ML19338G449

From kanterella
Jump to navigation Jump to search
Forwards Proposed Findings of Fact & Conclusions of Law in Form of Partial Initial Decision Re Environ & Site Suitability.Table of Contents Encl
ML19338G449
Person / Time
Site: 05000514, 05000515
Issue date: 10/22/1980
From: Hastings W
PORTLAND GENERAL ELECTRIC CO.
To: Bowers E, Jordan W, Martin W
Atomic Safety and Licensing Board Panel
Shared Package
ML19338G450 List:
References
NUDOCS 8010290378
Download: ML19338G449 (2)


Text

o Y

s James W. Dumam

_ Portland General Electric Coripany Vce Presscent and Gersra' Counse; i

Legal Department Senor Assstant GeneralCounse!

Alvin Alexance: son Warren Hastings October 22, 1980 Rchard M. Sarovik Assstant GeneralCounset Roland A. Johnson Ronald W. Johnson Darias A. Marckx Elizabeth S. Bowers, Esq.

Steven F. McCarrel Chairman Dorotny E.Rotnrock Atomic Safety and Licensing Board Panel U.

S. Nuclear Regulatory Commission Washington, D. C.

20555 Dr. William E. Martin Senior Ecologist Battelle Memorial Institute Columbus, Ohio 43201 Dr. Walter H. Jordan 881 West Outer Drive Oak Ridge, Tennessee 37830 In the Matter of PORTLAND GENERAL ELECTRIC COMPANY (Pebble Springs Nuclear Plant, Units 1 and 2)

Docket Nos. 50-514 and 50-515

Dear Members of the Board:

In accordance with the Board's Order directing the filing of Proposed Findings on site suitability and related issues, Applicants' Proposed Findings are enclosed herewith.

A copy of this letter and a copy of the Proposed Findings are being mailed this date to all parties of record.

Sincerely yours,

[

jh,n:

Warren Hast WH:dp Enclosure c:

All Parties 1300 Willamette Center 121 S.W. Salmon Street, Portland, Oregon 97204 (503)220 3000 8010290 37E 6

a APPLICANT'S PROPOSED FINDINGS OF FACT AND CONCLUSIONS OF LAW 4

IN THE FORM OF A PARTIAL INITIAL DECISION AS TO SOME ENVIRONMENTAL AND SITE SUITABIIITY MATTERS 4

4 TABLE OF CONTENTS E

I.

INTRODUCTION AND BACKGROUND II.

FINDINGS OF FACT - ENVIRONMENTAL MATTERS A.

National Environmental Policy Act Requirements and the Environmental Impact Statements B.

Compliance With Federal Water Pollution Contr61 Act C.

Impacts of Construction 1.

Land Use 2.

Water Use 3.

Ecological Systems 4.

Radiological Effects on Construction Workers 5.

Socioeconomic Effects D.

Impacts of Operation i

1.

Land Use 2.

Water Use 3.

Heat Dissipation System 4.

Nonradiological Effects on Ecological Systems 4

5.

Socioeconomic Effects 1

6.

Radiological Effects E.

Environmental Monitoring F.

Environmental Effects of Postulated Accidents G.

Environmental Effects of Transportation of Radioactive Material H.

Environmental Effects of the Uranium Fuel Cycle I.

Alternatives to the Proposed Plant J.

Alternative Sites K.

Plant Design Alternatives III. FINDINGS OF FACT - SITE SUITABILITY j

A.

Population Density and Use Characteristics B.

Nearby Industrial, Transportation and 'tillitary Facilities C.

Meteorology D.

Hydrology E.

Foundation Engineering F.

Geology G.

Volcanology H.

Seismology IV.

CONCLUSIONS OF LAW V.

ORDER e

4 e

9