Submits Info Re BWR Scram Sys,In Response to NRC . Util Will Submit re-evaluation of Scram Sys & Schedule for Implementation of Mods by 801215
ML19338G436
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 10/24/1980
From: Bayne J
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
To: Ippolito T
Office of Nuclear Reactor Regulation
References
JPN-80-48, NUDOCS 8010290350
Download: ML19338G436 (2)


Text

.

POWER AUTHORITY OF THE STATE OF NEW YORK 10 CoLUMous CincLE NEW YORK. N. Y.10019 (212) 397 6200 TRustras ozonott.stRRY JoNN s.orsoN

    • ^'"~^~

Orga4 Time OFFicam

"" I'*c',.5 v"c GEORGE L. INGALLs v1CE CMal4M AN Patst0ENT h DIRECTO4 OF POWNER OPERATIONS RICN A RD M. FLYNN JOsEPHR SCHMIEDER Re. RT i. uiLLoNu

'""c"

PREDERICK R. CLARK LERoy. INCLAIR

"."' ?.", ', 'em ' *'"'

October 24, 1980 JPN-80-48

",^ ',,,",;, ','l' E.L..,..,

t esNERAL COWNSEL Director of Nuclear Reactor P9gulation United States Nuclear Regulatory Commission Washington, D. C.

20555 Attention:

Mr. *ihomas A.

Ippolito Operating Reactors Branch No. 2 Division of Licensing

Subject:

James A. FitzPatrick Nuclear Power Plant BWR Scram System Docket No. 50-333

Dear Sir:

In response to items (1), (2) and (3) of your letter of October 1, 1980 regarding the BWR scram system, the Authority provides the following:

(1)

The results of any reassessment of your present scram system to confirm con-formance with the General Design Criteria (Appendix A to 10 CFR 50)

Response

The scram system of the FitzPatrick Plant has been reassesed and is, in conformance with the General Design Criteria (Appendix A to 10 CFR 50).

(2)

Whether you intend to reevaluate your present scram system and modify it as necessary to meet the additional design and performance criteria developed by the Owners Sub-Group.

If not, what criteria will be used to judge the adequacy of your present scram system?

\\

8010290350

/

s x

~

~

2-JPN-80-48

Response

The Authority intends to reevaluate the present scram system based on the draft criteria developed by the BWR Owners Sub-Grcup.

The draft criteria have not been fully reviewed by our staff (3)

Whether you intend to provide by December 15, 1980, the results of the above reevaluation (including required modifi-cations) along with a schedule for implementation.

If not, why not.

~

Response

After review of the Owner's Sub-Group criteria, the Authority will reevaluate the scram system.

The Authority intends to provide the results of this reevaluation and a schedule for implementation of the required modifications by December 15, 1980.

i Very truly yours,

,r

\\ /

P[. Bayne b 'I

'N J.

Senior Vice President 4

' Nuclear Generation 4

Subscribed and sworn to before me this 24th day of October, 1980

.i Notary Public mjTH G. D CF New Y0rk Neter/ ?ef.}c.,Ffy RR/ds c..sn: J.Ol FJ cw,