condenser water.
One 50 fT,fe DATE 750206 reduction for 3 hours3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> on the 24th to dxercise tirbine conirol valves.
COMPLETED BY E. C. T:miu$ey REPORT MONTH JANUARY 1975 PLANT S 11 U T D O b' N S I
METHOD OF TYPE F-FORCED DURATION SHUTTING DOWN NO.
DATE S-SQlEDULED (IIOURS)
REASON (1)
Tile REACTOR (2)
COMMENTS
=
e S
.g
.e%.
. g 0
p 9
g g
W' W
g!E a
r i,}*
[*'r.} *.Y M ** Y ' 9' ' ~
=
c= =>
aE p
g==
e e
s 8
~
\\
t
LQYGR75tME 26 d
s YANKEE R0WE IEIT 750206 DATE COMPLETED BY E. C. Tarnu:zer DAILY PLANT PO*JER OUTPUT MONTil JANUARY 1975 DAY AV5 RAGE DAILY It'e-net
_ DAY AVERAGE DAILY 1rie-net 1
175 25 175 2
175 26 175 3
175 27 175
'4 175 28 175 175 5
175 29
.6 175 30 175 7
175 31 175 8
175 9
175 10 l'75 11 175 12 175 '
13 175 14 175 15 175 16 174 17 174 18 175 19 175 20_
175 21 174 22 174 23 175 24 171 se s
AEC DISTRIBUT:07,: FO,R.P A_RT C,0 C,0CJ'.E_T_ f,.1 ATERI AL, (TE*.*POR A RY FORT.;)
CONTROL NO:
1/+ 91 FILE: MONTHLY REPORT FILE FRO:.1: Yankee Atomic Electric Co.
DATE OF COC DATE REC *D LTR T'.*!X RPT l
OTHER l
Westborough, Mass 2-6-75
'2.10-75 mx L.H.ncider TO:
mv N
SENT LOCAL PDP NRC no 1
CLASS UNCLASS PROPINFO INPUT NO CYS REC'D DOCKET NO:
xmx 1
50-29 DESCRI? TION:
ENCLOSURES:
Ltr trans the following:
Monthly Report for Januarv, 1975 Plant & Component Operability & Availability This Report to be used in prepsring Grey Book by Plans & Opdrations.
No. of Cys Rec'd 1
PLANT NAME:
Yankee.Rowe
~##
FOR ' CTIO */li: FORT.' AT;ON__
IUTLER (S)
SCHWENCER (S)
ZIEMANN (S)
REGAN (E)
W/ Copies W/ Copics W/ Copies W/ Copies CLARK (S)
STOLZ (S)
DICKER (E) 12AR (S)
W/ Copies Wf Copies W/ Copies y/ Copies P/2R (S)'
VASSAL 1D (S)
KNIGHTON (E)
VD. THOMPSON W/ Copics W
Copies W/ Copics W/ 2 Copies
/
(S)
YOUNGELOOD (E)
KNIEL (S)
UR r W/ Copies ~~
W/ Copics W/ Copics W/ Copies INTERNAL DISTR!SUT:C::
g-i?ZGJJlf #
TECH REVIEW DEh f0N LIC ASST A/T IND SCHROEEER GRIlGS DIGGSiS)
ERAITMM1 L'/IC PDR*
MACCARP,Y GAMMILL GEARIN (S)
S ALTZMAN CSC, ROOM P-506-A MUhTZING/ STAFF KNIGHT KASTNER GOULEOURNE (S)
B. HURT CASE PAULICKI BALLARD KREITIZER (E)
GINGUSSO SHAD SPANGLER LEE (S)
J'LANS SOYD STELLO MAIGRET (S)
FMCDONALD MOORE,' (S) (BWR)
HOUSTON ENVIRO REED (E) dHAPMMI DEYOUNG (S) (PWR)
NOVAK MULLER SE. ' ICE (S)
DUBE w/ input SKOVHOLT (S)
ROSS DICKER n.PPARD (S)
E. COUPE GOLLER- (S)
IPPOLITO KNIGh' ION SL/JER (E)
P. COLLINS TEDESCO YOUNGBLOOD SMITH (S)
D. THOMPSON (2)
DENISE LONG REGAN TEETS (S)
KLECKER REG OPR LAINAS PROJECT LDR WILLIN:S (E)
EISENHtTI FILE & REGION (2)
BEN /30YA WILSON (S)
VOLI!GR HARLESS INGRR1 (S)
T.R. WILSON 373g3g
/f -
EXTER:: AL DISTRIEUTCN i.
d-LOCAL PDR (1)(2)(10)-tuJIONAL LABS 1-PDRSr;/1,hNY d-TIC ( AIERN! HY) 1-W. PENNINGTON, RM-E-20lG.T.
1-3R000UNEN NAT LJ dA-NSIC(EUCH/J:!J:)
1-CONSULTMTS 1-G.ULRIKSON,02::L l-ASL3 NEin! ARK /3LU12/AGSALIAN 1-!S12D RUTH GU5E::l 1 '7.LTON A #2XSON g
h, RCOM B-l':7 G.T.
i O
g(N 1-J,ic;;mLI;,y:.r.:
15-/.C U EU' DING b.I.