THE COMMONWEALTH OF M ASSACHUSETTS f
DEPARTMENT OF THE ATTORNEY GENERAL g
i y, JOHN W. Mc COrtMACK STATE OFFICE BUILDING j
ONE A5H5URTON PLACC. ROSTON 02108 Mj ves g,[.
~, -
July 22, 1977 ra m era x. scotory, s
,,,.. -..~...
' ' *Il-U vi'h Mr. Edson G.
Case Director of Regulation U.S.
Nuclear Regulatory Commission Q
[
l Washington, D.C.
20555
Dear Mr. Case:
We recently learned that the shutdown of the Yankee Atomic nuclear power plant in Rowe, Massachusetts, involves sub-stantially more than a normal refueling.
In pursuing this matter, persons from this staff have spoken with Mr. Fred Burger, the Project Manager, and Messrs. Eldon Brunner, Burt Davis, and Bill Lazarus at N.R.C.
in King of Prussia, Pennsylvania.
They indic-ated their intention to send this office the available written material including meeting minutes and accident analyses reports.
This letter will confirm our request for that information.
It is my understanding, based on the conversations with these gentlemen, that Yankee Atomic was shut down during a
" coast-down," a few weeks before a scheduled refueling.
The " prob-lem" has been described to us as an Emergency Core Cooling System condition that had not been considered in the evaluation of ECCS cffectiveness.
Apparently the omission was discovered during a routine re-fueling analysis.
Certain questions surrounding this incident continue to concern us.
Primarily, I am interested in understanding the prob-lem at the Rowe plant from a layperson's perspective, how it hap-pened and what steps are being taken to correct it.
I hope that you can clarify the situation for me by answering the following questions:
(1)
What, precisely, is the nature of the situation which resulted in the plant shutdown?
Is it a violation of,'or nonconformity with, any N.R.C.
regulations?
(2)
Yankee Atomic was preparing for Core 13.
Presumably, therefore, several pre-refueling analyses were prepared in the past.
Why did this situation go undiscovered until so recently ?
(3)
What, precisely, is being undertaken to remedy this situation?
We were told that some computer tests are being done M'
8011080 D d
s Mr. Edson G. Case Jdly 22, 1977 Page 2.
i and that some piping is being modified.
Are the entire ECCS and other safety systems being reanalyzed in a search for other
" omissions?"
Are other design or equipment modifications neces-sary?
(4)
Mr. Burger explained that Yankee Atomic shut down because it was the prudent thing.to do but that it could have.
operated, at least until refueling, at a lower power level.
Yankee Atomic was at 68% capacity when it shut down.
At what level could it have safely operated, staying within NRC regula-tion specifications for heat rate?
(5)
Will the plant be able to operate at its licensed power level after this problem is resolved, or will a license amendment be forthcoming?
(6)
What is the relationship between the computer anal-i ysis and'the piping modifications, both of which are apparently being undertaken now?
Is the computer analysis intended to test the offectiveness of the ECCS as modified?
If so, how can it be performed prior to completion of the changes in the ECCS?
I thank you in advance for your attention to this matter.
Very truly yours, 4h/
4 e
E LYN R. WEISS Assistant Attorney General Environmental Protection Division One Ashburton Place,-19th Floor Boston, Massachusetts 02108 (617) 727-2265 ERW:JK i
I cc.
Mr. Fred Burger l
Project Manager Thomas Merrigan, Esq.
1 Greenfield, Mass.
l l
1hr. Eldon Brunner U.S.-N.R.C.
King of. Prussia, Pa.
u.s. nucle An AscuLAtcay c. usSsicN occKarNuursn
' NBC pony 195
@~19 esass NPC OlSTRIBUTION rom PART 50 DOCKET MATERIAL FROM:
DATs or occuusNT TO:
Edson G. Case MA Dept of the Attorney Gen 7/22/77 Boston, MA cats meenivs o E. R. Wiess 7/27/77 s
eTTra NoTomizso P a o*
INPutsomu Nuusta of COPIES msCElVto
)
so*N AL LASSIF a t o sNetoSu ma esscairrios Request for additional info regarding the 'early' shutdown of the facility and the Emer;ency Core Cooling System i
't, problem atsociated with the early shutdown.
2p i
PLANT NAME: Yankee Rowe Atomic Power Plant RBT 7/27/77 FOR ACTION /INFORMATION ENVIPSNMENTAL captw
- l. AccicNED AD.
h ASSIGNED ADr V. MOORE (LTR)
,/al } BRANCH CHIEFt
'/ nuancu cHTEF,
(:
FROJECT MANAGER:
VUWW'Wl
// PROJECT MANAGER:
LICE'ISING ASSISTANT
}
LICENSING ASSISTANT l
l B. MARLESS INTERN AL DISTRIBUTION I
PLANT SYSTEMS l
SITE SAFETY &
/} nen TTe r9 SYSTFMS SAFETv V M'ec nee HEINtHAN TEDESCO
(
ENVIRON ANALYSIS 4
SCHPOEDER BENAROYA 1
DEN ~tN & MULLER
/I/ s. rN l A cria ~
LATNAs I i e et'Tcuv7ern lCSeSTcv & STATT ENGINEERING lIPPOLITO I
w !a' ?
vNTaut iF. ROSA i "NVIRO TECH.
uvec POSNAR l
i ERNST v
STuvELL OPERATING REAC"VRS I 3ALLARD c m e?
unvn P A'A T cvT STELLO YOUNGELOOD rTcrNutfT ventrr'- vaNacEYrNT REa c top cAFEW SHAO
~~~~ ~~~"*
evowot T EOSS EAER
- o. cat'TMS NOVAK EUTLER GAMMILL (2)
Mot'S S N ROSZTOC:"f GRIMES i
l vrLT" CHECK SITS ANALYSIS i VOLLMER urLTrvrs I
I EUNCH ev AT&T SALTS'AN I
I J. COLLINS I
IFUT?EFG I
IKREGER l
EXTERNAL DISTRIBUTICN CONTROL NUMBE R I
X ty R2(b 4 e / /, F/d.
l I
'l
l i
l i
'g 772090N0c.
- yy t a n
! Ie q IV <J.
HANCHITT) t i
jp I-16 CYS ACRS SENT CATIGCRY
~ - -
,, E Pt @
!l
'~
l i
4 l
ng nf v)..i n.
c i n a b, 3 {. j
{j,y,'.
y I
NAC 8 CRM 195 f 2 76)
~
E b Wux, ato m