ML19339A132
| ML19339A132 | |
| Person / Time | |
|---|---|
| Site: | Arkansas Nuclear |
| Issue date: | 10/09/1980 |
| From: | Clark R Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML19339A124 | List: |
| References | |
| NUDOCS 8011030107 | |
| Download: ML19339A132 (2) | |
Text
.
C-I 7590-01 UNITED STATES NUCLEAR REGULATORY COPMISSION_
DOCKET NO. 50-368 ARKANSAS POWER AND LIGHT COMPANY ARKANSAS NUCLEAR ONE, UNIT 2 NOTICE OF ISSUANCE OF AMEN 0 MENT TO FACILITY OPERATING LICENSE i
The U. S. Nuclear Regulatory Comission (the Commission) has issued Amendnent No.16 to Facility Operating License No. NPF-6 issued to Arkansas Power and Light Company for Operation of Arkansas Nuclear One, Unit 2 (the
]
The amend-facility) located at the licensee's site in Pope County, Arkansas.
j 1
ment was effective as of September 19, 1980.
The amendment revised the Appendix A Technical Specifications by specifying that the two independent containment cooling groups shall be operable with at least one operational cooling unit per group. The Appendix A Technical Specifications had previously requimd that the two independent l
l containment cooling groups shall be operable with two operational cooling units in one group and at least one operational cooling unit in the second i
The revision also increased the frequency of verifying the service group.
water flow rate of the containment cooling groups from once every 31 days to once every 14 days with chlorination of the service water whenever the water temperature is between 60 and 80 degrees Fahrenheit.
The application for the amendment complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Comission's rules and regulations. The Comission has made appropriate i
findings as required by the Act and the Comission's rules and regulations in 10 CFR Chapter I, which are set forth in the license amendment. Prior 4
public notice of this amendment was not required since the amendment does not involve a significant hazards consideration.
WY
r
. The Comission has determined '. hat the issuance of this amendment will
'not result in any significant environmental impact and that pursuant to 10 CFR Section Sl.5(d)(4) an environmental impact statement or negative declaration and environmental impact appraisal need not be prepared in connection with the issuance of this amendment.
For further details with respect to this action, see (1) the application for amendment dated September 16,1980,(2) the Commission's letter to the licensee dated September 19, 1980 (3) Amendment No. 16 to Facility Operating License No. NPF-6, and (4) the Commission's related 'efety Evaluation. These items are available for public inspection at the Commission's Public Document Room at 1717 H Street, N. W., Washington, D. C. 20555 and the Arkansas Polytechnic College, Russellville, Arkansas 72801.
A copy of items (2),
(3), and (4) may be obtained upon request addressed to the U. S. Nuclear Regulatory Commission, Washington, D. C. 20555, Attention: Director, Division of Licensing.
Dated at Bethesda, Maryland this 9th day of October 1980.
FOR THE NUCLEAR REGULATORY COMMISSION
. 3-k GA Robert A. Clark, Chief Operating Reactors Branch #3 Division of Licensing