- Y
[N nuag%
~
UNITED STATES
[
(}
NUCLEAR REGULATORY COMMISSION
)
- ' '/
c REGION IV i
9, hD,
'/
611 RY AN PLAZA DRIVE, SUITE 1000 l
f AR UNGTON, TEX AS 76012 27 AUS 330 Docket No. 99900509/80-03 Stone and Webster Engineering Corporation Attn:
Mr. N. B. Cleveland Vice President Quality Assurance P. O. Box 2325 Boston, Massachusetts 02107 Centlemen:
This refers to the QA Program Inspection conducted by Mr. J. R. Costello of this office on August 4-8, 1980, of your facility at Boston, Massachusetts, and to the discussions of our findings with you and members of your staff at the conclusion of the inspection.
Areas examined during the QA Program inspection and our findings are discussed in the enclosed report. Within these areas, the inspection consisted of an exnnhation of procedures and representative records, interviews with personnel, and observations by the inspector.
During this inspection it was found that the implementation of your Qa Program failed to meet certain NRC requirements.
The specific findings and references to the pertinent requirements are identified in the enclosures to this letter.
Please provide us within thirty (30) days a written statement containing, (1) a description of steps that have been or will be taken to correct item (s), (2) a description of steps that have been or will be taken to prevent tecurrence, and (3) the dates your corrective actions and preventive measures were or will be ccepleted.
In accordance with Section 2.790 of the Commission's " Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations, a copy of this letter with enclosure and your reply together with the enclosed inspection report will be placed in the Commission's Public Document Room.
If this report contains any information that you believe to be proprietary, it is necessary that you make a written application within thirty (30) days to this office to withhold such information from public disclosure.
Any such application must include a full statement of the reasons on the basis of which it is claimed that the infor stion is proprietary, and should be prepared so that proprietary information identified in the application is contained in a separate part of the document.
If we do not hear from you in this regard within the specified period, the report will be placed in the Public Document Room.
8011060 3f
3 l
Stone and Webster Engineering Corporation 2
Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Sincerely, l
/!
e N
/
Uldi otapovs, Chi j
Vendor Inspection B anch i
Enclosures:
1.
Notice of Deviation 2.
Inspection Report No. 99900509/80-03 i
[