POWER AUTHORITY OF THE STATE OF NEW YORK 10 CoLUMous CincLE NEW YORK. N. Y.10019 (212) 397 6200 TRustras ozonott.stRRY JoNN s.orsoN
- ^'"~^~
Orga4 Time OFFicam
"" I'*c',.5 v"c GEORGE L. INGALLs v1CE CMal4M AN Patst0ENT h DIRECTO4 OF POWNER OPERATIONS RICN A RD M. FLYNN JOsEPHR SCHMIEDER Re. RT i. uiLLoNu
'""c"
PREDERICK R. CLARK LERoy. INCLAIR
"."' ?.", ', 'em ' *'"'
October 24, 1980 JPN-80-48
",^ ',,,",;, ','l' E.L..,..,
t esNERAL COWNSEL Director of Nuclear Reactor P9gulation United States Nuclear Regulatory Commission Washington, D. C.
20555 Attention:
Mr. *ihomas A.
Ippolito Operating Reactors Branch No. 2 Division of Licensing
Subject:
James A. FitzPatrick Nuclear Power Plant BWR Scram System Docket No. 50-333
Dear Sir:
In response to items (1), (2) and (3) of your letter of October 1, 1980 regarding the BWR scram system, the Authority provides the following:
(1)
The results of any reassessment of your present scram system to confirm con-formance with the General Design Criteria (Appendix A to 10 CFR 50)
Response
The scram system of the FitzPatrick Plant has been reassesed and is, in conformance with the General Design Criteria (Appendix A to 10 CFR 50).
(2)
Whether you intend to reevaluate your present scram system and modify it as necessary to meet the additional design and performance criteria developed by the Owners Sub-Group.
If not, what criteria will be used to judge the adequacy of your present scram system?
\\
8010290350
/
s x
~
~
2-JPN-80-48
Response
The Authority intends to reevaluate the present scram system based on the draft criteria developed by the BWR Owners Sub-Grcup.
The draft criteria have not been fully reviewed by our staff (3)
Whether you intend to provide by December 15, 1980, the results of the above reevaluation (including required modifi-cations) along with a schedule for implementation.
If not, why not.
~
Response
After review of the Owner's Sub-Group criteria, the Authority will reevaluate the scram system.
The Authority intends to provide the results of this reevaluation and a schedule for implementation of the required modifications by December 15, 1980.
i Very truly yours,
,r
\\ /
P[. Bayne b 'I
'N J.
Senior Vice President 4
' Nuclear Generation 4
Subscribed and sworn to before me this 24th day of October, 1980
.i Notary Public mjTH G. D CF New Y0rk Neter/ ?ef.}c.,Ffy RR/ds c..sn: J.Ol FJ cw,
c,r.,.--H
,. ' :s,t :r:,1 L119_y '