Notifies That Complete re-evaluation of Masonry Walls Has Been Postponed to 801208 to Permit Detailed Engineering Evaluation of as-built Drawings
ML19338G119
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 10/22/1980
From: Clayton F
ALABAMA POWER CO.
To: Varga S
Office of Nuclear Reactor Regulation
References
NUDOCS 8010280463
Download: ML19338G119 (1)


Text

___ -_-- - - - _

Al bama Power Company 600 North 18+n Street

/W Post office Box 2641 Birmingham, Alabama 35291

/

Telephone 205 250-1000 F. L CLAYTON, JR.

Senior Vice President

[d3m3 %gygf the southem eieCinC System October 22, 1980 Mr. Steven A. Varga Acting Assistant Director for Light Water Reactors Division of Project Management U. S. Nuclear Regulatory Coninission Washington, D. C.

20555

Dear Mr. Varga:

In response to your letter of April 20, 1980, concerning Category I Masonry Walls, Alabama Power Company committed (by my letter dated September 2,1980) to complete re-evaluation of masonry walls at Farley Nuclear Plant Unit 2 by November 7, 1980.

An initial walkdown has been completed identifying all concrete block walls and allowing a preliminary assessment that no structural problems exist. However, in order to perform a detailed engineering re-evaluation, it is necessary to prepare as-built engineering drawings of each of the walls. This effort is requiring more time than originally anticipated.

It is expected that engineering re-evaluation of these as-built drawings will be completed by December 15, 1980. At that time, any exceptions or deviations from SRP requirements for block wall re-evaluation will be reported and discussed.

If there are any questions, please advise.

Yours truly, f?v y

nF. L. Clayton, Jr.

DHJ:de cc: Mr. R. A. Thomas Mr. G. F. Trowbridge Mr. L. L. Kintner O /