Al bama Power Company 600 North 18+n Street
/W Post office Box 2641 Birmingham, Alabama 35291
/
Telephone 205 250-1000 F. L CLAYTON, JR.
Senior Vice President
[d3m3 %gygf the southem eieCinC System October 22, 1980 Mr. Steven A. Varga Acting Assistant Director for Light Water Reactors Division of Project Management U. S. Nuclear Regulatory Coninission Washington, D. C.
20555
Dear Mr. Varga:
In response to your letter of April 20, 1980, concerning Category I Masonry Walls, Alabama Power Company committed (by my letter dated September 2,1980) to complete re-evaluation of masonry walls at Farley Nuclear Plant Unit 2 by November 7, 1980.
An initial walkdown has been completed identifying all concrete block walls and allowing a preliminary assessment that no structural problems exist. However, in order to perform a detailed engineering re-evaluation, it is necessary to prepare as-built engineering drawings of each of the walls. This effort is requiring more time than originally anticipated.
It is expected that engineering re-evaluation of these as-built drawings will be completed by December 15, 1980. At that time, any exceptions or deviations from SRP requirements for block wall re-evaluation will be reported and discussed.
If there are any questions, please advise.