ML19339B177
| ML19339B177 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 10/29/1980 |
| From: | Morisi A BOSTON EDISON CO. |
| To: | Eisenhut D Office of Nuclear Reactor Regulation |
| References | |
| 80-271, NUDOCS 8011060459 | |
| Download: ML19339B177 (2) | |
Text
_ _
' s.
e BOSTON EDISON COMPANY oemsSAi.O m esS sOO sov69tou stScar so SrQN. M ASSACHUSETTS O 219 9 **
A. V. M O RIE S MANAGER NUCLEAR OPERATIONS SUPPORT DEPARTMENT
,,,,,y j< g i...
October 29, 1980
~
j}WC3 BECo. Ltr. #80-271 Mr. Darrell G. Eisenhut, Directnr Division of Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D. C.
20555 License No. DPR-35 Docket No. 50-293
Reference:
Letter D. Eisenhut to BECo.
" Environmental Qualification of Safety-Related Equipment" dated October 1, 1980
Attachment:
Pilgrim Unit #1 Environmental Qualification Test Infonnation
Dear Sir:
As requested in the above referenced letter Boston Edison Company herein provides 1
in Attachment 1) to this letter all available information relative to environ-mental qualification testing to be conducted within the next two (2) years on equipment used or to be used at Pilgrim Unit #1.
Please be advised that as testing dates are scheduled and if additional testing is planned we will make every effort to notify you, sufficiently in advance, to assist in your planning and scheduling.
If you have any questions concerning'this information please do not hesitate to contact us.
Very truly yours, cc: Mr. Boyce H. Grier 00/
Office of Inspection and Enforcement b
Region I 1
U.S. Nuclear Regulatory Commission 631 Park Avenue
/[
]
King of Prussia, PA.
19406 i
8011060 459 f
f! j AttacMent #1 Pilgrim Unit #1 Environmental Qualification Test Infomation A_
- 1) Comsip Delphi Inc.
Delphi IV Hydrogen Analyzer 2)
H /02 Monitoring of Primary Containment 2
- 3) Engineering-Analysis and Test Company 4676 Admiralty Way Marina Del Ray, Calif.
Schedule: To be determined 4)
J. Coughlin E
- 1) Thennon Manufacturing Company
- 2) Heat Trace H /02 Sample Lines 2
- 3) Southwest Research Institute 6220 Culebra Road San Antonio, Texas Schedule: To be determined C
- 1) Square D Company 120/240 VAC I-Line Panelboard 2) 120 Volt Emergency Power
- 3) Square D Compsny 252 North Tippecanoe Peru, Indiana-Schedule: Seismic Test 1/26/81 4)
J. Coughlin i