71 Metropolitan Edison Company Post Office Box 480 1
Middletown, Pennsylvania 17057 Writer's Direct Dial Number October 7,1980 TLL 499 Office of Inspection and Enforcement Attn:
Mr. Boyce H. Grier, Director Region I U. S. Nuclear Regulatory Commission 631 Park Avenue King of Prussia, Pennsylvania 19406
Dear Sir:
Three Mile Island Nuclear Station, Unit 2 (TMI-2)
Operating License No. DPR-73 Docket No. 50-320 IE Bulletin 80-18 This is in response to the subject bulletin entitled " Maintenance of Adequate
'finimui Flow Thru Centrifugal Charging Pumps following Secondary Side High Energy Line Rupture".
We have reviewed the subject bulletin and detemined that further investigation may be necessary regarding the Make-Up and Purifi-cation system (MU). The MU system pumps perfom the function of the centrifugal charging pumps in the scenario addressed in the bulletin.
However, due to the Unit 2 facility being in the recovery mode with the MU system not being utilized for RCS inventory control, the concerns addressed in the bulletin are not applicable to this unit while in the present mode. Therefore, this bulletin is classified as a long-term action as defined in our letter of May 29,1980 (TLL 247).
Sincerely, G. K. Hovey Vice-President and Director, TMI-2 CKH:SDC: dad cc: John T. Collins Bernard J. Snyder l
l 8810310081 Metropo!: tan Ed. son Cornpany :s a f/ ember of the General Pubhc Utit.es System