TOLEDO

%sm EDISON Docket No. 50-346 Rcwac P Cacuss License No. NPF-3 Oc'.$7 "

i4131253-522' Serial No. 649 October 27, 1980 Director of Nuclear Reactor Regulation Attenticn:

Mr. Robert W. Reid, Chief Operating Reactors Branch No. 4 Division of Licensing United States Nuclear Regulatory Commission Washington, D. C.

20555

Dear Mr. Reid:

On December 7, 1979, (Serial No. 562) Toledo Edisoa committed to an electrical bus voltage test program at the Davis-Besse Nuclear Power Station, Unit 1.

Phase I testing was to be completed prior to the end of the first scheduled refueling outage.

One test of the series must be postponed.

Specifically, Test Case 12121 involved monitoring bus voltages during a reactor coolant pump motor start with one startup and two bus-tie transformers.in se rvice.

This test cannot be perfor=ed until Toledo Edison's request for a undervoltage circuit bypass is approved. This was requested via a technical specification change request dated March 23, 1979 to the NRC.

This test will be rescheduled at the next planned outage of sufficient length after approval of our request.

Very truly yours, W-RPC:TJM: sic cc: NRC Resident Inspector

))/

3

/ D THE TOLEDO ECISCN COMPANY ECISCN PLAZA 300 MACISCN AVENUE TCLEDO. CHIO 43S52 8010310 811

-)